| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.1 CrAccepted-AOC | ₹9.1 Cr Quoted ₹9.4 Cr | L1 | Accepted-AOC Quoted Less Percentage |
| 2 | L2₹9.8 Cr+₹36.3 L (3.85%)Rejected-AOC | ₹9.8 Cr+₹36.3 L (3.85%) | L2 | Rejected-AOC Quoted Above Percentage |
| 3 | L3₹9.9 Cr+₹45.3 L (4.81%)Rejected-AOC 25A KALIYAPPA GOUNDER STREET MATHIGONPALAYAM DHARMAPURI DISTRICT 636 702 | 636702 | ₹9.9 Cr+₹45.3 L (4.81%) | L3 | Rejected-AOC Quoted Above Percentage |
Tender Value
₹9.1 Cr
EMD Value
₹4.6 L
Closing Date
23 Oct 2025, 10:30 amClosed
SE H C and M Salem
O/o the Superintending Engineer (Highways), Construction and Maintenance Circle, Salem Steel Plant Main Road, Jagir Ammapalayam, Salem
Strengthening at Km 75/00 to 80/965 to (Palacode Section), Km 82/214 to 84/564 (Somanahalli Bypassed Section), Km 86/035 to 88/910 (Pulikarai Bypassed Section) of Malur Hosur Adhiyamankottai Road (SH 17) (Abandoned section of NH 844)
2025_HWAY_604493_1
32 / 2025-2026 / HDO, Dated. 06.09.2025-3
Open Tender
Civil Works - Roads
Percentage
210 days
Dharmapuri
Refer Tender Document
3 documents required · 3 mandatory
₹0
₹4.6 L
17 Aug 2026
15 Sept 2025
23 Oct 2025
15 Sept 2025
23 Oct 2025
16 Sept 2025
16 Sept 2025 - 16 Sept 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Removal of the Black Topped (BT) surface to 50 to 70mm depth using Milling machine, including conveying the milled waste materials away from the worksite to an average distance including hire and running charges for the machine, conveyance charges, unloading at unobjectionable place, cleaning the milled surface as to avoid slippery including all other incidental charges etc. complete as per the direction of the departmental officers | 6,678 | One square Metre | 107.71 | ₹7,19,287.38 |
| 2 | Picking the existing BT surface upto 50mm thick as directed by the Departmental officers and collecting the picked up salvaged metal and stacking the same for reuse and depositing the debris excludung cost of materials including all labour charges for picking and all other tools and plants employed of the work and including all other incidental charges etc.,complete as per clause 111, 112, 202, 305.4.3 of MORTH - Vth Revision etc.,complete. | 1,540 | One square Metre | 23.36 | ₹35,974.4 |
| 3 | Providing, laying, spreading and compacting graded stone aggregates for Wet Mix Macadam 250mm thick, including premixing the materials with water at OMC in mechnanical mix plant, conveyance of mixed materials by tipper to site, laying in uniform layers using pavers in Sub Base/ Base course on well prepared surface and compacting with vibratory roller to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev-5 | 1,155.01 | One Cubic Metre | 2,650.34 | ₹30,61,169.2 |
| 4 | Providing and laying Prime Coat over WBM/ WMM surface using 7 Kg of Emulsion Bitumen (SS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 502 of MORTH Rev-5M | 4,620 | One square Metre | 86.56 | ₹3,99,907.2 |
| 5 | Providing and laying Tack Coat over WBM/ WMM surface (treated with primer) using 2.50 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as complete as per Clause 502 of MORTH Rev-5 | 4,620 | One square Metre | 20.01 | ₹92,446.2 |
| 6 | Providing and laying Tack Coat over Existing BT surface using 2 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5 | 83,227.45 | One square Metre | 28.85 | ₹24,01,111.93 |
| 7 | Providing, laying 50mm consolidated thick Dense Bituminous Macadam using 0.24cum of 26.50-13.20mm, 0.25cum of 13.20-2.36mm and 0.23cum of 2.36mm & below and with 53.20Kgs of VG40 Grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in the required temperature in Central Hot Mix Plant 20-30 ton capacity, conveying the mix by tipper trucks to work site, spreading the mix to uniform thickness of 50mm using paver to the specified grades and cross sections and compacted by Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver at site etc.,including hire and fuel charges for 20-30ton CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory rollers and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 505 MORTH Rev-5 for Grade II | 1,916.11 | One Cubic Metre | 11,315.28 | ₹2,16,81,321.16 |
| 8 | Providing and laying Bituminous Concrete to 30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG40 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5 for Grade II | 3,513.9 | One Cubic Metre | 12,293.25 | ₹4,31,97,251.18 |
| 9 | Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour charges, materials, tools, equipments and all incidental charges, including compacting with power roller, watering, including all hire and fuel charges for all tools and plants, removal of other deleterious matter and obstructions, trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials etc., complete as per standard specification. For making up of low berms with conveyance | 3,825 | One Cubic Metre | 181.12 | ₹6,92,784 |
| 10Dismantling the Plain cement concrete in the existing Culverts and clearing away from the work site and carefully stacking the usefull materials for reuse on the road side as directed by the departmental officers including all labour and incidental charges etc., complete. | |||||
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.25 MB
PQMHA75to80.pdf
Tender Documents • 0.64 MB
BidMHA75to80.pdf
Additional Documents • 0.56 MB
BOQ_722528.xls
BOQ • 0.38 MB
Corrigendum_Date_26to49.pdf
PDF • 0.20 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .