| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹88.4 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹89.8 L+₹1.4 L (1.63%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹97.0 L+₹8.6 L (9.71%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | L4₹1.0 Cr+₹14.1 L (16.0%)Admitted-Finance | L4 | Admitted-Finance | |
| 5 | L5₹1.1 Cr+₹20.2 L (22.8%)Admitted-Finance | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | CRESCENT ELECTRICAL ENGINEERS L5 | M/S L2 | M/S POWER STARS L4 | M/S NEW ALLIED L6 | MODI CONTRACTS LIMITED L7 | online engineers L3 | M/S Q POWER L1 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Disconnecting transformer from the circuitry by way of removing all connections, jumpers/droppers and connecting spare unit in the circuit | 6 | No | 80,000 ₹4,80,000 | 7,500 ₹45,000 | 15,000 ₹90,000 | 25,000 ₹1,50,000 | 10,000 ₹60,000 | 20,000 ₹1,20,000 | 6,000 ₹36,000 Lowest |
| 2.00 | Removing of cable connections for Transformer | 6 | No | 20,000 ₹1,20,000 | 8,000 ₹48,000 | 5,000 ₹30,000 | 20,000 ₹1,20,000 | 10,000 ₹60,000 | 20,000 ₹1,20,000 | 1,000 ₹6,000 Lowest |
| 3.00 | Removal/draining of old transformer oil from the transformer tank including shifting of drained oil barrels to divisional stores Bemina | 73,800 | Litres | 10 ₹7,38,000 | 11.65 ₹8,59,770 | 3 ₹2,21,400 | 5 ₹3,69,000 | 10 ₹7,38,000 | 1.15 ₹84,870 Lowest | 11 ₹8,11,800 |
| 4.00 | Removal /Cleaning the sludge from the transformer bottom portion including cleaning (hot bath), Inspection and testing of transformer including drying/replacement of silica gel,checking of buchholz relay, surge relay, conservator oil level indicator, temperature sensors, cooling system, measurement of IR value, other recommended tests as per SBD, and cleaning of Transformers comlete job. | 6 | No | 10,000 ₹60,000 Lowest | 11,000 ₹66,000 | 1,00,000 ₹6,00,000 | 50,000 ₹3,00,000 | 25,000 ₹1,50,000 | 1,25,000 ₹7,50,000 | 10,000 ₹60,000 Lowest |
| 5.00 | Erection of temporary shed for filtration of transformer oil | 6 | No | 5,000 ₹30,000 | 5,000 ₹30,000 | 5,000 ₹30,000 | 15,000 ₹90,000 | 35,000 ₹2,10,000 | 30,000 ₹1,80,000 | 4,000 ₹24,000 Lowest |
| 6.00 | Un loading of transformer oil and other T&P items manually at working site including carriage upto 30meters | 6 | No | 20,000 ₹1,20,000 | 4,500 ₹27,000 | 6,000 ₹36,000 | 10,000 ₹60,000 | 25,000 ₹1,50,000 | 40,000 ₹2,40,000 | 3,000 ₹18,000 Lowest |
| 7.00 | Providing and Replacement of damaged Gaskets | 6 | No | 500 ₹3,000 Lowest | 5,000 ₹30,000 | 10,000 ₹60,000 | 50,000 ₹3,00,000 | 1,00,000 ₹6,00,000 | 1,50,000 ₹9,00,000 | 15,000 ₹90,000 |
| 8.00 | Providing of fresh transformer Oil (12300x6) as per specifications mentioned in SBD | 73,800 | Litres | 125 ₹92,25,000 | 94 ₹69,37,200 | 120 ₹88,56,000 | 125 ₹92,25,000 | 135 ₹99,63,000 | 92.85 ₹68,52,330 Lowest | 93 ₹68,63,400 |
| 9.00 | Providing and fixing of Breathers with silca gel for 25 MVA single phase transformer | 7 | No | 200 ₹1,400 Lowest | 9,500 ₹66,500 | 10,000 ₹70,000 | 15,000 ₹1,05,000 | 5,000 ₹35,000 | 20,000 ₹1,40,000 | 5,000 ₹35,000 |
| 10.00 | Refilling of the fresh transformer oil including Dehydration /filtration of transformers as required to get good insulation resistance of the transformer winding and good BDV of the oil including connecting back the unit in the circuit by re connecting all jumpers/ connectors and cable connections with final erection check complete job | 73,800 | Litres | 1 ₹73,800 Lowest | 11.65 ₹8,59,770 | 3.5 ₹2,58,300 | 10 ₹7,38,000 | 10 ₹7,38,000 | 1.5 ₹1,10,700 | 12 ₹8,85,600 |
Tender Value
₹1.0 Cr
Closing Date
2 Feb 2021, 4:00 pmClosed
Executive Engineer TLMD -8, JKPTCL
Bemina Srinagar JK
Overhauling/ De-Sludging of 6 No., 25MVA, 132/33kV Single Phase Power Transformers (BHEL Make) including replacement of Oil, Filtration/ Dehydration etc at Grid Station Wanganpora
2021_PDD_113976_1
TLMD-VIII/ TS/04 of 2021 Dated 16-01-2021
Open Tender
Electrical and Maintenance Works
Lump-sum
122 days
kashmir
Please refer Tender documents.
5 documents required · 5 mandatory
₹2,000
Yes
Executive Engineer, TLMD-VIII Srinagar
Exempted
27 Feb 2021
18 Jan 2021
3 Feb 2021
18 Jan 2021
2 Feb 2021
18 Jan 2021
Amount
Disconnecting transformer from the circuitry by way of removing all connections, jumpers/droppers and connecting spare unit in the circuit
Removing of cable connections for Transformer
Removal/draining of old transformer oil from the transformer tank including shifting of drained oil barrels to divisional stores Bemina
Removal /Cleaning the sludge from the transformer bottom portion including cleaning (hot bath), Inspection and testing of transformer including drying/replacement of silica gel,checking of buchholz relay, surge relay, conservator oil level indicator, temperature sensors, cooling system, measurement of IR value, other recommended tests as per SBD, and cleaning of Transformers comlete job.
Erection of temporary shed for filtration of transformer oil
Un loading of transformer oil and other T&P items manually at working site including carriage upto 30meters
Providing and Replacement of damaged Gaskets
Providing of fresh transformer Oil (12300x6) as per specifications mentioned in SBD
Providing and fixing of Breathers with silca gel for 25 MVA single phase transformer
Refilling of the fresh transformer oil including Dehydration /filtration of transformers as required to get good insulation resistance of the transformer winding and good BDV of the oil including connecting back the unit in the circuit by re connecting all jumpers/ connectors and cable connections with final erection check complete job
Painting of Transformer as per requirement
online engineers
M/S POWER STARS
CRESCENT ELECTRICAL ENGINEERS
M/S NEW ALLIED
MODI CONTRACTS LIMITED
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.17 MB
SBDNEW.pdf
Tender Documents • 0.79 MB
BOQ_217946.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .