| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.7 LAccepted-AOC | ₹24.7 L | L1 | Accepted-AOC OKay |
| 2 | L2₹24.7 LRejected-Finance | ₹24.7 L | L2 | Rejected-Finance AER |
| Sl No | Description | Qty | Unit | Kothanya Construction L1 | SAI SURYAA CONSTRUCTION L2 |
|---|---|---|---|---|---|
| 1.00Providing Platform Arrangement at Bus Tyre Unit In Mottur Panchayat | |||||
| 1.01 | Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete | 409.2 | cu.m | 413.6 ₹1.7 L | 415 ₹1.7 L |
| 1.02 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | 136.4 | cu.m | 2,331.1 ₹3.2 L | 2,335 ₹3.2 L |
| 1.03 | Base course concrete with C.C.1:4:8 mix using 40mm I.S.S. size HBG metal from approved quarry to work site including cost and conveyance of all materials and labour charges for mixing for base course as per standared specification. | 136.4 | cu.m | 5,180 ₹7.1 L | 5,185 ₹7.1 L |
| 1.04 | Cement Concrete Pavement with C.C.1:2:4 HBG metal from approved quarry to work site including cost and conveyance of all materials and labour charges for mixing, laying compacting, etc., complete | 136.4 | cu.m | 6,556.75 ₹8.9 L | 6,556.75 ₹8.9 L |
| 1.05 | Provision bitumen pad for expansion joint between cc pavements 15 mm thick | 19.8 | sq.m | 234.25 ₹4,638.15 | 254 ₹5,029.20 |
| 2.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works. {GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount (in Rupees) | 3,76,693 ₹3.8 L | 3,77,085 ₹3.8 L |
Tender Value
₹25 L
EMD Value
₹25,000
Closing Date
10 Sept 2025, 3:00 pmClosed
Block Development Officer, Kalasapakkam
Block Development Office, Kalasapakkam
Platform Arrangement at Bus Tyre Unit In Mottur Panchayat in Kalasapakkam Block of Tiruvannamalai District under MLACDS
2025_RDTN_599048_1
Platform Arrangement at Bus Tyre Unit In Mottur TVMKLSPBP/2024-25/00058
Open Tender
Civil Works
Kalasapakkam
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹25,000
3 Mar 2026
1 Sept 2025
10 Sept 2025
1 Sept 2025
10 Sept 2025
1 Sept 2025
Amount
Providing Platform Arrangement at Bus Tyre Unit In Mottur Panchayat
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Base course concrete with C.C.1:4:8 mix using 40mm I.S.S. size HBG metal from approved quarry to work site including cost and conveyance of all materials and labour charges for mixing for base course as per standared specification.
Cement Concrete Pavement with C.C.1:2:4 HBG metal from approved quarry to work site including cost and conveyance of all materials and labour charges for mixing, laying compacting, etc., complete
Provision bitumen pad for expansion joint between cc pavements 15 mm thick
GST Amount for providing Service to Government Contract Works for the above Construction Works. {GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
SAI SURYAA CONSTRUCTION (BID ID -1453735)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid