| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L2₹29.1 L+₹1.86 (<0.01%)Accepted-AOC | ₹29.1 L+₹1.86 (<0.01%) Quoted ₹30.2 L | L2 | Accepted-AOC Awarded |
| 2 | L1₹30.2 LRejected-Finance | ₹30.2 L | L1 | Rejected-Finance Not Admitted |
| 3 | Rejected-Technical | - | - | Rejected-Technical Labour licence expired |
| 4 | Rejected-Technical | - | - | Rejected-Technical No documents of similar works done in Irrigation deptt |
| 5 | Rejected-Technical | - | - | Rejected-Technical No documents of similar works done in Irrigation deptt |
Tender Value
₹33.5 L
EMD Value
₹67,069
Closing Date
13 Feb 2020, 2:00 pmClosed
EE,Pahumara Rupahi Division(I),Sarupeta
O/o EE,Pahumara Rupahi Division(I),Sarupeta
Construction of Double barrel Box Culvert at Ch. 1950.00 M of Main canal of Rupahi I/S.
2020_ID_16252_1
PRID_T_7_2019_20_90 Dt 03_02_2020
Open Tender
Civil Works
Item Rate
60 days
Rupahi
Please refer Tender documents.
6 documents required · 6 mandatory
₹700
EE,Pahumara Rupahi Division(I),Sarupeta
₹67,069
Yes
23 Aug 2020
3 Feb 2020
13 Feb 2020
3 Feb 2020
13 Feb 2020
4 Feb 2020
Amount
CONSTRUCTION OF DOUBLE BARREL BOX CULVERT AT CH. 1950.00 M OF MAIN CANAL OF RUPAHI I/S.
Item No. 1/6.4 (B) (i): Earthwork in excavation in foundation of canal structures in all types of soils as per design and drawing including dressing the foundation, shoring, etc. removing the surplus spoils by head load to a safe distance from the working place and depositing the required spoils in uniform layers, dressing, watering, breaking clods to not more than 10mm cube with compensation, complete as directed at site. (Including bailing out stagnant rain water where necessary). B) In soils mixed with gravel and boulder up to 30cm size: (i) For lead up to 60M and lift of 3M
Item No. 2/6.6(i): Earthwork in excavation and removal of swelled up earth mixed with silt and slurry due to sand, bailing out water in foundation trenches up to required level including shuttering, shoring, dewatering by means of pumpset etc. removing the spoils to a safer distance etc., complete as directed. (i) With dewatering
Item No. 3/24.2 Collection of sand gravel (40% sand and 60% gravel of size 25mm to60mm) free from dust and dirt including stacking in measurable stacks at quary site and making payment of forest royalty etc. as directed complete.
Item No 4/2.1 Carriage of boulders, gravel, metal screening,stacking in measurable stacks at site, complete as directed. (A) For Normal Road upto 25.00 KM
Item No. 5/25.26: Labour charges for spreading hard river shingles/sand gravels to required thickness over subway, etc. including ramming, dressing the seat before laying the materials lead up to 30 M and lift 1.50 M, complete as directed.
Item No. 6/10.2 (A) (iii): CC work in proportion 1:2:4 in foundation/abutment/piers/wing walls etc. with hard broken stone aggregate of size 6mm to 20mm including curing, dewatering with necessary timber shuttering, scaffolding etc. where necessary complete as directed.(Shuttering, scaffolding cost will be paid separately).
Item No. 7/12.3: Supplying fitting fixing and laying reinforcement (TATA) in position in RCC work including cutting, bending, cranking with two piles 0.91 M (20 BWG) annealed wire, hooking, tying, complete as directed.
Item No. 8/9.2 (ii): Centering and shuttering including propping, nailing, bolting with earth oiling inside face etc. and removal of forms after completion of CC and RCC works etc. complete as directed (Measurement to be taken on the face area timbered) (Abutment/Return wall/Piers/ Pedestal etc.) With 38mm wood plank
Item No. 9/8.1: Providing scaffolding work with rows of bhaluka bamboo and jati bamboo horizontal with one row jati bamboo cross and placing second class planks of 0.025M thick in between the rows tying with coir strings lacing two no.’s vertical jati bamboo at both end including dismantling the scaffolding etc. complete as directed.
Item No. 10/12.1(A)(ii): RCC work in slab, abutment cap and above abutment, pier cap, pedestal, dirt wall etc. in proportion 1:1.5:3 with hard broken stone aggregate of size 6mm to 20mm with proper reinforcement as per design including necessary curing, dewatering etc. complete as directed with necessary timber shuttering, scaffolding, etc. necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately)
Item No. 11/10.3(A)(iii): CC work in proportion 1:3:6 in foundation/abutment/piers/wing walls etc. with hard river shingles of size 13mm to 38mm including curing, dewatering with necessary timber shuttering, scaffolding, etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately)
Item No. 12/6.14: Earth work in back filling of structure obtained from outside borrow pits filling in 15 cm layers,ramming,dressing,watering including payment compensation of land if any (with lead up to 30 m and lift upto 1.50 m).
Nagesh Kr. Baishya
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .