| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.7 CrAccepted-AOC M 13 S S HARMU HOUSING COLONY PS ARGORA PO DORANDA RANCHI JHARKHAND 834002 | RANCHI | JHARKHAND | 834002 | ₹9.7 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹10.0 Cr+₹30.5 L (3.14%)Rejected-Finance GOPIKANDAR DUMKA JHARKHAND | DUMKA | JHARKHAND | 814101 | ₹10.0 Cr+₹30.5 L (3.14%) | L2 | Rejected-Finance HIGHEST QUOTED RATE |
| 3 | L3₹10.3 Cr+₹56.3 L (5.79%)Rejected-Finance BEHIND HERO HONDA SHOWROOM DUDHANI BHAGALPUR ROAD DUMKA | DUMKA | JHARKHAND | 814101 | ₹10.3 Cr+₹56.3 L (5.79%) | L3 | Rejected-Finance HIGHEST QUOTED RATE |
| 4 | L4₹10.6 Cr+₹83.5 L (8.60%)Rejected-Finance | ₹10.6 Cr+₹83.5 L (8.60%) | L4 | Rejected-Finance HIGHEST QUOTED RATE |
| 5 | L5₹10.7 Cr+₹99.3 L (10.2%)Rejected-Finance | ₹10.7 Cr+₹99.3 L (10.2%) | L5 | Rejected-Finance HIGHEST QUOTED RATE |
| Sl No | Description | Qty | Unit | SAKSHI ENTERPRISES L4 | TIYA CIVIL TECH PRIVATE LIMITED L2 | HARI NANDAN CHOUDHARY L3 | M/s Dilip Kumar L7 | M/s CHITRA CONSTRUCTION L6 | M/S MANOJ KUMAR PANDEY L1 | SATYA BUILDERS L5 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Clearing and Grubbing Road Land. (Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, sapling and tress girth upto 300 mm, removal of stumps of tree cut earlier and disposal of unserviceable materials and stacking of sericeable material to be used of auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150mm in thickness.)RCD SOR - 2.03 (i) A | 3.44 | Hec | 76,118.42 ₹2,61,847.36 | 72,295.24 ₹2,48,695.63 | 74,153.73 ₹2,55,088.83 | 90,000 ₹3,09,600 | 25,000 ₹86,000 | 20,000 ₹68,800 Lowest | 50,000 ₹1,72,000 |
| 2.00 | Cutting of Trees, including Cutting of Trunks, Branches and Removal (Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 mtrs and earth filling in the depression/pit.)
(i) Girth from 300 mm to 600 mmRCD SOR - 2.01 (A+B) (i) | 33 | each | 516.98 ₹17,060.34 | 500.51 ₹16,516.83 | 513.38 ₹16,941.54 | 625 ₹20,625 | 200 ₹6,600 | 50 ₹1,650 Lowest | 300 ₹9,900 |
| 3.00 | Cutting of Trees, including Cutting of Trunks, Branches and Removal (Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 mtrs and earth filling in the depression/pit.)
(i) Girth from 600 mm to 900 mmRCD SOR - 2.01 (A+B) (i) | 10 | each | 796.11 ₹7,961.1 | 756.12 ₹7,561.2 | 775.56 ₹7,755.6 | 945 ₹9,450 | 200 ₹2,000 | 50 ₹500 Lowest | 300 ₹3,000 |
| 4.00 | Cutting of Trees, including Cutting of Trunks, Branches and Removal (Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 mtrs and earth filling in the depression/pit.)
(iii) Girth from 900 mm to 1800 mmRCD SOR - 2.01 (A+B) (iii) | 5 | each | 1,234.07 ₹6,170.35 | 1,172.09 ₹5,860.45 | 1,202.22 ₹6,011.1 | 1,450 ₹7,250 | 200 ₹1,000 | 50 ₹250 Lowest | 300 ₹1,500 |
| 5.00 | Cutting of Trees, including Cutting of Trunks, Branches and Removal (Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 mtrs and earth filling in the depression/pit.)
(iii) Girth above 1800 mmRCD SOR - | 7 | each | 2,187.84 ₹15,314.88 | 2,077.95 ₹14,545.65 | 2,131.37 ₹14,919.59 | 2,600 ₹18,200 | 250 ₹1,750 | 50 ₹350 Lowest | 300 ₹2,100 |
| 6.00 | Dismantling of Structures (Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concree, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with allk lifts and lead of 1000 metres) B) Cement Concrete Grade M-15 & M-20RCD SOR - 2.04 (I) B | 31.07 | cum | 389.11 ₹12,089.65 | 369.57 ₹11,482.54 | 379.07 ₹11,777.7 | 500 ₹15,535 | 25 ₹776.75 Lowest | 200 ₹6,214 | 400 ₹12,428 |
| 7.00 | Dismantling of Structures (Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concree, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with allk lifts and lead of 1000 metres) iii) (B) Stone masonry Structures in cement mortarRCD SOR - 2.04 (III) B | 732.19 | cum | 246.25 ₹1,80,301.79 | 233.88 ₹1,71,244.6 | 239.89 ₹1,75,645.06 | 300 ₹2,19,657 | 25 ₹18,304.75 Lowest | 100 ₹73,219 | 200 ₹1,46,438 |
| 8.00 | Dismantling of Structures (Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concree, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with allk lifts and lead of 1000 metres) RCCRCD SOR - 2.04 (II) B | 58.6 | cum | 762.91 ₹44,706.53 | 724.59 ₹42,460.97 | 743.22 ₹43,552.69 | 900 ₹52,740 | 25 ₹1,465 Lowest | 400 ₹23,440 | 700 ₹41,020 |
| 9.00 | Dismantling of flexible pavements and disposal of dismantled materials upto a leadof 1000 metres, stacking serviceable and unserviceable materials separatelyRCD SOR - 2.05(ii) A | 823.27 | cum | 201.26 ₹1,65,691.32 | 191.15 ₹1,57,368.06 | 196.07 ₹1,61,418.55 | 250 ₹2,05,817.5 | 25 ₹20,581.75 Lowest | 100 ₹82,327 | 200 ₹1,64,654 |
| 10.00 | Removal of Telephone / Electric Poles and Lines (Removal of telephone/ Electric poles including excavation and dismantling of foundation concrete and lines under the supervision of concerned department , disposal with all lifts and up to a lead of 1000 metres and stacking the serviceable and unserviceable material separately)RCD SOR - 2.14 | 21 | each | 159.2 ₹3,343.2 | 151.21 ₹3,175.41 | 155.1 ₹3,257.1 | 200 ₹4,200 | 10 ₹210 Lowest | 100 ₹2,100 | 100 ₹2,100 |
Tender Value
₹12.3 Cr
EMD Value
₹12.3 L
Closing Date
2 Jan 2025, 12:00 pmClosed
EXECUTIVE ENGINEER RCD ROAD DIVISION DUMKA
EXECUTIVE ENGINEER RCD ROAD DIVISION DUMKA
Widening and Strengthening/Reconstruction of Chaipani (on NH-114A) to Mashniya (Aamgachhi to Kalyanpur Road, on ODR) Road (Total Length-6.670 Km) under Road Division Dumka for the year 2024-25
2024_CECOM_96491_1
RCD/DUMKA/2021
Open Tender
Civil Works
Item Rate
180 days
DUMKA
AS PER SBD
3 documents required · 3 mandatory
₹10,000
₹12.3 L
31 Oct 2025
10 Dec 2024
3 Jan 2025
10 Dec 2024
2 Jan 2025
10 Dec 2024
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .