| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹16.0 LAccepted-AOC MU PO SATAKAL TA PHALTAN JI SATARA | SATARA | MAHARASHTRA | ₹16.0 L | 1 | Accepted-AOC Work Order |
| 2 | 2₹16.3 L+₹32,026.99 (2.00%)Rejected-Finance | ₹16.3 L+₹32,026.99 (2.00%) | 2 | Rejected-Finance Reject |
| 3 | 3₹16.5 L+₹48,040.48 (3.00%)Rejected-Finance SHINDEWADI TAL PHALTAN DIST SATARA MAHARASHTRA | PHALTAN | SATARA | MAHARASHTRA | ₹16.5 L+₹48,040.48 (3.00%) | 3 | Rejected-Finance Reject |
Tender Value
₹16.0 L
EMD Value
₹18,874
Closing Date
20 Jan 2026, 5:00 pmClosed
Additional Chief Executive Officer Z P Satara
Additional Chief Executive Officer Z P Satara
IMPROVEMENT TO S.T.B.T ROAD IN NAGESHWARNAGAR CHOUDHERWADI TO PHALTAN CIRCLE V.R-49 TAL-PHALTAN CH-1/00 TO 2/00
2026_SATAR_1268595_16
Works/North/A-8/3054/9/25-26
Open Tender
Civil Works
Percentage
180 days
IMPROVEMENT TO S.T.B.T ROAD IN NAGESHWARNAGAR CHOU
Open
9 documents required · 9 mandatory
₹1,000
₹18,874
25 Jul 2026
13 Jan 2026
21 Jan 2026
13 Jan 2026
20 Jan 2026
13 Jan 2026
Excavation for catch / side water gutter in all sorts of soils to the specified section including stacking the excavated stuff in a regular bund and disposing off unsuitable or excess stuff as directed all sorts of soils. Item / Page No : 18 / 24 Specification No : MORTH-301, 309 Spec. Page No : 45-53, 85-89
Labour charges for removing grass, thorney shurbs, Jungli shurb, Kubabhul and alike grass along roadside making the ground clean by showel and phavaras, excetra complete. Item / Page No : 33 / 157 Additional Specifications : The work shall be done as per instructions of Engineer in charge.
Providing and laying cement concrete pipe confirming to Indian Standard 458:2003 non pressure class-2 of 450 milimetre diameter in proper line, level and slope including providng and fixing collars in cement mortar 1:2 and curing, excetra complete. (using ARTIFICIAL SAND). Item / Page No : 8 / 81 Specification No : CD.7 Spec. Page No : 162
Providing earth work in embankment with approved materials obtained from other sources upto lead of 50 metres including all lifts, laying in layers of 20 centimetre to 30 centimetre thickness, breaking clods, dressing to the required lines, curves, grade and section, watering and compaction with vibratory roller with V-Sat attachment to achive not less than 97 percent of standard proctor density, excetra complete. (Material obtained from Other sources) Item / Page No : 28 / 25 Specification No : MORTH-305 Spec. Page No : 63-77
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification inciuding spreading in uniform thickness, hand packing to proper grade and camber, applying and brooming requisite type of screening / binding material to fill the interstices of coarse aggregate, watering and compacting with Vibratory roller to the required density. - By Mechanical Means - Grading I Using Screening type-A (13.2 milimetre Aggregate) Item / Page No : 18 / 29 Specification No : MORTH-401, 402, 404, 902, 112 Spec. Page No : 109-111, 112-116, 121-129, 417-421, 19-21
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing to proper grade and camber, applying and brooming requisite type of screening / binding material to fill the interstices of coarse aggregate, watering and compacting with Vibratory roller to the required density. - By Mechanical Means - Grading II Using Screening type-B (11.2 milimetre Aggregate) Item / Page No : 20 / 29 Specification No : MORTH-401, 402, 404, 902, 112 Spec. Page No : 109-111, 112-116, 121-129, 417-421, 19-21
Providing and constructing 50 milimetre thick modified penetration macadam road surface including all materials, preparing the existing road surface, spreading 40 milimetre stone metal layers 30 percent crusher broken metal plus 70 percent hand broken (by breaking rubble obtained by blasting), heating and spraying the bitumen of specified grade at the rate of 1.75 kilogram per square metre, spreading 12 milimetre size chips, compacting with static roller having weight 8 to 10 metric tonnes to achive the desired degree of compaction as per technical specification Clause 506, excetra complete. Including picking of existing water bound macadam surface. (Using VG-30 bulk bitumen) Item / Page No : 37a / 32 Specification No : IRC-SP-20 Spec. Page No : 215
Providing and Laying open graded premix surfacing of 20 milimetre thickness composed of 13.2 milimetre to 5.6 milimetre aggregates premixed with bituminous binder, transported to site with vehicle tracking system, laid over a previously prepared surface, finished to the required grade, level, alignment, and rolling to achieve the desired compaction, excluding prime / tack coat and seal coat. For Bitumen VG-30 bulk (Grade 60/70) - Using drum mix type hot mix plant without Supervisory Control and Data Acquisition, Paver and vibratory roller. (Over modified penetration macadam surface) Item / Page No : 12 / 36 Specification No : MORTH-501, 510, 511, 902, 903, 112, MORTH-503 Spec. Page No : 149-162, 198-205, 205-207, 417-421, 421-436, 19-21, 168-170
Providing bituminous type-A liquid seal coat on bituminous surface including supplying all materials and bitumen of VG-30 grade, preparing existing road surface, heating and applying bitumen at the rate of 0.98 kilogram per square metre by mechanical means, spreading chips and rolling by static roller having weight 8 to 10 metric tonne, excetra complete. Item / Page No : 1 / 35 Specification No : MORTH-511 Spec. Page No : 149-162, 205-207, 198-205, 417-421, 19-21
Supplying hard murum / kankar at the road site, including conveying and stacking, excetra complete. Item / Page No : 29a / 25 Specification No : MORTH-408 Spec. Page No : 139-142
Spreading hard murum / soft murrum / gravel or kankar for side width, excetra complete. Item / Page No : 30 / 25 Specification No : MORTH-408 Spec. Page No : 139-142
Compacting the hard murum side widths including laying in layers on each side with vibratory roller including artificial watering, excetra complete. Item / Page No : 31 / 25 Specification No : MORTH-408 Spec. Page No : 139-142
Water Absorption, Specific Gravity, Impact Value, Crushing Value Test for Metal 40 milimetre and above (Crusher Broken) 1 Test per Source
Sieve Analysis Test for Metal below 40 milimetre 1 Test per 100.00 Cubic Metre
Water Absorption, Specific Gravity, Impact Value, Crushing Value Test for Metal below 40 milimetre 1 Test per Source
Sieve Analysis Test for Hard Murrm 1 Test per 100.00 Cubic Metre
Liquid Limit and Plastic Limit for Hard Murum 1 Test per 250.00 Cubic Metre
Penetration, Softening Point, Flash and Fire Point, Specific Gravity for Asphalt VG-30 (Grade 60/70) 1 Test per 10.00 Metric Ton
Extraction Test for Mix Material (OGC) 2 Test per 500.00 Cubic Metre
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.49 MB
b1.pdf
Tender Documents • 4.11 MB
BOQ_2185148.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .