Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.6 LAccepted-AOC H NO 1366 3 GALI NO 6 MATA ROAD NEAR HAPPY MODEL SCHOOL RAJIV NAGAR GURGAON 122 001 HARYANA | GURGAON | GURGAON | HARYANA | 122001 | L1 | Accepted-AOC Accept for lowest bid quoted | |
| 2 | L2₹25.7 L+₹92,597.50 (3.73%)Rejected-Finance 30 B 1 DEEN DAYAL NAGAR NAWABGANJ DEEN DAYAL NAGAR KANPUR NAGAR UTTAR PRADESH 208002 | KANPUR NAGAR | UTTAR PRADESH | 208002 | L2 | Rejected-Finance Highest bid quoted | |
| 3 | L3₹28.8 L+₹4.0 L (16.0%)Rejected-Finance NIVADA TIVAYA ROAD TIVYA MUST BUS STOP VILLAGE KHATAULI SAHARANPUR UP 247001 | SAHARANPUR | SAHARANPUR | UP | 247001 | L3 | Rejected-Finance Highest bid quoted | |
| 4 | L4₹31.6 L+₹6.8 L (27.4%)Rejected-Finance | L4 | Rejected-Finance Highest bid quoted | |
| 5 | L5₹33.2 L+₹8.4 L (33.9%)Rejected-Finance | L5 | Rejected-Finance Highest bid quoted |
Tender Value
₹49.8 L
Closing Date
18 Feb 2023, 6:00 pmClosed
GE (AF) Gurgaon
GE (AF) Gurgaon
REPAIR MAINTENANCE OF EXTERNAL PLASTER PERODICAL AND OTHER ASSOCIATED WORK AT WAPTI AREA AT AFSSR GURGAON UNDER GE (AF) GURGAON
2023_MES_576280_1
GE/GUR-/NIT-61/2022-23
Open Tender
Civil Works
Piece-work
240 days
GE (AF) Gurgaon
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
GE (AF) Gurgaon
Exempted
3 Mar 2023
20 Jan 2023
20 Feb 2023
20 Jan 2023
18 Feb 2023
4 Feb 2023
Amount
Taking down cement plaster of any description on brick walls, etc including raking out joints, hacking for key scrubbing down with water etc. complete all as specified and as directed by Engr-in-charge.
M&L for Rendering (External) 15mm thick in Cement Mortar 1:4 on Brick Walls or on Concrete Surfaces, mixing WPC as per manufacturers instructions, Plastered Surfaces finished Fair and Even, complete all as specified and as directed by Engr-in-charge. NOTE: WPC will be Measured and Paid under appropriate Item. Area includes in this items upto G+3 stories of building. scaffolding and other arrangement to be done by contractor, nothing extra shall be paid to contractor.
Supply only integral water proofing compound complete all as specified and as directed by Engr-in-charge.
M&L for rendering 15 mm thick on brick work or concrete surfaces on walls in Cement Mortar 1:6 finishing even and smooth without using extra cement complete all as specified and as directed by Engr-in-charge. NOTE: Area includes in this items upto G+3 stories of building. scaffolding and other arrangement to be done by contractor, nothing extra shall be paid to contractor.
M&L for rendering 5 mm thick on fair faces of brick work or concrete surfaces on ceiling/ struts in patches in Cement Mortar 1:3. finishing even and smooth without using extra cement complete all as specified and as directed by Engr-in-charge. NOTE: Area includes in this items upto G+3 stories of building. scaffolding and other arrangement to be done by contractor, nothing extra shall be paid to contractor.
M&L for Rough Cast Plaster on Brick Walls consisting Under Coat of Cement and Sand Mortar 1:3 not less than 10mm thick and while it is still in Plastic state the Rough Cast Mixture consisting of Crushed Stone or Fine Gravel mixed of size 6mm with Coarse Sand and Cement in the ratio 1:1:1 shall be applied and finish Even, complete all as specified and as directed by Engr-in-charge.
M&L for preparing newly Rough Cast plastered surfaces of Walls and applying Two Coats of acrylic Weather Coat Exterior Paint with approved Tint over a coat of Primer (as per Manufacturer's instructions), complete all as specified and as directed by Engr-in-charge.
M&L for complete removal of existing treatment by scrapping with mechenical wall sander (having mechenical vaccume machinism) having RPM not less than 1500, sand pad of 80 Grit having Dia of 7"/9" to make the surface free from dust, loose paint etc, by skilled labour complete all as directed. NOTE: Area includes in this items upto G+3stories of building. scaffolding and other arrangement to be done by contractor, nothing extra shall be paid to contractor.
M&L for 1-2mm thick white cement base wall care putty (Multi purpose mixer shall be used for uniform & proper mixing of wall care putty) and making the surface smooth etc, complete all as specified and as directed by Engr-in-charge. NOTE: Area includes in this items upto G+3 stories of building. scaffolding and other arrangement to be done by contractor, nothing extra shall be paid to contractor.
M&L for preparing old / New putty surfaces of Walls for Finishing with Acrylic Smooth exterior weather coat paint of required shade upto two storey of Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm by using Airless spray technology with max working pressure of 3300 PPSI and capable of operating single spray gun with a max material hose length of 30 mtr the spray machine of reputed manufacturer with pro guard technology and capability of tracking pressure and paint usage and certified by paint manufacturer and as mentioned in PS and accessories for applying Paint shall be able to spray in hard to reach areas and penetration of paint on the surface to achieve excellent application using limited manpower complete all as specified and as directed by Engr-in-charge. Note: Area includes in this items upto G+3 stories of building. scaffolding and other arrangement to be done by contractor, nothing extra shall be paid to contractor.
M&L for preparation of old plaster surface of walls and applying two coats of white wash complete all as specified and as directed by Engr-in-charge. Note : Area includes in this items upto G+3 stories of building. scaffolding and other arrangement to be done by contractor, nothing extra shall be paid to contractor.
M&L for One coats of white wash on old plaster surface of ceiling including prepration of surface complete all as specified and as directed by Engr-in-charge. NOTE: Area includes in this items upto G+3 stories of building. scaffolding and other arrangement to be done by contractor, nothing extra shall be paid to contractor.
M&L for Three coats of white wash on New plaster surface of ceiling including prepration of surface complete all as specified and as directed by Engr-in-charge. NOTE: Area includes in this items upto G+3 stories of building. scaffolding and other arrangement to be done by contractor, nothing extra shall be paid to contractor.
Taking down cast iron soil waste and vent pipes of any description with fitting and making good to disterbed surfaces complete all as specified and as directed by Engr-in-charge.
S&F 110mm bore PVC (SWR) pipes single socketed in any length with rubber ring joints laid in floors/fixed to wall complete all as specified and as directed.
S&F 110mm bore PVC (SWR) bends any radius complete all as specified and as directed.
S&F 110mm bore PVC (SWR) junction single, (Single T) Equal or unequal complete all as specified and as directed.
S&F 75mm bore PVC (SWR) pipes single socketed in any length with rubber ring joints laid in floors/fixed to wall complete all as specified and as directed.
S&F 75mm bore PVC (SWR) bends any radius complete all as specified and as directed.
S&F 75mm bore PVC (SWR) junction single, (Single T) Equal or unequal complete all as specified and as directed.
Demolition of brickwork, built in cement mortar including all quoins, arches, pillars, etc. complete all as specified and directed
M&L for brick masonry with sub class 'B', old size bricks straight or curved on plan exceeding 6m mean radius, built in Cement Mortar (1:4) complete all as specified and as directed.
Notes for all items (i) Removal of plants/trees/Shrubs from roof tops/sides, external walls of bldg, chajjas, wall junctions, junctions of rain water/CI soil/waste pipe junctions including taking out the roots entered in wall/slab surfaces and making good the disturbed surfaced using PCC (1:2:4) type B-0 or cement mortar (1:2) including repairing the GI/CI/PVc pipe joints which were damged during cutting/taking out process and cost of same shall deemed to be included in quoted rates of external periodical items. (ii) The debris including vegetation plant/trees shall be disposed off to a distance exc 0.5 Km and n.exe 1.00 K m all as directed by engineer -in charge. (iiI) For deciding the girth of the plant/tree the height shall be taken at 30 cm above the slab/wall.
(iv) The labour employed by the contractor for carrying out the work shall be provided with safety equipment and quoted shall be deemed to include the same. (v) All windows, joineries, mirrors, fittings, doors etc. shall be covered before painting the surfaces and the same shall be cleaned including cleaning of floors as directed by the Engineer-in-Charge, failing which a recovery shall be done from the RAR as decided by Garrison Engineer and the quoted rate is deemed inlusive of these provisions. (vi) Contractor shall store the entire quantity of all type of paints drums in site store with double lock system and key of one lock with contractor and key of second lock with Deptt rep and daily use quantities will be issued to working labour by both parties and daily consumption shall be recorded in proper register duly signed by both parties. (vii) Item Nos 7 to 10 shall be executed by authorised applicators/painters trend by paint manufacturer and contractor shall furnish the certificate of same to the deptt before commancement of work.
M/S ASHISH AND CO
Chaudhary Constructions
k k enterprises
M/S GEETANJALI ENTERPRISES
M/s Pawar Builders
Orbital Infra Power
P R Constructions
stage.html
html • 0.07 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .