| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.1 CrAdmitted-Finance ODISHA | -45.00% | ₹1.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.2 CrAdmitted-Finance | -42.52% | ₹1.2 Cr | L2 | Admitted-Finance |
| 3 | L3₹1.2 CrAdmitted-Finance AT BELTIKIRI SADAR DHENKANAL | -42.15% | ₹1.2 Cr | L3 | Admitted-Finance |
| 4 | L4₹1.2 CrAdmitted-Finance AT BELTIKIRI SADAR DHENKANAL | -41.99% | ₹1.2 Cr | L4 | Admitted-Finance |
| 5 | L5₹1.3 CrAdmitted-Finance AT BELTIKIRI SADAR DHENKANAL | -38.01% | ₹1.3 Cr | L5 | Admitted-Finance |
Tender Value
₹2.0 Cr
EMD Value
₹2.0 L
Closing Date
21 Jan 2026, 5:30 pmClosed
Additional Chief Engineer, RHWC, Samal
Office of the Additional Chief Engineer, Rengali Head Works Circle, Samal, Angul, Pin-759037
Improvement to service road of Parjang Branch Canal from RD 23.00Km to RD 28.947Km.
2026_CEBBS_124247_1
ACE-RHWC 01/2025-26
Open Tender
Civil Works - Roads
120 days
Parjang
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,000
₹2.0 L
Yes
2 Feb 2026
6 Jan 2026
22 Jan 2026
6 Jan 2026
21 Jan 2026
6 Jan 2026
6 Jan 2026 - 13 Jan 2026
Clearing grass and removal of rubbish upto a distance 50 mtr outside the periphery of the area & grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm on pre measurement and removal of stumps of trees cut earlier disposal of unserviceable materials to be used or auctioned up to a lead of 1000 mtr including removal and disposal of top organic soil not exceeding 150 mm thickness with all leads, lifts and delifts with cost of all labour, hiring and running charges of all machineries, cess etc. complete as per direction of Engineer-in-Charge.
Quarrying, collecting, supplying and stacking of good quality of moorum and sand in regular box heap size of 1.50m X 1.50m X 0.50m to be measured as one cum and admixing moorum and sand in (60 : 40) proportion and laying in sub-base of road in layers not exceeding 100 mm thick with all leads, lifts and delifts including cost, conveyance, royalty, cess including hire charges of T&P materials required for the work, watering and consolidation with smooth wheeled roller, hire and running charges of machineries etc. Complete as per specification and direction of the Engineer-in-Charge.
Providing and laying, spreading and compacting stone aggregates to 75 mm thickness with IRC grade - II material (63 mm to 45 mm) to WBM specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel roller 8-10 tones in stages to proper grade and camber, applying and brooming using moorum as binding materials to fill up the interstices of coarse aggregates, watering and compacting to the required density as per clause 404 of MoSRT & H specifications for road & Bridge works (4th Revision) with all leads, lifts and delifts including cost, conveyance, royalty, cess including cost of labours, hire and running charges of machineries & quality control test etc. Complete as per specification and direction of the Engineer-in-Charge.
Providing and laying, spreading and compacting stone aggregates to 75 mm thickness with IRC grade - III material ( 53 mm to 22.4 mm) as per table-400-I to WBM specification including spreading in uniform thickness , hand packing , rolling with 3 wheeled steel roller 8-10 tones in stages to proper grade and camber, applying and brooming using stone screened dust as binding materials to fill up the interstices of coarse aggregates, watering and compacting to the required density as per clause 401of MoSRT & H specifications for road & Bridge works (4th Revision) with all leads, lifts and delifts including cost, conveyance, royalty, cess etc. including labours and hire and running charges of machineries and quality control test complete as per specification and direction of the Engineer-in-Charge.
Collecting & supplying good quality moorum from approved quarry and stacking at work site in regular box heap size (1.50mx1.50mx0.50m) to be measured as 1.0cum and spreading the same on the top of the metalled surface not exceeding 5 cm thick including watering & rolling with smooth wheeled roller with all leads, lifts and delifts including cost, conveyance, royalty, cess including hire and running charges of machineries & quality control test etc. Complete as per specification and direction of the Engineer-in-Charge.
Please Enable Macros to View BoQ information
stage.html
html • 0.09 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.27 MB
Techbid_ACERHWCRLBCD_01.pdf
Tender Documents • 1.70 MB
BOQ_574647.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid