Loading…
Loading…
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹84.6 Laccepted-aoc | ₹84.6 L | accepted-aoc |
Tender Value
₹80.6 L
EMD Value
₹1.6 L
Closing Date
20 Jan 2026, 11:00 pmClosed
Minor Irrigation Department
IMPROVEMENTS TO TANK BUND WASTE WEIR AND DRAFT CHANNEL OF KURUBARA HUNDI TANK IN GUNDLUPET TALUK CHAMARAJANAGARA DISTRICT
MI/2025-26/OW/WORK_INDENT10115
MI/2025-26/OW/WORK_INDENT10115
Open
Other Works
Minor Irrigation Division Mysore
8 documents required · 8 mandatory
Minimum financial turnover (civil engineering construction works) not less than two times the annual payments from this contract (Rs. xxxxx Lakhs)
Satisfactoriy completed (atleast 90%) as prime contractor at-least one such similar work of value not less than Rs. xxxxxxx (80% of estimated cost of tender)
Executed in any one year the following minimum quantities of work (Cement Concrete - xxxx cum, Earthwork - xxxx cum, etc) (80% of peak rate of construction)
Tenderer or his identified Sub Contractor should possess valid Electrical License for executing building electrificatio works and should have executed similar electrical works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one year
Tenderer or his identified Sub Contractor should possess valid license for executing water supply / sanitary engineering works and should have executed similar works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one year
Owning the following key and critical equipment for this work (xxxx, xxxx, xxxx)
Liquid assets and /or availability of credit facilities of no less than Rs. xxxxxx Lakhs (estimated cash flow for 3 months of peak construction period)
Total value of civl engineering works executed and payments received in the last five years (year-wise)
List of existing commitments and ongoing works
List of works for which tenders already submitted
Banker Details for reference
c)Executed in any one year (for a continuous period of 12 months) the minimum quantities of work (usually 80% of annual requirement) for works costing up to Rs.100.00 lakhs De-Silting, Earth Work Excavation and Embankment (Combined Quantity) 9185.00 Cum - Cement Concrete (Both PCC and RCC) 507.00 Cum - Reinforcement Steel 18.082 Tonne - Stone pitching / revetment 234.00 Sqm
b)Satisfactorily completed (at least 90% of the contract value), as prime contractor, for at least One Similar work such as CONSTRUCTION / IMPROVEMENTS / REPAIRS TO TANKS of value 40.32 Lakhs. Financial turnover and cost of completed works of previous years shall be given weightage of 10% per year based on the rupee value to bring them to 2025-26 price levelII
b)Liquid assets and /or availability of credit facilities of not less than Rs 24.19 Lakhs (Credit lines/ letter of credit/ certificates from banks for meeting the fund requirement etc.
3.2To qualify for award of this contract, each Tenderer in its name should have in the last five years i.e. 2020-21 , 2021-22, 2022-23, 2023-24 and 2024-25 (a)achieved in at least two financial years an average annual financial turnover (in all classes of civil engineering construction works only) of Rs 80.64 Lakhs. (Usually not less than the estimated annual payments under this contract for works costing upto Rs.100.00 lakhs) ALONG WITH UDI NUMBER
₹2,020
₹1.6 L
20 Jan 2026
9 Jan 2026
22 Jan 2026
19 Jan 2026
IMPROVEMENTS TO TANK BUN, WASTE WEIR AND DRAFT CHANNEL OF KURUBARA HUNDI TANK IN GUNDLUPET TALUK CHAMARAJANAGARA DISTRICT
Cutting and removing jauliflora bushes upto 1.50 m girth excluding removal of stumps and including burning or disposing off the materials as directed with all other ancillary operations complete with ...
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable ...
De-silting of Feeder Channel/Canal in dry condition by excavating the deposited bed material and loading the same to transport vehicle ( excluding cost of transportation ) including cost of all machin...
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution li...
Providing rubble stone/boulder filling between or behind abutment below apron including cost of all materials, labour, hand packing, finishing top surface & all necessary works as directed and complet...
Providing and laying in-situ vibrated M-15 grade cement concrete using 40 mm down approved, clean, hard, graded aggregates for plain concrete works including cost of all materials, machinery, labour, ...
Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates as per r...
Steel Fabrication - Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/...
Providing impervious filling adjacent to masonry / concrete structure and filling trial pits with soil available in adjacent area in layers of 100 to 150 mm and compacting each layer to density contro...
Providing new embankment abutting to existing bund to strength the existing bund using soil from approved borrow area in layers of 200 to 250 mm and compacting each layer to density control of not les...
Reinforced cement concrete M15 grade boundary pillars of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting complete with all lead and lift, load...
Floor painting with floor enamel paint of approved brand and manufacture of required colour to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust,...
Compacting original ground supporting embankment - Loosening, leveling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth o...
Providing and constructing 450 mm thick hand packed rough stone revetment consisting of 300 mm thick rough stones with 400 to 450 mm long through stones at 1.5 m c / c over a backing of 150 mm thick ...
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
KURUBARA HUNDI TANK DRAWINGS.docx
Others - DRAWINGS • 0.37 MB
KURUBARAHUNDI DTS REVISED.docx
Tender Document • 1.71 MB
Download all tender documents and submit your bid