Tender Value
₹12.8 L
EMD Value
₹25,500
Closing Date
14 Jul 2026, 2:00 pm5d left
AMA ZP KAUSHAMBI
ZP KAUSHAMBI
roop narayanpur goriyon mein sundar sahu ke ghar se kali mata sthan tak khadonja karya
2026_UPPRD_1166224_20
5882/E-TENDER/ZPK/2026-27 Date 03.07.2026
Open Tender
Civil Works
90 days
ZP KAUSHAMBI
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,505
Yes
AMA ZP KAUSHAMBI
₹25,500
Yes
ZP KAUSHAMBI
4 Jul 2026
4 Jul 2026
14 Jul 2026
4 Jul 2026
14 Jul 2026
4 Jul 2026
8 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5. | 540 | cum | 158.82 | ₹85,762.8 |
| 2 | Laying brick soling layer on prepared sub-grade with brick on edging according to lines, graded and cross-section shown on the drawing filling joints with sand and earth, spreading 25 mm thick layer of earth over brick soling, watering and rolliing as per Technical Specification Clause 412. | 1,980 | cum | 526.4 | ₹10,42,272 |
| 3 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5. | 150 | cum | 158.8 | ₹23,820 |
| 4 | Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of side | 6 | cum | 188 | ₹1,128 |
| 5 | Providing concrete for plain concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 (1:3:6) | 1.2 | cum | 5,999.34 | ₹7,199.21 |
| 6 | Filling in foundation trenches as per drawing & technical specification clause 305.3.9 | 1.8 | cum | 114.86 | ₹206.75 |
| 7 | Providing concrete for reinforced concrete in sub structure complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 M-25/M-20 | 5.94 | cum | 7,695.27 | ₹45,709.9 |
| 8 | Supplying, fitting, and placing M.S bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202. | 3.5 | cum | 7,835.67 | ₹27,424.85 |
| 9 | Supply of N.P. 3 hume pipe as per direction of E/I. | 22.5 | cum | 1,600 | ₹36,000 |
| 10 | Supply & Fixing Of Inauguration Stone | 1 | no | 5,000 | ₹5,000 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.47 MB
BOQ_2187574.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid