Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.5 LAdmitted-Finance | -50.45% | ₹2.5 L | L1 | Admitted-Finance |
| 2 | L2₹2.7 L+₹20,681.52 (8.31%)Admitted-Finance | -46.33% | ₹2.7 L+₹20,681.52 (8.31%) | L2 | Admitted-Finance |
| 3 | L3₹3.2 L+₹74,543.83 (30.0%)Admitted-Finance | -35.60% | ₹3.2 L+₹74,543.83 (30.0%) | L3 | Admitted-Finance |
| 4 | L4₹3.6 L+₹1.1 L (44.0%)Admitted-Finance | -28.65% | ₹3.6 L+₹1.1 L (44.0%) | L4 | Admitted-Finance |
| 5 | L5₹3.6 L+₹1.1 L (45.5%)Admitted-Finance | -27.88% | ₹3.6 L+₹1.1 L (45.5%) | L5 | Admitted-Finance |
Tender Value
₹5.0 L
EMD Value
₹10,040
Closing Date
7 Sept 2026, 4:00 pmClosed
Executive Engineer PWD R and B Division Kathua
Executive Engineer PWD R and B Division Kathua
REfer to BOQ
2026_PWDJK_322792_1
E-NIT No 68/2026/27/5749-53/G Dated29.08.2026
Open Tender
Civil Works
Percentage
30 days
Kathua
Please refer Tender documents.
3 documents required · 3 mandatory
₹600
Executive Engineer PWD R and B Division Kathua
₹10,040
Executive Engineer PWD R and B Division Kathua
8 Sept 2026
31 Aug 2026
8 Sept 2026
31 Aug 2026
7 Sept 2026
31 Aug 2026
2 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: 2.9.1 All kinds of soil | 25 | Cum | 256.85 | ₹6,421.25 |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: (1:5:10) | 2.5 | Cum | 4,826.5 | ₹12,066.25 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: (1:3:6) | 69.63 | Cum | 5,733.6 | ₹3,99,201.9 |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form work for: a)Foundations, footings, bases for columns | 175 | Sqm | 286.35 | ₹50,111.25 |
| 5 | Supplying and laying including digging, carrying by lorry, filling river bed material including watering and consolidation in layers to specified lines, camber, grades and cross sections. Finished work including material, labour and all leads and lifts , carriage of material by MT/HL. | 22.5 | Cum | 300 | ₹6,750 |
| 6 | Stone aggregate above 40 mm by 10 km avg MT | 2.23 | Cum | 303.34 | ₹676.45 |
| 7 | crusher bajree below 40mm avg.lead 10km | 61.97 | Cum | 279.04 | ₹17,292.11 |
| 8 | sand to an avg lead 10km | 33.9 | Cum | 279.04 | ₹9,459.46 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.83 MB
BOQ_1084170.xls
BOQ • 0.53 MB
corri68.pdf
PDF • 0.94 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .