Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹14.0 CrAccepted-AOC | ₹14.0 Cr | 1 | Accepted-AOC 1 |
| 2 | 2₹16.5 CrRejected-AOC HSVP PANCHKULA | PANCHKULA | HARYANA | 133301 | ₹16.5 Cr | 2 | Rejected-AOC 2 |
| 3 | 3₹17.0 CrRejected-AOC 81 ARYA NAGAR ASSANDH ROAD PANIPAT HARYANA 132103 | PANIPAT | HARYANA | 132103 | ₹17.0 Cr | 3 | Rejected-AOC 3 |
Tender Value
₹16.1 Cr
EMD Value
₹32.3 L
Closing Date
30 Jun 2023, 3:00 pmClosed
ARVIND Rohilla
EE PHE Division No. 1 Kaithal
Construction of 1 No. IPS at Near Girdhar Ahluwalia Chowk, Construction of 1 No. IPS at Near Anaj Mandi Pundri, construction of boundary wall , rising main for IPS, laying of sewerage system in various size 200 mm to 450 mm i/d and all other works
2023_HRY_289473_1
2023561624D7 5E71 447A 8CFA 1604C9A1DC4D594PUH
Open Tender
Civil Works
2 days
Fathepur
2 documents required · 2 mandatory
₹20,000
Yes
₹32.3 L
Yes
7 Feb 2024
9 Jun 2023
30 Jun 2023
9 Jun 2023
30 Jun 2023
9 Jun 2023
Amount
Supplying and installation of RCC Vent shafts complete in all respect as per satisfaction of the Engineer-in-Charge complete in all respect
Providing lowering in trenches to correct gradient and alignments jointing with tytone rubber joint and cutting of RCC S/S pipes having inside HDPE lining ISI marked as per IS-458-2003 into trenches for all depths and laying out the same to correct alignment gradients levels etc cutting of concrete beds and joints holes supporting the pipes and specials in corrected position in a suitable rigid manner while the same are being jointed and until the surrounding benchings, haunches and envelops are completed. The pipes shall rest on the beds at all joints through their lengths and to ensure this, testing the pipes for leakage and all defects to the entire satisfaction of the Engineer incharge including all cartage etc complete in all respect 450 mm i/d pipe with inside HDPE lining
Operation and Maintenance of Sewerage System for complete scope of work mentioned in the DNIT in the village (Disinfection material supplied by the PHED) as per schedule-IV for a period of 5 years after 12 months during defect liability period and 3 months trial run period. (Will be charged to the A/Mtc estimate). complete in all respects as per approved NIT. 1.Operation and Maintenance during defect liability period after 3 months trial run period (Operation only)
1st year Operation and maintenance after defect liability period
2nd year Operation and maintenance
3rd year Operation and maintenance
4th year Operation and maintenance
5th year Operation and maintenance
Bidder Name
Amount
ROHTASH KUMAR CONTRACTOR(GSTN-NA)
Rajesh Kadiyan Contractor(GSTN-NA)
Sh.Jasveer Singh Dahiya(GSTN-NA)
ROHTASH KUMAR CONTRACTOR
Rajesh Kadiyan Contractor
ROHTASH KUMAR CONTRACTOR
Rajesh Kadiyan Contractor
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid