Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹29.2 LAdmitted-Finance | ₹29.2 L | L1 | Admitted-Finance |
| 2 | L2₹29.7 L+₹44,254.50 (1.51%)Admitted-Finance | ₹29.7 L+₹44,254.50 (1.51%) | L2 | Admitted-Finance |
| 3 | L3₹30.0 L+₹77,433.28 (2.65%)Admitted-Finance | ₹30.0 L+₹77,433.28 (2.65%) | L3 | Admitted-Finance |
| 4 | L4₹30.1 L+₹83,380.24 (2.85%)Admitted-Finance | ₹30.1 L+₹83,380.24 (2.85%) | L4 | Admitted-Finance |
| 5 | L5₹31.2 L+₹2.0 L (6.70%)Admitted-Finance | ₹31.2 L+₹2.0 L (6.70%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Lalramsanga L2 | David Zonunmawia L3 | JN Construction L1 | C.ZONUNSANGA L4 | Sharp Engineering Services L6 | Malsawmdawngzuala L6 | P LALDAWNGLIANA L5 | V Lalropeka L8 | F Lalnghakliana L9 | DAVID NEIHTLUANGA L7 | Lalmuankima L10 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earthwork in excavation in foundation trenches or drains etc. (not exceeding 1.5m in width or 10sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5m including getting out excavated soil and disposal of surplus excavated soil as directed within a lead of 50 metres. Hard Soil ( pick work ) | 301 | cum | 629 ₹1,89,329 | 629.9 ₹1,89,599.9 | 500 ₹1,50,500 | 630 ₹1,89,630 | 671.87 ₹2,02,232.87 | 671.87 ₹2,02,232.87 | 674.94 ₹2,03,156.94 | 484.23 ₹1,45,753.23 | 705.8 ₹2,12,445.8 | 679.44 ₹2,04,511.44 | 220 ₹66,220 Lowest |
| 2.00 | Providing and laying in position cement concrete of specified grade excluding cost of centering and shuttering - All work upto plinth level: 1:1.5:3 (1 cement :1.5 course sand :3 stone aggregate 20mm nominal size) | 176.09 | cum | 9,108 ₹16,03,827.72 | 9,109.2 ₹16,04,039.03 | 500 ₹88,045 Lowest | 9,120.1 ₹16,05,958.41 | 9,715.17 ₹17,10,744.29 | 9,715.17 ₹17,10,744.29 | 9,819.97 ₹17,29,198.52 | 10,586.61 ₹18,64,196.15 | 10,538.56 ₹18,55,735.03 | 9,824.47 ₹17,29,990.92 | 13,500 ₹23,77,215 |
| 3.00 | Steel reinforcement for RCC work including straightening, cutting, bending, placing in position and binding all complete. Thermo-Mechanically Treated bars of grade Fe-500 or more | 7,043.6 | kg | 107.3 ₹7,55,778.28 | 102 ₹7,18,447.2 | 285 ₹20,07,426 | 110.5 ₹7,78,317.8 | 108.37 ₹7,63,314.93 | 108.37 ₹7,63,314.93 | 105.09 ₹7,40,211.92 | 117.17 ₹8,25,298.61 | 117.18 ₹8,25,369.05 | 109.59 ₹7,71,908.12 | 82 ₹5,77,575.2 Lowest |
| 4.00 | 15mm cement plaster 1 : 4 (1 cement : 4 fine sand). | 1,354.5 | sqm | 309 ₹4,18,540.5 Lowest | 360.7 ₹4,88,568.15 | 500 ₹6,77,250 | 319.45 ₹4,32,695.03 | 330.33 ₹4,47,431.99 | 330.33 ₹4,47,431.99 | 329.55 ₹4,46,375.48 | 357.15 ₹4,83,759.68 | 357.17 ₹4,83,786.77 | 334.05 ₹4,52,470.73 | 520 ₹7,04,340 |
Tender Value
₹39.0 L
EMD Value
₹78,094
Closing Date
15 Nov 2025, 9:00 amClosed
Prof. Lalnundanga
Registrar, MZU
Side Drain
2025_MZU_883910_1
05/MZU/ENGG Cell OF 2025-26
Open Tender
Civil Works - Roads
Item Rate
180 days
MZU Campus
2 documents required · 2 mandatory
₹0
₹78,094
17 Nov 2025
3 Nov 2025
17 Nov 2025
3 Nov 2025
15 Nov 2025
3 Nov 2025
3 Nov 2025 - 15 Nov 2025
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.10 MB
BOQ_929050.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .