| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.3 CrAccepted-AOC | ₹7.3 Cr | L1 | Accepted-AOC For being L1 |
| 2 | L2₹7.3 Cr+₹2.2 L (0.30%)Rejected-Finance BARALOTA BY PASS ROAD DALTONGANJ PALAMU JHARKHAND | PALAMU | JHARKHAND | 822101 | ₹7.3 Cr+₹2.2 L (0.30%) | L2 | Rejected-Finance Rejected for
not being L1 |
| 3 | L3₹7.5 Cr+₹21.4 L (2.94%)Rejected-Finance | ₹7.5 Cr+₹21.4 L (2.94%) | L3 | Rejected-Finance Rejected for
not being L1 |
| 4 | L4₹7.6 Cr+₹30.7 L (4.20%)Rejected-Finance | ₹7.6 Cr+₹30.7 L (4.20%) | L4 | Rejected-Finance Rejected for
not being L1 |
| 5 | L5₹7.6 Cr+₹31.3 L (4.29%)Rejected-Finance | ₹7.6 Cr+₹31.3 L (4.29%) | L5 | Rejected-Finance Rejected for
not being L1 |
Tender Value
₹9.3 Cr
EMD Value
₹11.6 L
Closing Date
13 May 2024, 5:00 pmClosed
GM(HoD)/Civil
Darbhanga House, Ranchi.
Construction of PQC Road from Zero Point to Coal Stock No.53 under Amrapali Project of Amrapali Chandragupta Area, CCL.
2024_CCL_306973_1
CCL/GM(C)/Tender/2024-25/52(H)
Open Tender
Civil Works - Roads
Item Rate
180 days
Amrapali Chandragupta Area
refer NIT
5 documents required · 5 mandatory
₹11.6 L
12 Jul 2024
24 Apr 2024
14 May 2024
24 Apr 2024
13 May 2024
25 Apr 2024
24 Apr 2024 - 6 May 2024
Amount
Part A (PQC Road)
Removal of unserviceable soil including excavation, loading and disposal upto 1000 metres lead but excluding replacement by suitable soil which shall be paid separately as per clause 305.
Embankment Construction with approved materials obtained from borrow pits (Construction of embankment with approved materials obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2.
Granular Sub-base with Coarse Graded Material (Table:- 400-2)By Mix in Place Method (Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401)for grading-I
Granular Sub-base with Coarse Graded Material (Table:- 400-2)By Mix in Place Method (Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401)for grading-III material.
Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site for all leads & lifts, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing etc. complete as per dorection of engineer-in-charge.
Cement Concrete Pavement (Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with 43 grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing )
Construction of Subgrade and Earthen Shoulders (Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2). Rolling with vibratory roller
Part B (RCC Guard Wall)
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work.), Ordinary soil, Mechanical Means (Depth upto 3 m).
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications.RCC Grade M25 with Batching Plant, Transit Mixture and concrete pump.
Supplying, fitting and placing un-coated HYSD bar reinforcement in foundation complete as per drawing and technical specifications
Sand filling in Foundation Trenches as per drawings & Technical Specification.
Part C ( RCC Drain)
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work.), Ordinary soil, Mechanical Means (Depth upto 3 m).
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications.RCC Grade M25 with Batching Plant, Transit Mixture and concrete pump.
Supplying, fitting and placing un-coated HYSD bar reinforcement in foundation complete as per drawing and technical specifications
Total impact of GST for the purpose of CTC
VIKASH KUMAR TIWARI AND ASHOK KUMAR JV
SHREE RAM SSS JV
M/S MC, SA AND AA (JV)
M/S RKS AND SKS (JV)
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .