Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 LAccepted-AOC 30 OPP ALOK PRESS GHATI BADBHUNJA CHAMELI ROAD BHOPAL BHOPAL MADHYA PRADESH 462001 | BHOPAL | MADHYA PRADESH | 462001 | L1 | Accepted-AOC L1 |
Tender Value
Refer Docs
EMD Value
₹1,000
Closing Date
15 Jul 2024, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
CHIEF ENGINEER/MTPS-I
CHIEF ENGINEER MTPS-I METTUR DAM
MTPSI ES Circle EMI Sub Division IV Complete overhauling of 6 Nos various capacities of LT critical motors and bearing replacement work in barring gear motor during the Annual overhaul of Unit IV 2024
2024_EB_458432_1
CE-MTPS-I-SE-ES-EM-I-OT 27-2024-25
Open Tender
Electrical Works
Works
15 days
MTPS-I/METTURDAM
AS PER TENDER SPECIFICATION
4 documents required · 4 mandatory
₹0
₹1,000
Yes
10 Mar 2025
29 Jun 2024
16 Jul 2024
29 Jun 2024
15 Jul 2024
29 Jun 2024
29 Jun 2024 - 15 Jul 2024
Amount
Charges for releasing the motor 109 KW – Instrument Air Compressor 4C, Turbine Lub oil cooler booster pump 4A & 4B, 37KW-Hydrogen Cooler Booster Pump 4B from its bed, lifting, lowering and transporting the motor to a convenient location, removing of coupling pulley, re fixing of coupling pulley after over hauling, transporting the motor to its location, lifting, lowering the motor and placing in motor bed and erection of motor and power cable disconnecting and reconnecting and including coupling, alignment and coupling the motor with compressor (30.1KW to 160KW)
Charges for complete overhauling of 109KW- Instrument Air Compressor – 4C motor including dismantling, cleaning of the stator coils, checking the tightness of the stator wedges and applying one coat of insulating varnish, replacement of both DE and NDE bearings and assembling. (DE & NDE Bearing - under the scope of TANGEDCO (100.1KW to 160 KW)
Charges for metal filling, machining and repairing of worn out shafts / bearing seating surfaces of DE and NDE, checking of bearing housings, providing sleeves in the end cover of DE and NDE for 109 KW- Instrument Air Compressor – 4C (if necessary)
Charges for complete overhauling Turbine Lub oil cooler booster pump 4A & 4B, 37KW-Hydrogen Cooler Booster Pump 4B including dismantling of motor, cleaning of the stator coils, checking the tightness of the stator wedges and applying one coat of insulating varnish, replacement of both DE and NDE bearings and assembling. (30.1KW to 50 KW) (DE&NDE Bearing - under the scope of TANGEDCO)
Charges for metal filling, machining and repairing of worn out shafts / bearing seating surfaces of one side, checking of bearing housings, providing sleeves in the end cover of one side for Turbine Lub oil cooler booster pump 4A & 4B, 37KW-Hydrogen Cooler Booster Pump 4B,30KW Barring gear motor-4 (for 30 KW to 39KW) (If necessary)
Charges for disconnecting the power cable, releasing the motor 1.5 KW OVEF 4B & OVEF 4C from its bed, lifting, lowering and transporting the motor to a convenient location, removing of coupling pulley, re-fixing of coupling pulley after over hauling, transporting the motor to its location, lifting, lowering the motor and placing in motor bed and erection of motor, reconnecting the power cable and including coupling, alignment and coupling the motor with the compressor or pump (from 0.6 KW to 4.8 KW)
Charges for Complete overhauling of motor, including dismantling, cleaning of the stator coils, checking the tightness of the stator wedges and applying one coat of insulating varnish, replacement of both DE and NDE bearings and assembling for 1.5 KW OVEF 4B, OVEF 4C (DE & NDE Bearing - under the scope of TANGEDCO) (1.41 KW to 2.8KW)
Charges for metal filling, machining and repairing of wornout shafts / bearing seating surfaces of one side, checking of bearing housings, providing sleeves in the end cover of one side for OVEF-4B & 4C (from 1.2KW to 9.3KW) ( if necessary)
Charges for disconnecting the power cable, releasing the motor 30KW Barring gear motor-4 from its bed, lifting, lowering and transporting the motor to a convenient location removing of coupling pulley, re-fixing of coupling pulley and re-fixing of healthy spare motor , lifting, lowering the motor and placing in motor bed and erection of motor, reconnecting the power cable and including coupling, alignment and coupling the motor.(For the rating from 15.1KW to 30 KW)
Charges for dismantling replacement of both DE and NDE bearings and Assembling of 30 KW Barring gear motor. Sl.No.14414804 Make : NGEF (DE & NDE Bearing - under the scope of TANGEDCO)
Charges for Painting with 2 coats of Motor
Material charges for End Sleeves for DE/NDE covers for 109 KW motor. (if necessary)
Material charges for End Sleeves for DE/NDE covers for 37 KW motor.(TLOCBP- 2 Nos, HCBP-1 No (if necessary)
Material charges for End Sleeves for DE/NDE covers 1.5KW motor (OVEF – 2 Nos) (if necessary)
Material charges for End Sleeves for DE/NDE covers for 30KW motor. (if necessary)
Smoke Grey enamel paint i)109KW-IAC-1 No. (ii) 37 KW – HCBP-1 No. TLOCBP 2 Nos (iii) OVEF-2 Nos
Dr. Beck’s varnish (i)109KW-IAC-1 No. (ii) 37 KW – HCBP-1 No. TLOCBP 2 Nos (iii) OVEF-2 Nos (iv) 30KW Bearing gear motor – 1 No, Total 7 Nos
Thinner
Cost of consumables (Lumsum)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .