Tender Value
Refer Docs
EMD Value
₹5,640
Closing Date
14 Feb 2022, 2:30 pmClosed
THE EXECUTIVE ENGINEER STD 2ND RAJBAGH
OFFICE OF THE EXECUTIVE ENGINEER STD 2ND RAJBAGH
Annual Rate Contract for desludging of 33/11kV 3- Phase Power Transformers at various Receiving Stations of STD-IInd Rajbagh for the year 2021-22 or till next rate contract
2022_PDD_159470_1
eNIT No STD-II /109 of 2021-22 Dated 03/02/2022
Open Tender
Electrical Works
Turn-key
7 days
SRINAGAR
Please refer Tender documents.
3 documents required · 3 mandatory
₹200
THE EXECUTIVE ENGINEER STD 2ND RAJBAGH
₹5,640
17 Feb 2022
5 Feb 2022
16 Feb 2022
5 Feb 2022
14 Feb 2022
5 Feb 2022
Amount
Complete Dismantelling of Power Transformer (10 MVA/6.3MVA/5MVA) from circuit
Carriage of Power Transformer upto 20km
Carriage of Power Transformer (10 MVA/6.3MVA/5MVA) for each km onwards beyond 20km
Dismantling/Opening of Power Transformer including assembly viz , radiators, fans and draining of old transformer oil from transformer tank (Complete Job) with Core Desludgging and Hot Oil Bath and dehydration including shifting of drained oil barrels to divisional stores etc
Oil filling Cum Oil Filteration of Old/Fresh Transformer oil (Transformer Oil to be provided by the department)
Refitting/Assembling of Transformer including replacement of Gaskets Bushing/Top lid and testing
Painting inside/out side Transformer Body
Loading of Power Transformer from sub station bed to Platform (Truck) i/c manual dragging, rotation etc (if any required) (Complete Job)
Unloading of Power Transformer from Platform (Truck) to sub station bed i/c manual dragging, rotation etc (if any required) (Complete Job)
Installation, testing and commissioning of Power Transformer(10 MVA/6.3MVA/5MVA) including assembly viz fixing of bushes, radiators fans,(if any) thermometer, wiring of instruments etc and reconnecting to the circuit (complete job)
Providing of Silca Gel Breather
NOTE: The transformer shall be loaded/ unloaded by the firm free of cost at their works substation.
ALBA POWER PVT LTD B/U II
M/s A.M Infra
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .