| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L2₹16.1 L+₹2.3 L (16.9%)Accepted-AOC | L2 | Accepted-AOC Accepted | |
| 2 | L1₹13.8 LRejected-AOC AGARAM SITHAMUR | MADURAI | TAMIL NADU | 625001 | L1 | Rejected-AOC Rejected | |
| 3 | L3₹19.1 L+₹5.3 L (38.5%)Rejected-AOC | L3 | Rejected-AOC Rejected | |
| 4 | L4₹19.7 L+₹5.9 L (43.1%)Rejected-AOC | L4 | Rejected-AOC Rejected | |
| 5 | L5₹20.1 L+₹6.3 L (46.1%)Rejected-AOC | L5 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | JAISHANTHI AND CO L2 | Kamalam Construction L3 | D Murugan L4 | KALAIMANI L1 | MKM Constructions L5 |
|---|---|---|---|---|---|---|---|---|
| 1.00Construction of Retainting wall @ High level Bridge across Vadhanur Odai at Sengamedu to Ayyuragaram road Right side & Left side in Ayyuragaram Panchayat | ||||||||
| 1.01 | EARTHWORK EXCAVATION for foundation in all soils and sub soils and to full depth as may be directed except in rock requiring blasting but inclusive of shoring, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth in layers of not more than 15cm thick, well rammed and consolidated and depositing the surplus earth within the compound in places shown by the departmental officers with initial lead and lift etc. complete. | 177.35 | m3 | 200.47 ₹35,553.85 | 237.4 ₹42,102.89 | 245.32 ₹43,507.5 | 171.46 ₹30,408.43 | 150 ₹26,602.5 Lowest |
| 1.02 | Filling in the basement filling M.Sand including cost and conveyance to the site and all labour charges for filling as per standard specifications etc | 15.61 | m3 | 1,565.55 ₹24,438.19 | 1,853.94 ₹28,940 | 1,915.73 ₹29,904.55 | 1,338.95 ₹20,901.01 Lowest | 2,000 ₹31,220 |
| 1.03 | Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed | 15.61 | m3 | 4,403.27 ₹68,735.09 | 5,214.4 ₹81,396.78 | 5,388.22 ₹84,110.11 | 3,765.96 ₹58,786.64 Lowest | 5,100 ₹79,611 |
| 1.04Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle | ||||||||
| 1.05 | Below GL | 87.77 | m3 | 750.42 ₹65,864.71 | 888.66 ₹77,997.69 | 918.28 ₹80,597.44 | 641.81 ₹56,331.66 Lowest | 1,000 ₹87,770 |
| 1.06 | Anvove Gl | 269.81 | Nos | 832.2 ₹2,24,535.88 | 985.5 ₹2,65,897.76 | 1,018.35 ₹2,74,761.01 | 711.75 ₹1,92,037.27 Lowest | 1,120 ₹3,02,187.2 |
| 1.07 | Cement concrete 1 : 3 : 6 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed | 203.12 | Nos | 4,611.76 ₹9,36,739.88 | 5,461.29 ₹11,09,297.22 | 5,643.33 ₹11,46,273.19 | 3,944.27 ₹8,01,160.12 Lowest | 5,740 ₹11,65,908.8 |
| 1.08 | Providing and fixing seepage pipes of 110mm dia PVC pipes if required lengths fokr abutments and wings including cost and convenyance of all materials to worksite, cost and labour fokr 900mm dia semi sphercial back fill arrangements with 110mm size broken granite chips at the periphery and labour charges for fixing etc | 48 | m3 | 145.92 ₹7,004.16 | 172.8 ₹8,294.4 | 178.56 ₹8,570.88 | 124.8 ₹5,990.4 Lowest | 188 ₹9,024 |
| 1.09 | Name Board | 1 | Nos | 950 ₹950 | 1,125 ₹1,125 | 1,162.5 ₹1,162.5 | 812.5 ₹812.5 Lowest | 1,500 ₹1,500 |
Tender Value
Refer Docs
EMD Value
₹21,360
Closing Date
24 Sept 2026, 3:00 pmClosed
BDO
Vikkiravandi
TNVPM/Vikkiravandi/DP
2026_RDTN_703524_1
Vikkiravandi
Open Tender
Civil Works
Works
180 days
Vikkiravandi
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹21,360
Yes
1 Oct 2026
10 Sept 2026
25 Sept 2026
10 Sept 2026
24 Sept 2026
10 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Construction of Retainting wall @ High level Bridge across Vadhanur Odai at Sengamedu to Ayyuragaram road Right side & Left side in Ayyuragaram Panchayat | |||||
| 1.01 | EARTHWORK EXCAVATION for foundation in all soils and sub soils and to full depth as may be directed except in rock requiring blasting but inclusive of shoring, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth in layers of not more than 15cm thick, well rammed and consolidated and depositing the surplus earth within the compound in places shown by the departmental officers with initial lead and lift etc. complete. | 177.35 | m3 | 263.78 | ₹46,781.38 |
| 1.02 | Filling in the basement filling M.Sand including cost and conveyance to the site and all labour charges for filling as per standard specifications etc | 15.61 | m3 | 2,059.93 | ₹32,155.51 |
| 1.03 | Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed | 15.61 | m3 | 5,793.78 | ₹90,440.91 |
| 1.04 | Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle | - | - | - | - |
| 1.05 | Below GL | 87.77 | m3 | 987.4 | ₹86,664.1 |
| 1.06 | Anvove Gl | 269.81 | Nos | 1,095 | ₹2,95,441.95 |
| 1.07 | Cement concrete 1 : 3 : 6 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed | 203.12 | Nos | 6,068.1 | ₹12,32,552.47 |
| 1.08 | Providing and fixing seepage pipes of 110mm dia PVC pipes if required lengths fokr abutments and wings including cost and convenyance of all materials to worksite, cost and labour fokr 900mm dia semi sphercial back fill arrangements with 110mm size broken granite chips at the periphery and labour charges for fixing etc | 48 | m3 | 192 | ₹9,216 |
| 1.09 | Name Board | 1 | Nos | 1,250 | ₹1,250 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.72 MB
Tenderdocument.pdf
Tender Documents • 1.01 MB
BOQ_845621.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .