RequiredExperience with Government
RequiredAnnual Turnover Bid to RA enabled No Automotive Vehicles Pneumatic Tyres ( 10 pieces ) Technical Specifications * As per GeM Category Specification Specification Specification Name Values Bid Requirement (Allowed Values) Ungrouped Category Of Pneumatic tyres Normal Road Tyre Normal Road Tyre
RequiredSpecial use Tyre: mixed used
RequiredRestricted speed: snow tyre 1/12 Tyres Without Tube Without Tube Conformity to Indian Standrad for Pneumatic Tyres IS:15636 latest for Automotive vehicles: Pneumatic tyre for commercial Vehicles- Diagonal and radial ply IS:15636 latest for Automotive vehicles: Pneumatic tyre for commercial Vehicles- Diagonal and radial ply Conformity to Indian Standrad for Pneumatic Tubes NA for Tubeless TYRES NA for Tubeless TYRES ISI MARKED (for Tyres) Yes Yes CM/L No and validity date)(for Tyres - * ISI MARKED (for Tubes) NA for Tubeless and without tube NA for Tubeless and without tube CM/L No and validity date(for tubes) - * Type of tube NA for Tubeless and without tube * Manufactures name and Trade Name - * Tyre-size Designations 1100x20 1100x20size
Required1100-20
Required1100x20 Tube-size Designations - * Structure of Tyre Bias-belted Bias-belted Ply Rating - * Speed Category - * Load indicas - * Side Well (mm) 325 * Inner area of Tyers (mm) 22.5 * Section Width (min)(mm) 312 * Overall Width (max)(mm) 12 * Section Height (mm) 20 * Nominal Aspect Ratio(mm) 20 * Outer diameter (min)(mm) 1135 1180.0
Required1135.0 Nominal Rim Diameter(mm) 8.5 8.5
Required8.6
Required8.7 Maximum load Rating(%) 3725 3725
Required3789 2/12 Conformity to AIS-044 Yes * Availability of Type Test Report covering complete test parameters as per relevant BIS spcification latest for Tyre type
Requiredfrom any ILAC/NABL accredited/Central Gov. LAB. YES * Test cetificate No. - * Test Report Date - * Name and address of the Lab where test Conducted - * Others Certificate ie ROHS
RequiredWHO
RequiredGMP etc - * Warranty Time 1 1.0 * Specifications highlighted in bold are the Golden Parameters. * Bidders may note that In respect of non-golden Parameters
Requiredthe specifications 'Values' chosen by Buyer will generally be preferred over 'Bid requirement ( allowed Values) by the Buyer.