| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹1.4 Cr
EMD Value
₹2.9 L
Closing Date
25 May 2026, 3:00 pmClosed
E.E. P.W.D. DISTT. DN. II UDAIPUR
E.E. P.W.D. DISTT. DN. II UDAIPUR
CONSTRUCTION OF C.C. ROAD FROM BOKHADA TO AMBA CHORA (ATAL PRAGATI PATH BOKHADA SAYRA)
2026_CEPWD_559996_1
NIT No 03/2026-27 EE PWD DISTT DN II UDAIPUR
Open Tender
Civil Works
Percentage
180 days
UDAIPUR
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,000
1000 EE PWD DISTT DN II UDAIPUR 2000 MDRISL JAIPUR
₹2.9 L
Yes
25 May 2026
16 May 2026
25 May 2026
16 May 2026
25 May 2026
16 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and Grubbing Road Land .Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRTH Specification Clause 201. By Mechanical Means In area of non-thorny jungle | 0.45 | P.Hect | 10,374 | ₹4,668.3 |
| 2 | Excavation in Soil using Hydraulic Excavator and Tippers with disposal upto 1000 m : Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per MoRTH Specification Clause 301.3 | 822.38 | P.Cum | 25 | ₹20,559.5 |
| 3 | Construction of Subgrade and Earthen Shoulders: Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300-2 with lead upto 50 m as per MoRTH Specification Clause 305.3 | 3,098.25 | P.Cum | 45 | ₹1,39,421.25 |
| 4 | Crusher Run Macadam Base: Providing crushed run stone aggregate greading conforming to table 400-14 depositing on a prepared surface by hauling vehicles, spreading and mixing with a motor grader, watering and compacting with a three wheel 80-100 kN static roller as per MoRTH Specification Clause 407 to form a layer of sub-base/base By mix-in-place method With 53 mm maximum size of aggregates | 822.38 | P.Cum | 758 | ₹6,23,364.04 |
| 5 | Dry Lean Cement Concrete Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a fully automatic computerised batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing. For All Rajasthan except Bikaner | 902.7 | P.Cum | 2,418 | ₹21,82,728.6 |
| 6Cement Concrete Pavement (Construction of un-reinforced , plain cement concrete pavement M30 (Grade), thickness as per design, over a prepared sub base, with 43/53 grade cement as per Clause 602, coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 31.5 mm, mixed in fully automatic Computerised Batching Plant compatiable with Printer and Pen Drive and transported to site in transit mixer for having continuous agitated mixer, manufactured as per approved mix design including pumping of R.M.C. from transit mixer to site of laying , with all lead and lift including cost of admixtures in recommended portion as per IS 9103 to accelerate/ retard setting of concrete, improve | |||||
| 6.01 | workability without impairing strength and durability as per direction of Engineer in charge laid with a Fixed Form Paver (laying and fixing of 150 micron thick polythene Film and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days using water finishing to lines and grade as per drawing and MoRTH Specification Clause 602 with all required equipments (Dowel Bars & Tie Bar will be paid seprately). | 1,262.25 | P.Cum | 5,160 | ₹65,13,210 |
| 7 | High Abgasion Resistance Interlocking Concrete Block Pavement with M-30 Grade 0.30 Mtr x 0.30 Mtr x 0.15 Mtr Edge Blocks (measurements shall be made inner to inner side of edge blocks) Providing and Laying of Interlocking M-30 grade Concrete Block Pavements having thickness 80 mm as per drawings and as per IS 15658:2006.and all materials shall conform to MoRTH Specification Clause 602 with M-30 Grade 0.30 Mtr x 0.30 Mtr x 0.15 Mtr Edge Blocks. Category 'C' : Not dentated on any of its faces like Hexagonal, Rectangular, Square shape as per IRC:SP:63-2004 | 720 | P.Sqm | 644 | ₹4,63,680 |
| 8Kilo Metre Stone (Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and MoRTH Specification Clause 801) | |||||
| 8.01 | Ordinary Kilometer stone (precast) | 2 | Each | 1,869 | ₹3,738 |
stage.html
html • 0.02 MB
finance_996865.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.17 MB
Fin_01_New.pdf
Tender Documents • 11.42 MB
BOQ_996865.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .