| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.2 CrAccepted-Finance | ₹1.2 Cr | 1 | Accepted-Finance being 1st lowest |
| 2 | 2₹1.3 Cr+₹4.9 L (4.01%)Rejected-Finance | ₹1.3 Cr+₹4.9 L (4.01%) | 2 | Rejected-Finance being 2nd lowest |
| 3 | 3₹1.3 Cr+₹9.9 L (8.07%)Rejected-Finance | ₹1.3 Cr+₹9.9 L (8.07%) | 3 | Rejected-Finance being 3rd lowest |
| 4 | 4₹1.5 Cr+₹26.3 L (21.4%)Rejected-Finance | ₹1.5 Cr+₹26.3 L (21.4%) | 4 | Rejected-Finance being 4th lowest |
| 5 | 5₹1.7 Cr+₹50.6 L (41.3%)Rejected-Finance | ₹1.7 Cr+₹50.6 L (41.3%) | 5 | Rejected-Finance being 5th lowest |
Tender Value
₹1.8 Cr
EMD Value
₹3.5 L
Closing Date
16 Feb 2026, 4:00 pmClosed
Superintending Engineer Hydraulic Circle Udhampur
superintending Engineer Hydraulic Circle Udhampur
Imp Augmention of Sheetalpuri Khul RD 0-2500 mtr (under UT Capex).
2026_IFC_302324_1
Fresh enit 20 of 2025-26 Dt05-02-2026
Open Tender
Civil Works
Percentage
419 days
udhampur
as per Enit
8 documents required · 8 mandatory
₹1,000
superintending Engineer Hydraulic Circle Udhampur
₹3.5 L
25 Feb 2026
5 Feb 2026
17 Feb 2026
5 Feb 2026
16 Feb 2026
5 Feb 2026
Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil
Providing and laying in position cement concrete 1:4:8 (1 cement: 4 fine sand: 8 graded stone aggregate 20mm nominal size) excluding the cost of centering and shuttering. All work up to plinth level. Crushed
Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All work upto plinth level (1:2:4) 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement. 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centering and shuttering. all work upto plinth level with 1:3:6 (1 cement: 3 coarse sand: 6 graded stone aggregate 20mm nominal size).
Centering and shuttering including strutting propping etc. and removal of form work for. a) Foundation, footing, bases of columns.
Centering and shuttering including strutting propping etc. and removal of form work for. b) Retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets etc
Centering and shuttering including strutting propping etc. and removal of form work for.c ) Lintel, beams, plinth beams, girders, bressumers and cantilevers
Centering and shuttering including strutting propping etc. and removal of form work for.d) Suspended floors, roofs, landings, balconies and access platform
Centering and shuttering including strutting propping etc. and removal of form work for.e) Edges of slabs and breaks in floors and walls under 20 cm wide
Cement concrete flooring 1:2:4 (1 Cement : 2 Coarse sand: 4 graded stone aggregate finishing with floating coat of neat cement including cement slurry, but excluding the cost of noising of steps etc complete. 40mm thick with 20 mm nominal size stone aggregate, (crushed)
Reinforcement for RCC work including straightening, cutting, bending placing in position and binding all complete. Cold twisted bars.
Dumping stones excluding cost of stones in horizontal on level.
Supply of stone boulders(nallah)nominal size 225 mm (Stack measurements reduced by 15%)
Providing and laying Double Flanged (screwed / welded) Centrifugally (Spun) Cast Iron, Class B (IS : 1536) 300 mm dia C.I. Double Flanged Pipe
Providing flanged joints to double flanged C.I. / D.I pipes and specials including testing to joints. 300 mm dia. Pipe
Providing steel rope crossing including cost of steel wire rope, U-clam/Hooks/labour charges for launching of steel rope in position hire charges of chain block along with operator, laying and fitting of pipes all complete job. L to be paid as per actual.
Structural steel work in built up sections, trusses and framed work ,including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. Welded
Carriage of Nallah Stones from source upto site of work. A. Av. 200 mtr by Head Load.
Carriage of Sand from Nud upto site of work. A. Av. 125 km by MT & 2150 mtr by Head Load.
Carriage of Stones aggregate from nearest source upto site of work. A. Av. 22 km by MT & 2150 mtr by Head Load
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.57 MB
BOQ_981119.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .