Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.3 LQualified JAMMU PYRAMID CONSTRUCTIONS SAINIK COLONY JAMMU JAMMU 29 SECTOR SAINIK COLONY JAMMU JAMMU KASHMIR 180011 | JAMMU | JAMMU AND KASHMIR | 180011 | L1 | Qualified MSE, MII, Category: General | |
| 2 | L2₹4.8 L+₹53,900 (12.5%)Qualified WARD NO 55 DEEP NAGAR P O GANGYAL KUNJWANI JAMMU JAMMU KASHMIR 180010 | JAMMU | JAMMU AND KASHMIR | 180010 | L2 | Qualified MSE, MII, Category: General | |
| 3 | L3₹4.9 L+₹57,496 (13.4%)Qualified | L3 | Qualified MSE, MII, Category: General | |
| 4 | Qualified BARI BRAHMANA BARI BRAHMANA BARI BRAHMANA SAMBA JAMMU JAMMU KASHMIR 181133 | SAMBA | JAMMU AND KASHMIR | 181133 | - | Qualified MSE, MII, Category: General | |
| 5 | Disqualified 2ND FLOOR SUKHEJA TOWERS WRIGHT TOWN JABALPUR JABALPUR MADHYA PRADESH 482002 | JABALPUR | MADHYA PRADESH | 482002 | - | Disqualified MSE, Category: General |
Tender Value
Refer Docs
EMD Value
Exempted
Closing Date
21 Oct 2025, 2:00 pmClosed
Supply and Fix copper pipe for suction
Supply and Fix copper pipe for discharge
Supply and fixing duct cover
Supply and fix foaming insulator for AC suction
Supply and fixing the nylon white tape
Supply and fixing XLPE isulated umaoured
Material and labour for system fusing welding
Supply and applying the silicon gel
Supply and applying the flare nut of brass
Supply and fixing the drain pipe
8347312
GEM/2025/B/6680138
Two Packet Bid
Supply and Fix copper pipe for suction
45 days
Jammu
Total value wise evaluation
BOQ
4 documents required · 4 mandatory
3 yrs
₹2 L
50%
Exempted
10 Oct 2025
10 Oct 2025
21 Oct 2025
Replacement of AC copper pipe and Duct cover in AC at
Supply and Fix copper pipe for suction
Supply and Fix copper pipe for discharge
Supply and fixing duct cover
Supply and fix foaming insulator for AC suction
Supply and fixing the nylon white tape
Supply and fixing XLPE isulated umaoured
Material and labour for system fusing welding
Supply and applying the silicon gel
Supply and applying the flare nut of brass
Supply and fixing the drain pipe
Supply and fix copper pipe for suction
Supply and fix copper pipe for discharge
Supply and fix duct cover
Supply and fix foaming insulator for AC
Supply and fix the nylon white tape
Suply and fix XLPE
Material and labour for system fusing
Supply and applying the silicon gel
Supply and applying the flare nut of brass
Supply and fixing the drain pipe of waste
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_8347312.pdf
GEM_BID
ATCACDUC_4244d534-3f8d-4c95-884e1757751411705_consignee@geafjmu.docx
OTHER
list-of-categories-where-trials-are-allowed_1712126171.pdf
OTHER
gtc.pdf
OTHER
ac_bid_2025-09-13-11-48-06_d3b737bf209e4341d44a04596cca12a0.pdf
BOQ
csvacduct_2025-09-13-11-48-06_297be7034eb451b630cd1ad645c4c19e.csv.pdf
BOQ
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .