Loading…
Loading…
| # | Company | Offered Item | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.3 Cr Construction of 1 no. Check Dam of size 45m x 0.60m x 1.50m and 1 no. Percolation Tank Bund of 120m length in Ibrahimpatnam site of SVP NPA, Hyderabad. | Construction of 1 no. Check Dam of size 45m x 0.60m x 1.50m and 1 no. Percolation Tank Bund of 120m length in Ibrahimpatnam site of SVP NPA, Hyderabad. | ₹2.3 Cr | L1 | - |
| 2 | L2₹2.4 Cr+₹6.4 L (2.77%)Financial bid opened Construction of 1 no. Check Dam of size 45m x 0.60m x 1.50m and 1 no. Percolation Tank Bund of 120m length in Ibrahimpatnam site of SVP NPA, Hyderabad. | Construction of 1 no. Check Dam of size 45m x 0.60m x 1.50m and 1 no. Percolation Tank Bund of 120m length in Ibrahimpatnam site of SVP NPA, Hyderabad. | ₹2.4 Cr+₹6.4 L (2.77%) | L2 | Financial bid opened |
| 3 | L3₹2.4 Cr+₹7.7 L (3.31%)Financial bid opened Construction of 1 no. Check Dam of size 45m x 0.60m x 1.50m and 1 no. Percolation Tank Bund of 120m length in Ibrahimpatnam site of SVP NPA, Hyderabad. | Construction of 1 no. Check Dam of size 45m x 0.60m x 1.50m and 1 no. Percolation Tank Bund of 120m length in Ibrahimpatnam site of SVP NPA, Hyderabad. | ₹2.4 Cr+₹7.7 L (3.31%) | L3 | Financial bid opened |
| 4 | L4₹2.4 Cr+₹8.8 L (3.80%) Construction of 1 no. Check Dam of size 45m x 0.60m x 1.50m and 1 no. Percolation Tank Bund of 120m length in Ibrahimpatnam site of SVP NPA, Hyderabad. | Construction of 1 no. Check Dam of size 45m x 0.60m x 1.50m and 1 no. Percolation Tank Bund of 120m length in Ibrahimpatnam site of SVP NPA, Hyderabad. | ₹2.4 Cr+₹8.8 L (3.80%) | L4 | - |
| 5 | L5₹2.4 Cr+₹9.3 L (4.03%)Financial bid opened Construction of 1 no. Check Dam of size 45m x 0.60m x 1.50m and 1 no. Percolation Tank Bund of 120m length in Ibrahimpatnam site of SVP NPA, Hyderabad. | Construction of 1 no. Check Dam of size 45m x 0.60m x 1.50m and 1 no. Percolation Tank Bund of 120m length in Ibrahimpatnam site of SVP NPA, Hyderabad. | ₹2.4 Cr+₹9.3 L (4.03%) | L5 | Financial bid opened |
| Sl No | Description | Qty | Unit | M/s Abdul Mazid and Abdul Aziz L10 | B VENKATESWARA RAO L11 | Ch. Bhanu Teja L5 | IZHAR AHMED L13 | SHRI SYED FAREEDUDDIN L6 | SCS Infrastructures Private Limited L2 | Puli Paparao L4 | D.UMA MAHESWARA RAO L7 | SRINIVAS AND CO L9 | V IDDAIAH L3 | KRESTONE PROJECTS PRIVATE LIMITED L1 | AKSHARA INFRA PROJECTS. L8 | MAA Chamunda Construction Company Barmer L12 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Civil | - | - | -28.86 ₹2,68,91,536 | -27.26 ₹2,74,96,350 | -36.22 ₹2,41,09,392 | -21.16 ₹2,98,02,203 | -33.78 ₹2,50,31,733 | -36.99 ₹2,38,18,326 | -36.36 ₹2,40,56,471 | -33 ₹2,53,26,580 | -31.14 ₹2,60,29,676 | -36.66 ₹2,39,43,069 | -38.69 ₹2,31,75,711 Lowest | -32.85 ₹2,53,83,282 | -22.7 ₹2,92,20,069 |
Tender Value
₹3.8 Cr
EMD Value
₹7.6 L
Closing Date
7 Aug 2025, 3:00 pmClosed
EE-Hydrabad-I
BASAVARAJ M CHIDRE
O/o. the Executive Engineer, Hyderabad-I, CPWD, Nirman Bhavan, Koti, Hyderabad
Construction of 1 no. Check Dam of size 45m x 0.60m x 1.50m and 1 no. Percolation Tank Bund of 120m length in Ibrahimpatnam site of SVP NPA, Hyderabad.
121636
28/2025-26/Hyd-I/Hyderabad (12/CE-HYD/2025-26)
OPEN
Civil Works - Others
NCB
8 months
Hyderabad, Telangana
7 documents required · 7 mandatory
₹7.6 L
Not Applicable
7 Aug 2025
30 Jul 2025
7 Aug 2025
7 Aug 2025
4 Aug 2025
stage.html
html • 0.07 MB
boq_comp_chart.xls
xls
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
28_2025-26_Hyd-I_Hyderabad_TenderNotice.pdf
document • 0.82 MB
28_2025-26_Hyd-I_HyderabadNIT.pdf
document • 1.92 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .