| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹88.4 LAccepted-AOC VILLAGE SHRI FATHEPUR | ₹88.4 L | 1 | Accepted-AOC Being Lowest |
| 2 | 2₹89.1 L+₹64,836.72 (0.73%)Rejected-AOC LUDHIANA | LUDHIANA | PUNJAB | 141001 | ₹89.1 L+₹64,836.72 (0.73%) | 2 | Rejected-AOC Being Highest |
Tender Value
₹90.1 L
EMD Value
₹1.8 L
Closing Date
26 May 2026, 11:00 amClosed
Divisional Soil conservation officer hoshiarpur
Room No. 440 to 444,4th floor admin complex hoshiarpur
Const of SM Water recharging ROC and Crate wire structure at Vill Pohari and Bringli under sub division Talwara and Stone Masonry ROC and crate wire structure at vill Bahera Bathulla and Kapahat under sub division hoshiarpur
2026_DOA_168438_1
DSWC/HSP/2026-2027/01
Open Tender
Civil Works
Percentage
120 days
different Villages of sub division talwara and hsp
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,500
₹1.8 L
11 Jun 2026
15 May 2026
26 May 2026
15 May 2026
26 May 2026
15 May 2026
DEPARTMENT OF SOIL AND WATER CONSERVATION, PUNJAB
Tender No. DSWC/HSP/2026-2027/01
Construction of Stone Masonry Water Recharging, ROC and Crate Wire Structures at Vill.Pohari and Bringli under sub division Talwara and Construction of Stone Masonry ROC andCrate Wire Structures at Vill. Bahera, Bathulla and Kapahat under sub division Hoshiarpur
RATES FOR CIVIL WORK( Approved by CCS PUNJAB Chandigarh)
Name & Address of Firm/ Bidder
Total Estimated Cost 9005100
Quoted by Contractor (as %age less of estimated Amount) Less (-%) Amount Quoted
1. Stone Masonry Water Recharging Structure
Village Pohari Tehsil Garhshankar & Distt. Hoshiarpur
Estimate Sanction No. 6386 dated 04/05/2026 Amount = 49,18,100/- o/o CCS Punjab, Chandigarh
1.1 Stone Masonry Water Recharging structure 1
Sr. No. Particulars Qty unit Rate Amount
1 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 79.33 Per Cum 38.98
2 C.C. 1:8:16 in foundation with 40 mm gauge stone aggregate CSR 10.6(b)(ii) as per PWD specifications. 8.49 Per Cum 3433.35
3 Squared Rubbled Masonary 1:5 Below ground level and upto plinth level CSR 12.17 72.68 Per Cum 5602.51
4 Square rubble boulder masonary 1:5 above plinth level CSR 12.17 & 12.25 as per PWD specifications. 78.34 Per Cum 6089.23
5 Cement concerete 1:2:4 with stone aggregate CSR 10.13 a(i) as per PWD specifications. 3.33 Per Cum 5058.9
6 Plaster 1:4 12.5 mm thick CSR 15.9 as per PWD specifications. 58.9 Per Sqm 213.54
7 Extra Carriage of material like Boulder, Sand, Bajri, Gatka etc. 229.6 Per Cum 337.94
8 PVC pipe 110 mm 10 mtr 220.28
9 E/w excavation for crate wire CSR 6.19 as per PWD specifications 8.4 Per Cum 38.98
10 Weaving of wire mesh 15x15cm as per PWD specifications CSR 23.29 56 Per Sqm 197
11 Spreading of wire mesh 15x15cm as per PWD specifications CSR 23.37 56 Per Sqm 73.75
12 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 12 Per Cum 1458.04
13 Extra Carriage of material like Boulder, Sand, Bajri, Gatka etc. 12 Per Cum 337.94
Sub Total = 1062720
1.2 Stone Masonry Water Recharging structure 2
Sr. No. Particulars Qty unit Rate Amount
1 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 78.09 Per Cum 38.98
2 C.C. 1:8:16 in foundation with 40 mm gauge stone aggregate CSR 10.6(b)(ii) as per PWD specifications. 0.00_ Per Cum 3433.35
3 Squared Rubbled Masonary 1:5 Below ground level and upto plinth level CSR 12.17 76.63 Per Cum 5602.51
4 Square rubble boulder masonary 1:5 above plinth level CSR 12.17 & 12.25 as per PWD specifications. 60.23 Per Cum 6089.23
5 Cement concerete 1:2:4 with stone aggregate CSR 10.13 a(i) as per PWD specifications. 2.94 Per Cum 5058.9
6 Plaster 1:4 12.5 mm thick CSR 15.9 as per PWD specifications. 52.45 Per Sqm 213.54
7 Extra Carriage of material like Boulder, Sand, Bajri, Gatka etc. 209.85 Per Cum 337.94
8 E/w excavation for crate wire CSR 6.19 as per PWD specifications 10.6 Per Cum 38.98
9 Weaving of wire mesh 15x15cm as per PWD specifications CSR 23.29 74 Per Sqm 197
10 Spreading of wire mesh 15x15cm as per PWD specifications CSR 23.37 74 Per Sqm 73.75
11 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 16 Per Cum 1458.04
12 Extra Carriage of material like Boulder, Sand, Bajri, Gatka etc. 16 Per Cum 337.94
Sub Total = 976055
1.3 Stone Masonry Water Recharging structure 3
Sr. No. Particulars Qty unit Rate Amount
1 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 124.35 Per Cum 38.98
2 C.C. 1:8:16 in foundation with 40 mm gauge stone aggregate CSR 10.6(b)(ii) as per PWD specifications. 15.79 Per Cum 3433.35
3 Squared Rubbled Masonary 1:5 Below ground level and upto plinth level CSR 12.17 127.62 Per Cum 5602.51
4 Square rubble boulder masonary 1:5 above plinth level CSR 12.17 & 12.25 as per PWD specifications. 82.39 Per Cum 6089.23
5 Cement concerete 1:2:4 with stone aggregate CSR 10.13 a(i) as per PWD specifications. 4.76 Per Cum 5058.9
6 Plaster 1:4 12.5 mm thick CSR 15.9 as per PWD specifications. 88.33 Per Sqm 213.54
7 Extra Carriage of material like Boulder, Sand, Bajri, Gatka etc. 0.00_ Per Cum 337.94
8 PVC pipe 110 mm 10 mtr 220.28
9 E/w excavation for crate wire CSR 6.19 as per PWD specifications 17.6 Per Cum 38.98
10 Weaving of wire mesh 15x15cm as per PWD specifications CSR 23.29 106 Per Sqm 197
11 Spreading of wire mesh 15x15cm as per PWD specifications CSR 23.37 106 Per Sqm 73.75
12 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 23 Per Cum 1458.04
13 Extra Carriage of material like Boulder, Sand, Bajri, Gatka etc. 23 Per Cum 337.94
Sub Total = 1501593
1.4 Stone Masonry Water Recharging structure 4
Sr. No. Particulars Qty unit Rate Amount
1 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 102.63 Per Cum 38.98
2 C.C. 1:8:16 in foundation with 40 mm gauge stone aggregate CSR 10.6(b)(ii) as per PWD specifications. 11.07 Per Cum 3433.35
3 Squared Rubbled Masonary 1:5 Below ground level and upto plinth level CSR 12.17 93.1 Per Cum 5602.51
4 Square rubble boulder masonary 1:5 above plinth level CSR 12.17 & 12.25 as per PWD specifications. 102.33 Per Cum 6089.23
5 Cement concerete 1:2:4 with stone aggregate CSR 10.13 a(i) as per PWD specifications. 4.14 Per Cum 5058.9
6 Plaster 1:4 12.5 mm thick CSR 15.9 as per PWD specifications. 66.4 Per Sqm 213.54
7 Extra Carriage of material like Boulder, Sand, Bajri, Gatka etc. 296.86 Per Cum 337.94
8 PVC pipe 110 mm 10 mtr 220.28
9 E/w excavation for crate wire CSR 6.19 as per PWD specifications 9.9 Per Cum 38.98
10 Weaving of wire mesh 15x15cm as per PWD specifications CSR 23.29 62 Per Sqm 197
11 Spreading of wire mesh 15x15cm as per PWD specifications CSR 23.37 62 Per Sqm 73.75
12 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 13.5 Per Cum 1458.04
13 Extra Carriage of material like Boulder, Sand, Bajri, Gatka etc. 13.5 Per Cum 337.94
Sub Total = 1365775
1.5 Display Board
Sr. No. Particulars Qty unit Rate Amount
1 Display Board (6'X4' in size complete in all respect) 4 no. 3000
TOTAL (A) SAY = 4918100
2. Stone Masonry Water Recharging Structure
Village Pohari Tehsil Garhshankar & Distt. Hoshiarpur
Estimate Sanction No. 6394 dated 04/05/2026 Amount = 18,29,600/- o/o CCS Punjab, Chandigarh
2.1 Stone Masonry Water Recharging structure 1
Sr. No. Particulars Qty unit Rate Amount
1 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 66.86 Per Cum 38.98
2 C.C. 1:8:16 in foundation with 40 mm gauge stone aggregate CSR 10.6(b)(ii) as per PWD specifications. 7.66 Per Cum 3433.35
3 Squared Rubbled Masonary 1:5 Below ground level and upto plinth level CSR 12.17 64.45 Per Cum 5602.51
4 Square rubble boulder masonary 1:5 above plinth level CSR 12.17 & 12.25 as per PWD specifications. 54.73 Per Cum 6089.23
5 Cement concerete 1:2:4 with stone aggregate CSR 10.13 a(i) as per PWD specifications. 2.47 Per Cum 5058.9
6 Plaster 1:4 12.5 mm thick CSR 15.9 as per PWD specifications. 45.95 Per Sqm 213.54
7 Extra Carriage of material like Boulder, Sand, Bajri, Gatka etc. 182.4 Per Cum 337.94
9 E/w excavation for crate wire CSR 6.19 as per PWD specifications 9.6 Per Cum 38.98
10 Weaving of wire mesh 15x15cm as per PWD specifications CSR 23.29 70 Per Sqm 197
11 Spreading of wire mesh 15x15cm as per PWD specifications CSR 23.37 70 Per Sqm 73.75
12 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 15 Per Cum 1458.04
13 Extra Carriage of material like Boulder, Sand, Bajri, Gatka etc. 15 Per Cum 337.94
2.2 Stone Masonry Water Recharging structure 2
Sr. No. Particulars Qty unit Rate Amount
1 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 70.98 Per Cum 38.98
2 C.C. 1:8:16 in foundation with 40 mm gauge stone aggregate CSR 10.6(b)(ii) as per PWD specifications. 8.14 Per Cum 3433.35
3 Squared Rubbled Masonary 1:5 Below ground level and upto plinth level CSR 12.17 72.35 Per Cum 5602.51
4 Square rubble boulder masonary 1:5 above plinth level CSR 12.17 & 12.25 as per PWD specifications. 61.94 Per Cum 6089.23
5 Cement concerete 1:2:4 with stone aggregate CSR 10.13 a(i) as per PWD specifications. 2.59 Per Cum 5058.9
6 Plaster 1:4 12.5 mm thick CSR 15.9 as per PWD specifications. 46.95 Per Sqm 213.54
7 Extra Carriage of material like Boulder, Sand, Bajri, Gatka etc. 204.46 Per Cum 337.94
9 E/w excavation for crate wire CSR 6.19 as per PWD specifications 12 Per Cum 38.98
10 Weaving of wire mesh 15x15cm as per PWD specifications CSR 23.29 98 Per Sqm 197
11 Spreading of wire mesh 15x15cm as per PWD specifications CSR 23.37 98 Per Sqm 73.75
12 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 21 Per Cum 1458.04
13 Extra Carriage of material like Boulder, Sand, Bajri, Gatka etc. 21 Per Cum 337.94
2.3 Display Board
Sr. No. Particulars Qty unit Rate Amount
1 Display Board (6'X4' in size complete in all respect) 2 no. 3000
TOTAL (B) SAY = 1829600
3. Crate Wire Structures
Village Bringli Tehsil Mukerian & Distt. Hoshiarpur
Estimate Sanction No. 124 dated 13/04/2026 Amount = 4,43,000/- o/o CS, SAS Nagar
3.1 Crate Wire Structures
Sr. No. Particulars Qty unit Rate Amount
1 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 79.2 Per Cum 38.98
2 Weaving of wire crates in size 15x15cm as per PWD specifications CSR 23.29 637 Per Sqm 197
3 Spreading of wire crates as per PWD specifications CSR 23.37 637 Per Sqm 73.75
4 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 150 Per Cum 1458.04
5 Carriage of material like Boulder, Sand, Bajri, Gatka etc. 150 Per Cum 0.00_
TOTAL (C) SAY = 443000
4. Stone Masonry Water Recharging and Crate Wire Structures
Village Pohari Tehsil Mukerian & Distt. Hoshiarpur
Estimate Sanction No. 148 dated 15/04/2026 Amount = 4,92,100/- o/o CS, SAS Nagar
4.1 Crate Wire Structures
Sr. No. Particulars Qty unit Rate Amount
1 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 61.43 Per Cum 38.98
2 Weaving of wire crates in size 15x15cm as per PWD specifications CSR 23.29 527.25 Per Sqm 197
3 Spreading of wire crates as per PWD specifications CSR 23.37 527.25 Per Sqm 73.75
4 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 122.63 Per Cum 1458.04
5 Carriage of material like Boulder, Sand, Bajri, Gatka etc. 122.63 Per Cum 337.94
4.2 Stone Masonry ROC
Sr. No. Particulars Qty unit Rate Amount
1 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 8.97 Per Cum 38.98
2 C.C. 1:8:16 in foundation with 40 mm gauge stone aggregate CSR 10.6(b)(ii) as per PWD specifications. 1.88 Per Cum 3433.35
3 Cement concerete 1:2:4 with stone aggregate CSR 10.13 a(i) as per PWD specifications. 0.8 Per Cum 5058.9
4 Squared Rubbled Masonary 1:5 Below ground level and upto plinth level CSR 12.17 6.75 Per Cum 5602.51
5 Square rubble boulder masonary 1:5 above plinth level CSR 12.17 & 12.25 as per PWD specifications. 10.78 Per Cum 6089.23
6 Plaster 1:4 12.5 mm thick CSR 15.9 as per PWD specifications. 13.05 Per Sqm 213.54
7 Extra Carriage of material like Boulder, Sand, Bajri, Gatka etc. 28.65 Per Cum 337.94
TOTAL (D) SAY = 492100
5. Crate Wire Structures
Village Bahera Tehsil Bhunga & Distt. Hoshiarpur
Estimate Sanction No. 337 dated 24/04/2026 Amount = 4,10,800/- o/o CS, SAS Nagar
5.1 Crate Wire Structures
Sr. No. Particulars Qty unit Rate Amount
1 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 76.8 Per Cum 38.98
2 Weaving of wire crates in size 15x15cm as per PWD specifications CSR 23.29 489.76 Per Sqm 197
3 Spreading of wire crates as per PWD specifications CSR 23.37 489.76 Per Sqm 73.75
4 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 144 Per Cum 1458.04
5 Carriage of material like Boulder, Sand, Bajri, Gatka etc. 144 Per Cum 453.23
TOTAL (E) SAY = 410800
6. Crate Wire Structures
Village Bathulla Tehsil & Distt. Hoshiarpur
Estimate Sanction No. 340 dated 24/04/2026 Amount = 5,13,000/- o/o CS, SAS Nagar
6.1 Crate Wire Structures
Sr. No. Particulars Qty unit Rate Amount
1 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 90 Per Cum 38.98
2 Weaving of wire crates in size 15x15cm as per PWD specifications CSR 23.29 546.75 Per Sqm 197
3 Spreading of wire crates as per PWD specifications CSR 23.37 546.75 Per Sqm 73.75
4 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 183.75 Per Cum 1458.04
5 Carriage of material like Boulder, Sand, Bajri, Gatka etc. 183.75 Per Cum 509.57
TOTAL (F) SAY = 513000
7. Stone Masonry ROC Structures
Village Kapahat Tehsil & Distt. Hoshiarpur
Estimate Sanction No. 340 dated 24/04/2026 Amount = 3,98,500/- o/o CS, SAS Nagar
7.1 Stone Masonry ROC structures 1,2 and 3
Sr. No. Particulars Qty unit Rate Amount
1 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 28.76 Per Cum 38.98
2 C.C. 1:8:16 in foundation with 40 mm gauge stone aggregate CSR 10.6(b)(ii) as per PWD specifications. 4.43 Per Cum 3433.36
3 Cement concerete 1:2:4 with stone aggregate CSR 10.13 a(i) as per PWD specifications. 2.59 Per Cum 5058.91
4 Squared Rubbled Masonary 1:5 Below ground level and upto plinth level CSR 12.17 22.78 Per Cum 5602.51
5 Square rubble boulder masonary 1:5 above plinth level CSR 12.17 & 12.25 as per PWD specifications. 30.77 Per Cum 6089.23
6 Plaster 1:4 12.5 mm thick CSR 15.9 as per PWD specifications. 47.8 Per Sqm 213.54
7 Extra Carriage of material like Boulder, Sand, Bajri, Gatka etc. 85.88 Per Cum 511.78
TOTAL (G) SAY = 398500
GRAND TOTAL (A+B+C+D+E+F+G) =
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.52 MB
Finbid1.xls
Additional Documents • 0.06 MB
DNIT01.pdf
Tender Documents • 0.51 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .