Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.9 CrAccepted-Finance 227 B SANTEJ VADSAR ROAD SANTEJ TA KALOL GANDHI NAGAR GUJARAT 382721 | GANDHINAGAR | GUJARAT | 382721 | ₹5.9 Cr | L1 | Accepted-Finance L1 Bidder |
| 2 | L2₹6.1 Cr+₹26.1 L (4.44%)Accepted-Finance | ₹6.1 Cr+₹26.1 L (4.44%) | L2 | Accepted-Finance L2 Bidder |
| 3 | Rejected-Technical | - | - | Rejected-Technical Not Pre-Qualified |
| Sl No | Description | Qty | Unit | Hitech Elastomers Ltd. L1 | RKEC PROJECTS LIMITED L2 |
|---|---|---|---|---|---|
| 1.00 | Supply, Install, Testing & Commissioning of 06 No. Triple Quick Release Mooring Hook (QRMH) 80 Tons Capacity minimum for each unit with integral capstan and electric remote-control system along with anchor bolts, washers, nuts, base plates and mounting template for proper & firm mounting. All QRMHs are having the provision for integration to connect with the SCADA of existing fixed firefighting system available at Oil Jetty for operation. The QRMHs shall be complying relevant OICMF norms and any other relevant standards | 6 | Nos | 52,00,000 ₹3,12,00,000 Lowest | 55,45,000 ₹3,32,70,000 |
| 2.01 | 1st Year Charges for Operation and Comprehensive maintenance of the 06 No. Triple Quick Release Mooring Hook (QRMH) as per Scope of Work of 06 No. Triple Quick Release Mooring Hook (QRMH) Considering warranty period. | 12 | Months | 3,75,000 ₹45,00,000 Lowest | 4,24,000 ₹50,88,000 |
| 2.02 | 2nd Year Charges for Operation and Comprehensive maintenance of the 06 No. Triple Quick Release Mooring Hook (QRMH) as per Scope of Work of 06 No. Triple Quick Release Mooring Hook (QRMH) Considering warranty period. | 12 | Months | 4,12,500 ₹49,50,000 Lowest | 4,40,000 ₹52,80,000 |
| 2.03 | 3rd Year Charges for Operation and Comprehensive maintenance of the 06 No. Triple Quick Release Mooring Hook (QRMH) as per Scope of Work of 06 No. Triple Quick Release Mooring Hook (QRMH) | 12 | Months | 4,53,750 ₹54,45,000 Lowest | 4,70,000 ₹56,40,000 |
| 2.04 | 4th Year Charges for Operation and Comprehensive maintenance of the 06 No. Triple Quick Release Mooring Hook (QRMH) as per Scope of Work of 06 No. Triple Quick Release Mooring Hook (QRMH) | 12 | Months | 4,99,125 ₹59,89,500 | 4,90,000 ₹58,80,000 Lowest |
| 2.05 | 5th Year Charges for Operation and Comprehensive maintenance of the 06 No. Triple Quick Release Mooring Hook (QRMH) as per Scope of Work of 06 No. Triple Quick Release Mooring Hook (QRMH) | 12 | Months | 5,49,037 ₹65,88,444 | 5,10,000 ₹61,20,000 Lowest |
Tender Value
₹5.4 Cr
EMD Value
₹10.7 L
Closing Date
28 Jul 2025, 3:00 pmClosed
CME/ VOCPA
Chief Mechanical Engineer, VOC Port Authority.
Supply, Installation, Testing and Commissioning of 6 Units Triple Quick Release Mooring Hooks (QRMH) (80T) including Comprehensive Operation and Maintenance of five years period at Oil Jetty of VOCPA
2025_VOCPT_240842_1
MEE/FFS/QRMH/2025
Open Tender
Marine Works
Works
1825 days
Tuticorin
Please refer Tender documents.
13 documents required · 13 mandatory
₹0
₹10.7 L
Yes
CME Chamber, VOC Port Authority
9 Oct 2025
10 Jul 2025
29 Jul 2025
10 Jul 2025
28 Jul 2025
10 Jul 2025
10 Jul 2025 - 17 Jul 2025
18 Jul 2025
Amount
Supply, Install, Testing & Commissioning of 06 No. Triple Quick Release Mooring Hook (QRMH) 80 Tons Capacity minimum for each unit with integral capstan and electric remote-control system along with anchor bolts, washers, nuts, base plates and mounting template for proper & firm mounting. All QRMHs are having the provision for integration to connect with the SCADA of existing fixed firefighting system available at Oil Jetty for operation. The QRMHs shall be complying relevant OICMF norms and any other relevant standards
1st Year Charges for Operation and Comprehensive maintenance of the 06 No. Triple Quick Release Mooring Hook (QRMH) as per Scope of Work of 06 No. Triple Quick Release Mooring Hook (QRMH) Considering warranty period.
2nd Year Charges for Operation and Comprehensive maintenance of the 06 No. Triple Quick Release Mooring Hook (QRMH) as per Scope of Work of 06 No. Triple Quick Release Mooring Hook (QRMH) Considering warranty period.
3rd Year Charges for Operation and Comprehensive maintenance of the 06 No. Triple Quick Release Mooring Hook (QRMH) as per Scope of Work of 06 No. Triple Quick Release Mooring Hook (QRMH)
4th Year Charges for Operation and Comprehensive maintenance of the 06 No. Triple Quick Release Mooring Hook (QRMH) as per Scope of Work of 06 No. Triple Quick Release Mooring Hook (QRMH)
5th Year Charges for Operation and Comprehensive maintenance of the 06 No. Triple Quick Release Mooring Hook (QRMH) as per Scope of Work of 06 No. Triple Quick Release Mooring Hook (QRMH)
RKEC PROJECTS LIMITED (BID ID -878022)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ_274367.xls
BOQ • 0.26 MB
175313924.pdf
Tender Documents • 1.77 MB
175313928.html
Tender Documents • 0.06 MB
TenderDocument.pdf
Tender Documents • 1.21 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .