Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹16.8 LAdmitted-Finance | -0.11% | ₹16.8 L | L1 | Admitted-Finance |
| 2 | L2₹17.0 L+₹16,984.96 (1.01%)Admitted-Finance | +0.90% | ₹17.0 L+₹16,984.96 (1.01%) | L2 | Admitted-Finance |
| 3 | L3₹17.0 L+₹18,666.64 (1.11%)Admitted-Finance | +1.00% | ₹17.0 L+₹18,666.64 (1.11%) | L3 | Admitted-Finance |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹19.8 L
EMD Value
₹99,219
Closing Date
27 Apr 2026, 12:00 pmClosed
Office EO NP Harra
Office EO NP Harra
Construction work of 06 shops on Khasra No. 1995 near the community toilet in Ward-14.
2026_DOLBU_1133478_1
006/NPH/2026-27 Date 04/04/2026
Open Tender
Civil Works
Fixed-rate
60 days
Office EO NP Harra
3 documents required · 3 mandatory
₹2,342
Office EO NP Harra
₹99,219
7 May 2026
6 Apr 2026
27 Apr 2026
6 Apr 2026
27 Apr 2026
6 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismentling of old and Brick work including supply of all material,labour and T&P etc.required for proper completion of work | - | Cum | - | - |
| 2 | Deduction of old and workable brick 40% of item no-1 | - | nos. | - | - |
| 3 | Deduction of brick ballast of 5cm gauge item no-1 | - | Cum | - | - |
| 4 | Earth work in excavation in ordinary soil upto 1.5 M & lead upto 30 M including back filling watering and ramming of excavated earth.including supply of all material,labour and T&P etc.required for proper completion of work | - | Cum | - | - |
| 5 | Concrete in 1:4:8 with cement,fine sand and stone ballast of 4cm guage including supply of all material,labour and T&P etc.required for proper completion of work. | - | Cum | - | - |
| 6 | Concrete in 1:6:12 with cement,fine sand and stone ballast of 4cm guage including supply of all material,labour and T&P etc.required for proper completion of work. | - | Cum | - | - |
| 7 | M-150 brick work in 1:4 with cement,coarse sand mortar in foundation including supply of all material,labour and T&P etc.required for proper completion of work | - | Cum | - | - |
| 8 | M-150 brick work in 1:4 with cement,coarse sand mortar in super structure including supply of all material,labour and T&P etc.required for proper completion of work | - | Cum | - | - |
| 9 | R.C.C work in 1:1.5:3 with cement,coarse sand and stone gritt of 2cm guage in raft foundation i/c supply of all material,labour and T&P etc.including all complete of work | - | Cum | - | - |
| 10 | R.C.C work in 1:1.5:3 with cement,coarse sand and stone gritt of 2cm guage in Column i/c supply of all material,labour and T&P etc.including all complete of work | - | Cum | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.25 MB
Tendernotice_2.pdf
PDF • 0.49 MB
BOQ_2115744.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .