Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance WARD NO 25 KHANDAGIRI DIST KHORDHA BHUBANESWAR PIN 751030 | BHUBANESWAR | KHORDHA | ODISHA | 751030 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance AT PALAMANDAP SUNDARPADA PS AIRFIELD DIST KHORDHA | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹20.4 L
EMD Value
₹20,500
Closing Date
22 Jun 2026, 5:00 pmClosed
Executive Engineer (Central Tender Cell)
Central Tender Cell, BMC, ICOMC Tower, Unit-9
Development of Gopaluni Gadia Pond in Ward No. 44
2026_ORULB_131778_1
BMC-EE-Tender Cell-35/2026-27 dt. 09.06.2026
Open Tender
Civil Works - Others
Percentage
120 days
BMC, AREA
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹20,500
Yes
UG floor,Office Chamber of EE(Central Tender Cell)
23 Jun 2026
11 Jun 2026
23 Jun 2026
11 Jun 2026
22 Jun 2026
11 Jun 2026
11 Jun 2026 - 17 Jun 2026
17 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Deweeding uprooting rank vegetation and weeds removing all weeds and other growth roots by forkingincluding cost of all labour including disposed off all rubies with all lead etc completed. | 650 | CUM | 44.82 | ₹29,133 |
| 2 | Earth work in slushy soil in water upto 0.60 mtr depth requiring the aid of pan & vessel within 50mtr initial lead and 1.50mtr initial lift. | 520 | CUM | 283.33 | ₹1,47,331.6 |
| 3 | Earth work in all kinds of soil including rough dressing & levelling the bed. | 12.16 | Hour | 299.53 | ₹3,642.28 |
| 4 | Dismantling & removing RCC columns beams slab staircase landing lintels including stacking the useful materials for reuse & removing the debris with in 50m lead as per the direction of the EIC. | 3.48 | cum | 1,696.95 | ₹5,905.39 |
| 5 | Supplying, installing, testing and commissioning of decorative LED park light, comprising IP66 aluminium luminaire with high-efficiency LEDs and integral driver, mounted on decorative MS/GI pole of approved design and height, including RCC foundation, internal wiring, earthing, erection, alignment, testing and commissioning, complete in all respects as per PWD/CPWD specifications, relevant IS standards and directions of EIC. | 26 | nos | 19,900 | ₹5,17,400 |
| 6 | Providing, Supplying, fitting & fixing of 65mm link chain fence of 10SWG using M.S. Angles of size 65X65X6 mm, M.S. Flats of size 25X5 mm and woven wire with cost, conveyance, taxes of all materials, labour, T&P etc. complete as per direction of Engineer-in-Charge. | 204 | sqm | 1,666.3 | ₹3,39,925.2 |
| 7 | Providing, lifting, hoisting and laying Reinforced Cement Concrete of M-25 grade in Column base, Column Footings, Raft Foundation, Stem of the Columns, beams, chaujja, fin, lintel, staircase, jali, shelves and slab etc as per approved designs and drawings having a minimum compressive strength (in worktest) 20N./ Square mm.in 15 cm. cubes at 28 days after mixing and test conducted in accordance with I.S. 456 and I.S. 516 using screened & washed sharp river sand for mortar and 10 mm. to 20 mm. size black hard crusher broken granite stonechips of approved Quality from approved quarry, washed and cleaned, to be mixed in concrete mixture with approved quality of cement including hoisting, lowering, laying and compacting concrete by using vibrators, watering and curing for 28 days including centering and shuttering, thereafter dismantling and removing the debris away from the worksite and finishing the exposed surfaces smooth, providing grooves or beads wherever necessary including cost, conveyance, loading, unloading, royalties and taxes of all materials, cost of all labours, scaffolding, sundries, T&P required for the work etc., complete in all respect, but excluding cost & conveyance of M.S. rods or Tor steel and binding wires and labour charges for straightening, cutting, bending etc. of M.S. rods or Tor steel and binding wires and tying the grills and placing in proper position as directed by the Engineer-in-charge. | 16.22 | cum | 6,634.78 | ₹1,07,616.13 |
| 8 | Supplying fitting & placing uncoated HYSD reinforcement including cutting, bendind, binding& placing the steel rods as per drawing & technical specification approved by the department with cost of binding wire 18 to 20 gauge. | 12.17 | qntl | 8,731.73 | ₹1,06,265.15 |
| 9 | Rigid smooth centering & shuttering including false work & removing the same after casting etc. completed. | 100.64 | sqm | 250.28 | ₹25,188.18 |
| 10 | Enamel painting 2 coats with enamel paint of approved shade on new work to give an even shade including cost of paint (For 9.3 sqm) painter(Special) | 204 | sqm | 173.2 | ₹35,332.8 |
stage.html
html • 0.02 MB
finance_595917.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.93 MB
DTCN.pdf
Tender Documents • 0.89 MB
BOQ_595917.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .