Tender Value
₹1.8 Cr
EMD Value
₹11.0 L
Closing Date
6 Oct 2026, 12:00 pm
Superintending Engineer Aligarh Circle PWD Aligarh
Office of The SE, Aligarh Circle, P.W.D., Aligarh
New Construction work of Keeratpur to Abupur Road
2026_CEALG_1184522_3
4886/Cashier(C.D.-1 A.)-A.C./26-27 Date 27-08-2026
Open Tender
Civil Works - Roads
Percentage
180 days
Aligarh
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹11.0 L
Yes
Office of The SE, Aligarh Circle, P.W.D., Aligarh
6 Oct 2026
10 Sept 2026
6 Oct 2026
10 Sept 2026
6 Oct 2026
10 Sept 2026
18 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Part-A (Bituminous Work)
Construction of Subgrade and Earthen Shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.), As per Direction by E/I. | 12,600 | Cum | 96 | ₹12,09,600 |
| 3 | Providing, laying & spreading Material on a prepaid sub grade, adding cement @ 2% by weight to the spread Material manually, mixing in place with rotavator and compacting with the road roller at OMC to achieve the desired unconfined compressive strength and to from a layer of sub base. (MORTH SPECIFICATION 405) (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.), As per Direction by E/I. | 829 | Cum | 3,450 | ₹28,60,050 |
| 4 | Providing, laying & spreading Material on al prepaid sub base cement @ 4% by weight to the spread Material manually, mixing in place with rotavator and compacting with the road roller at OMC to achieve the desired unconfined compressive strength and to from a layer of base. (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.), As per Direction by E/I. | 1,102 | Cum | 3,810 | ₹41,98,620 |
| 5 | Providing and applying Tack coat with Bitminous VG-10 using bitumen distributor at the rate of 0.35 Kg. per Sqm. on the prepared granular surface cleaned with Hydraulic broom as per Technical Specification. Clause 503, of MORD specification including cost of Bitumen as per direction of E/I. (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.), As per Direction by E/I. | 7,875 | Sqm | 29 | ₹2,28,375 |
| 6 | Providing,laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm. to 5.60 mm. aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN. static roller capacity, finished to required level and grades to be Seal coat as per Technical Specification. Clause 508, of MORD specification including cost of Bitumen as per direction of E/I. (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.), As per Direction by E/I. | - | Sqm | 230 | - |
| 7 | Providing,laying seal coat sealing the voids in a bitumenious surface laid to the specified levels, grade and cross fall using Type 'C' as per Technical Specification. Clause 510, of MORD specification including cost of Bitumen as per direction of E/I. (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.), As per Direction by E/I. | - | Sqm | 90 | - |
| 8 | Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8, fixing in position including painting and printing etc Ordinary Kilometer Stone (Precast) (Precast). (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.), As per Direction by E/I. | 3 | Nos | 2,600 | ₹7,800 |
| 9 | Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8, fixing in position including painting and printing etc 200 m stone (precast) (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.), As per Direction by E/I. | 10 | Nos | 720 | ₹7,200 |
| 10 | Part-B C.C. Work
Construction of Subgrade and Earthen Shoulders Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.), As per Direction by E/I. | 1,850 | Cum | 96 | ₹1,77,600 |
| 11 | Construction of Granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compaction with virbratory roller to achieve the desired density, complete as per clause 401, S.L.- 4-II, of MORD specification. (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.), As per Direction by E/I. | 121 | Cum | 2,900 | ₹3,50,900 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.98 MB
BOQ_2228445.xls
BOQ • 0.34 MB
4886SECorrigendum4.pdf
PDF • 0.37 MB
4886SECorrigendum3.pdf
PDF • 0.42 MB
4886SECorrigendum2.pdf
PDF • 1.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .