| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.4 LAccepted-Finance | L1 | Accepted-Finance Ok | |
| 2 | L2₹8.9 L+₹55,585.60 (6.65%)Accepted-Finance 46C 1P PONGHAT PUL DEFENCE INCLAVE COLONY BAMRAULI PRAYAGRAJ UTTAR PRADESH 211012 | PRAYAGRAJ | UTTAR PRADESH | 211012 | L2 | Accepted-Finance OK | |
| 3 | L3₹9.3 L+₹97,815.20 (11.7%)Accepted-Finance | L3 | Accepted-Finance Ok | |
| 4 | L4₹10.2 L+₹1.9 L (22.4%)Accepted-Finance | L4 | Accepted-Finance Ok |
Tender Value
Refer Docs
EMD Value
₹19,800
Closing Date
21 Sept 2021, 1:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE EnM HP I
DELHI JAL BOARD GOVT OF NCT OF DELHI OFFICE OF THE EXECUTIVE ENGINEER EnM HP I HAIDERPUR WATER WORKS DELHI 110085
Repairing Overhauling of 180 HP BHEL make motor at RWPH HPWWI
2021_DJB_208321_6
NIT No. 9
Open Tender
Miscellaneous Works
Works
60 days
Delhi
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
Delhi Jal Board
₹19,800
Yes
8 Oct 2021
14 Sept 2021
21 Sept 2021
14 Sept 2021
21 Sept 2021
14 Sept 2021
120 days
Stator (Sr. No. of Motor: 4000587-09:- Cutting the old Burnt winding strips. Providing & Fixing of new F class insulation. Rewinding of Stator winding with new electrolyte super enamelled copper wire. Making the connections, brazing the same with silver rod. Pocketing the connection with F class insulation. Replacement of stator winding fibre glass Teflon copper flexible leads. Varnishing the stator winding with Dr Beck varnish and backing the same.
Rotor (Sr. No. of Motor: 4000587-09 :- Cutting the old Burnt winding strips. Providing & Fixing of new F class insulation. Rewinding of Rotor winding with new electrolyte copper strips with fibre glass tape. Making the connections. P/Fixing new copper sockets both side, brazing the sockets with silver rod. Pocketing the sockets with F class insulation. Replacement of 3 Nos. Fibre glass Teflon copper flexible leads. Binding the rotor winding both side with HT steel wire & F class insulation. Varnishing the rotor winding with Dr Beck varnish and backing the same.
Dynamic Balancing of Rotor.
Providing and Fixing of both side bearing Make- FAG & Equivalent LRJ 41/2
Providing and Fixing of both side bearing Make- FAG & Equivalent MJ4E
Repairing of rotor shaft DE & NDE side, re-metaling the shaft turning and polishing the same as per bearing inner dia.
Repairing of Bearing end shield fixing MS sleeve, turning and polishing the same as per bearing outer dia.
Assembling commissioning and testing on load at site with both side cartage.
Stator (Sr. No. of Motor: 4000587-06:- Cutting the old Burnt winding strips. Providing & Fixing of new F class insulation. Rewinding of Stator winding with new electrolyte super enamelled copper wire. Making the connections, brazing the same with silver rod. Pocketing the connection with F class insulation. Replacement of stator winding fibre glass Teflon copper flexible leads. Varnishing the stator winding with Dr Beck varnish and backing the same.
Dynamic Balancing of Rotor.
Providing and Fixing of both side bearing Make- FAG & Equivalent LRJ 41/2
Providing and Fixing of both side bearing Make- FAG & Equivalent MJ4E
Repairing of rotor shaft DE & NDE side, re-metaling the shaft turning and polishing the same as per bearing inner dia.
Repairing of Bearing end shield fixing MS sleeve, turning and polishing the same as per bearing outer dia.
Assembling commissioning and testing on load at site with both side cartage.
Assembling commissioning and testing on load at site with both side cartage.
Stator (Sr. No. of Motor: 43062A402:- Cutting the old Burnt winding strips. Providing & Fixing of new F class insulation. Rewinding of Stator winding with new electrolyte super enamelled copper wire. Making the connections, brazing the same with silver rod. Pocketing the connection with F class insulation. Replacement of stator winding fibre glass Teflon copper flexible leads. Varnishing the stator winding with Dr Beck varnish and backing the same.
Dynamic Balancing of Rotor.
Providing and Fixing of both side bearing Make- FAG & Equivalent LRJ 41/2
Providing and Fixing of both side bearing Make- FAG & Equivalent MJ4E
Repairing of rotor shaft DE & NDE side, re-metaling the shaft turning and polishing the same as per bearing inner dia.
Repairing of Bearing end shield fixing MS sleeve, turning and polishing the same as per bearing outer dia.
NEW INDIA ELECTRICALS
Ojas Orientation Engineering
M K ENGINEERING
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .