Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹44.2 LAccepted-Finance | ₹44.2 L | L1 | Accepted-Finance Being L1 |
| 2 | L2₹46.2 L+₹2.1 L (4.66%)Rejected-Finance OPP MARUTI SERVICE CENTRE SARACHARMA POST SRI VIJAYA PURAM 744 105 | SRI VIJAYA PURAM | SOUTH ANDAMANS | ANDAMAN AND NICOBAR ISLANDS | 744105 | ₹46.2 L+₹2.1 L (4.66%) | L2 | Rejected-Finance Not being L1 |
| 3 | L3₹46.4 L+₹2.2 L (4.92%)Rejected-Finance | ₹46.4 L+₹2.2 L (4.92%) | L3 | Rejected-Finance Not being L1 |
| 4 | L4₹46.8 L+₹2.6 L (5.95%)Rejected-Finance | ₹46.8 L+₹2.6 L (5.95%) | L4 | Rejected-Finance Not being L1 |
| 5 | L5₹47.1 L+₹2.9 L (6.66%)Rejected-Finance ROOM NO 01 1ST FLOOR SIMA TRADING BUILDING SURVEY NO 268 GARACHARMA VILL SRI VIJAY PURAM 744105 | SOUTH ANDAMANS | ANDAMAN AND NICOBAR ISLANDS | 744105 | ₹47.1 L+₹2.9 L (6.66%) | L5 | Rejected-Finance Not being L1 |
| Sl No | Description | Qty | Unit | M/s Gurunath Construction L5 | V CHINNA DURAI L3 | SIMONS CONSTRUCTION L8 | SKV Engineering L6 | M/S ISLAND REALCON INDIA PVT. LTD L1 | M/s Ramesh Lal L2 | SWASTHIK ENGINEERING WORKS L7 | Nirman Construction Company L4 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Supply and lay in replacement of 3 layer (inner antimicrobial, outer UV stabilized) ISI marked,IS-15801, PP-R, 110 mm pipes, SDR 7.4 (PN-16) and PP-R plain fittings in trenches/walls/cellings or laying in floors including all required fittings as in trenches/wall/floor, under road etc. complete all as directed. Note (i) The contractor shall provide team comprising of pipe fitter and an assistant for cutting and re-jointing with existing pipe line all as per direction of Engineer-in-charge. The cost for the above items including all type of tools and plants / any type of vehicle / earth moving plant / hitchi / JCB as required at site is deemed to be included in unit rate quoted for above items.
(ii) The contractor shall take due care while executing the work (i.e non damage of electrical cable, telephone cable, water supply pipe line etc) during execution of work if any fault / cutting occurred shall carry out repair immediately and cost of the same shall deemed to be included in quoted rates. | 578 | RM | 2,500 ₹14,45,000 | 2,300 ₹13,29,400 | 2,200 ₹12,71,600 | 2,800 ₹16,18,400 | 2,160 ₹12,48,480 Lowest | 2,250 ₹13,00,500 | 2,400 ₹13,87,200 | 2,600 ₹15,02,800 |
| 2.00 | Supply and lay in replacement of 3 layer (inner antimicrobial, outer UV stabilized) ISI marked,IS-15801, PP-R, 63 mm pipes, SDR 7.4 (PN-16) and PP-R plain fittings in trenches/walls/cellings or laying in floors including all required fittings as in trenches/wall/floor, under road etc. complete all as directed. Note (i) The contractor shall provide team comprising of pipe fitter and an assistant for cutting and re-jointing with existing pipe line all as per direction of Engineer-in-charge. The cost for the above items including all type of tools and plants / any type of vehicle / earth moving plant / hitchi / JCB as required at site is deemed to be included in unit rate quoted for above items.
(ii) The contractor shall take due care while executing the work (i.e non damage of electrical cable, telephone cable, water supply pipe line etc) during execution of work if any fault / cutting occurred shall carry out repair immediately and cost of the same shall deemed to be included in quoted rates. | 978.75 | RM | 1,105 ₹10,81,518.75 | 1,150 ₹11,25,562.5 | 1,400 ₹13,70,250 | 900 ₹8,80,875 Lowest | 1,110 ₹10,86,412.5 | 1,225 ₹11,98,968.75 | 1,200 ₹11,74,500 | 1,000 ₹9,78,750 |
| 3.00 | Supply and lay in replacement of 3 layer (inner antimicrobial, outer UV stabilized) ISI marked,IS-15801, PP-R, 40 mm pipes, SDR 7.4 (PN-16) and PP-R plain fittings in trenches/walls/cellings or laying in floors including all required fittings as in trenches/wall/floor, under road etc. complete all as directed. Note (i) The contractor shall provide team comprising of pipe fitter and an assistant for cutting and re-jointing with existing pipe line all as per direction of Engineer-in-charge. The cost for the above items including all type of tools and plants / any type of vehicle / earth moving plant / hitchi / JCB as required at site is deemed to be included in unit rate quoted for above items.
(ii) The contractor shall take due care while executing the work (i.e non damage of electrical cable, telephone cable, water supply pipe line etc) during execution of work if any fault / cutting occurred shall carry out repair immediately and cost of the same shall deemed to be included in quoted rates. | 24 | RM | 820 ₹19,680 | 825 ₹19,800 | 875 ₹21,000 | 815 ₹19,560 | 795 ₹19,080 | 830 ₹19,920 | 800 ₹19,200 | 750 ₹18,000 Lowest |
| 4.00 | Supply and lay in replacement of 3 layer (inner antimicrobial, outer UV stabilized) ISI marked,IS-15801, PP-R, 25 mm pipes, SDR 7.4 (PN-16) and PP-R plain fittings in trenches/walls/cellings or laying in floors including all required fittings as in trenches/wall/floor, under road etc. complete all as directed. Note (i) The contractor shall provide team comprising of pipe fitter and an assistant for cutting and re-jointing with existing pipe line all as per direction of Engineer-in-charge. The cost for the above items including all type of tools and plants / any type of vehicle / earth moving plant / hitchi / JCB as required at site is deemed to be included in unit rate quoted for above items.
(ii) The contractor shall take due care while executing the work (i.e non damage of electrical cable, telephone cable, water supply pipe line etc) during execution of work if any fault / cutting occurred shall carry out repair immediately and cost of the same shall deemed to be included in quoted rates. | 1,140 | RM | 750 ₹8,55,000 | 715 ₹8,15,100 | 700 ₹7,98,000 | 720 ₹8,20,800 | 670 ₹7,63,800 Lowest | 730 ₹8,32,200 | 690 ₹7,86,600 | 790 ₹9,00,600 |
| 5.00 | S&F in replacement of cast iron sluice valve class PN 1.0 size of 100 mm bore heavy duty both ends flanged, suitable for 110 mm sizes bore of PP-R pipe conforming to IS 14846 of 2000 duly ISI marked with wheel operated handle with high tensile stainless steel spindle, including nuts, bolts, washers etc of required size and making arrangement for safe working complete all as specified and as directed by Engineer-in-Charge. | 13 | Each | 29,000 ₹3,77,000 Lowest | 31,000 ₹4,03,000 | 30,000 ₹3,90,000 | 32,500 ₹4,22,500 | 32,000 ₹4,16,000 | 30,000 ₹3,90,000 | 29,500 ₹3,83,500 | 30,000 ₹3,90,000 |
| 6.00 | Supply and fix in replacement of PPR Gate Valves (Brass Insert) of 63 mm bore ISI marked and complete all as specified and as directed. | 75 | Each | 2,750 ₹2,06,250 | 3,500 ₹2,62,500 | 3,000 ₹2,25,000 | 3,250 ₹2,43,750 | 2,355 ₹1,76,625 | 2,400 ₹1,80,000 | 3,333 ₹2,49,975 | 2,200 ₹1,65,000 Lowest |
| 7.00 | Supply and fix in replacement of PPR Gate Valves (Brass Insert) of 40 mm bore ISI marked and complete all as specified and as directed. | 2 | Each | 1,400 ₹2,800 | 1,550 ₹3,100 | 1,300 ₹2,600 Lowest | 1,450 ₹2,900 | 1,550 ₹3,100 | 1,480 ₹2,960 | 1,350 ₹2,700 | 1,600 ₹3,200 |
| 8.00 | Supply and fix in replacement of PPR Ball Valves (Brass Insert) of 25 mm bore ISI marked and complete all as specified and as directed. | 300 | Each | 690 ₹2,07,000 | 720 ₹2,16,000 | 730 ₹2,19,000 | 695 ₹2,08,500 | 785 ₹2,35,500 | 725 ₹2,17,500 | 689 ₹2,06,700 Lowest | 750 ₹2,25,000 |
| 9.00 | M & L cement concrete in foundations, fillings and mass concrete type D-2, 1:4:8 with 40 mm gradedstone / aggregate and complete all as specified and as directed. | 8 | Cum | 12,000 ₹96,000 | 9,000 ₹72,000 Lowest | 10,000 ₹80,000 | 12,500 ₹1,00,000 | 13,000 ₹1,04,000 | 9,500 ₹76,000 | 10,500 ₹84,000 | 11,000 ₹88,000 |
| 10.00 | M&L for cutting of Road/Hard standing for laying/existing pipe line upto 150 mm bore dia including making good patch work by cement concrete type B1 1:2:4 using 40mm graded stone aggregate 150mm thick and finishing the surface with CM 1:2, 15mm thick all as specified and as directed by Engineer-in-Charge. | 6 | Cum | 22,500 ₹1,35,000 | 21,000 ₹1,26,000 | 18,500 ₹1,11,000 | 18,000 ₹1,08,000 Lowest | 20,000 ₹1,20,000 | 19,500 ₹1,17,000 | 20,500 ₹1,23,000 | 19,000 ₹1,14,000 |
Tender Value
₹42 L
EMD Value
₹84,000
Closing Date
17 Jun 2026, 6:00 pmClosed
GE Minniebay Sri Vijaya Puram
GE Minniebay Sri Vijaya Puram
SPECIAL REPAIR OF WATER SUPPLY PIPE LINE AND CONNECTED WORKS FOR AIRMEN BLDGS AT VAYU VIHAR BROOKSHABAD UNDER OF AGE E/M-II GE MINNIE BAY, SRI VIJAYA PURAM
2026_MES_766785_1
8772/E8
Open Tender
Civil Works
Item Rate
180 days
GE Minniebay Sri Vijaya Puram
Please refer Tender documents.
13 documents required · 13 mandatory
₹500
Yes
GE Minniebay
₹84,000
Yes
3 Sept 2026
21 May 2026
19 Jun 2026
21 May 2026
17 Jun 2026
10 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supply and lay in replacement of 3 layer (inner antimicrobial, outer UV stabilized) ISI marked,IS-15801, PP-R, 110 mm pipes, SDR 7.4 (PN-16) and PP-R plain fittings in trenches/walls/cellings or laying in floors including all required fittings as in trenches/wall/floor, under road etc. complete all as directed. Note (i) The contractor shall provide team comprising of pipe fitter and an assistant for cutting and re-jointing with existing pipe line all as per direction of Engineer-in-charge. The cost for the above items including all type of tools and plants / any type of vehicle / earth moving plant / hitchi / JCB as required at site is deemed to be included in unit rate quoted for above items.
(ii) The contractor shall take due care while executing the work (i.e non damage of electrical cable, telephone cable, water supply pipe line etc) during execution of work if any fault / cutting occurred shall carry out repair immediately and cost of the same shall deemed to be included in quoted rates. | 578 | RM | 1,804 | ₹10,42,712 |
| 2 | Supply and lay in replacement of 3 layer (inner antimicrobial, outer UV stabilized) ISI marked,IS-15801, PP-R, 63 mm pipes, SDR 7.4 (PN-16) and PP-R plain fittings in trenches/walls/cellings or laying in floors including all required fittings as in trenches/wall/floor, under road etc. complete all as directed. Note (i) The contractor shall provide team comprising of pipe fitter and an assistant for cutting and re-jointing with existing pipe line all as per direction of Engineer-in-charge. The cost for the above items including all type of tools and plants / any type of vehicle / earth moving plant / hitchi / JCB as required at site is deemed to be included in unit rate quoted for above items.
(ii) The contractor shall take due care while executing the work (i.e non damage of electrical cable, telephone cable, water supply pipe line etc) during execution of work if any fault / cutting occurred shall carry out repair immediately and cost of the same shall deemed to be included in quoted rates. | 978.75 | RM | 984 | ₹9,63,090 |
| 3 | Supply and lay in replacement of 3 layer (inner antimicrobial, outer UV stabilized) ISI marked,IS-15801, PP-R, 40 mm pipes, SDR 7.4 (PN-16) and PP-R plain fittings in trenches/walls/cellings or laying in floors including all required fittings as in trenches/wall/floor, under road etc. complete all as directed. Note (i) The contractor shall provide team comprising of pipe fitter and an assistant for cutting and re-jointing with existing pipe line all as per direction of Engineer-in-charge. The cost for the above items including all type of tools and plants / any type of vehicle / earth moving plant / hitchi / JCB as required at site is deemed to be included in unit rate quoted for above items.
(ii) The contractor shall take due care while executing the work (i.e non damage of electrical cable, telephone cable, water supply pipe line etc) during execution of work if any fault / cutting occurred shall carry out repair immediately and cost of the same shall deemed to be included in quoted rates. | 24 | RM | 607 | ₹14,568 |
| 4 | Supply and lay in replacement of 3 layer (inner antimicrobial, outer UV stabilized) ISI marked,IS-15801, PP-R, 25 mm pipes, SDR 7.4 (PN-16) and PP-R plain fittings in trenches/walls/cellings or laying in floors including all required fittings as in trenches/wall/floor, under road etc. complete all as directed. Note (i) The contractor shall provide team comprising of pipe fitter and an assistant for cutting and re-jointing with existing pipe line all as per direction of Engineer-in-charge. The cost for the above items including all type of tools and plants / any type of vehicle / earth moving plant / hitchi / JCB as required at site is deemed to be included in unit rate quoted for above items.
(ii) The contractor shall take due care while executing the work (i.e non damage of electrical cable, telephone cable, water supply pipe line etc) during execution of work if any fault / cutting occurred shall carry out repair immediately and cost of the same shall deemed to be included in quoted rates. | 1,140 | RM | 265 | ₹3,02,100 |
| 5 | S&F in replacement of cast iron sluice valve class PN 1.0 size of 100 mm bore heavy duty both ends flanged, suitable for 110 mm sizes bore of PP-R pipe conforming to IS 14846 of 2000 duly ISI marked with wheel operated handle with high tensile stainless steel spindle, including nuts, bolts, washers etc of required size and making arrangement for safe working complete all as specified and as directed by Engineer-in-Charge. | 13 | Each | 46,075 | ₹5,98,975 |
| 6 | Supply and fix in replacement of PPR Gate Valves (Brass Insert) of 63 mm bore ISI marked and complete all as specified and as directed. | 75 | Each | 6,681 | ₹5,01,075 |
| 7 | Supply and fix in replacement of PPR Gate Valves (Brass Insert) of 40 mm bore ISI marked and complete all as specified and as directed. | 2 | Each | 4,258 | ₹8,516 |
| 8 | Supply and fix in replacement of PPR Ball Valves (Brass Insert) of 25 mm bore ISI marked and complete all as specified and as directed. | 300 | Each | 2,089 | ₹6,26,700 |
| 9 | M & L cement concrete in foundations, fillings and mass concrete type D-2, 1:4:8 with 40 mm gradedstone / aggregate and complete all as specified and as directed. | 8 | Cum | 5,483.1 | ₹43,864.8 |
| 10 | M&L for cutting of Road/Hard standing for laying/existing pipe line upto 150 mm bore dia including making good patch work by cement concrete type B1 1:2:4 using 40mm graded stone aggregate 150mm thick and finishing the surface with CM 1:2, 15mm thick all as specified and as directed by Engineer-in-Charge. | 6 | Cum | 5,357.2 | ₹32,143.2 |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.32 MB
8772Tender.pdf
Tender Documents • 0.89 MB
BOQ_858751.xls
BOQ • 0.26 MB
8772DATECORRI.pdf
PDF • 0.20 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .