| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.5 LAccepted-AOC | ₹10.5 L | L1 | Accepted-AOC L1 Accepted |
| 2 | L2₹10.6 LRejected-AOC | ₹10.6 L | L2 | Rejected-AOC L2 Rejected |
| Sl No | Description | Qty | Unit | PARAMOUNT ENGINEERING ENTERPRISES L2 | SRIDHARAN L1 |
|---|---|---|---|---|---|
| 1.00Construction of Drain with Culvert in Royal Avenue from Jaya maligai Shop to way to CSC @ Myleripalayam H/o, Myleripalayam Panchayat. | |||||
| 2.00 | Earth work excavation and depositing on bank with in initial lead of 10 mt and initial lift of 2mt in Hard Gravelly soil for foundation as per specification SS 20 B | 133.2 | Cum | 270 ₹35,964 | 263 ₹35,031.6 |
| 3.00 | Cement Concrete 1:4:8 mix using 40 mm ISS H.B.G. metal including cost and conveyence of all materials to site and all other albour charges etc., completed. | 22.2 | Cum | 5,350 ₹1,18,770 | 5,312 ₹1,17,926.4 |
| 4.00 | Supplying & Erecting centering for sides & soffits including necessary supports & strutting for plane surface in all cross bracings etc., | 436.08 | Sqm | 550 ₹2,39,844 | 547.5 ₹2,38,753.8 |
| 5.00 | Cement Concrete 1:3:6 mix using 40 mm ISS H.B.G. metal including cost and conveyence of all materials to site and all other albour charges etc., completed. | 62 | Cum | 5,700 ₹3,53,400 | 5,587.5 ₹3,46,425 |
| 6.00 | Plastering with cement mortar 1:4mix to 20 mm thick includingcost and conveyance of all materials to site and all labour charges etc., completed. | 84 | Sqm | 600 ₹50,400 | 588 ₹49,392 |
| 7.00 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire) | 0.5 | MT | 92,000 ₹46,368 | 91,951 ₹46,343.3 |
| 8.00 | Cement Concrete 1:1.5:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers | 5.6 | Cum | 9,200 ₹51,520 | 9,059 ₹50,730.4 |
| 9.00 | Provision for Name board charges | 1 | No | 4,500 ₹4,500 | 4,500 ₹4,500 |
| 10.00 | Provision for Photo charges | 1 | No | 1,62,138 ₹1,62,138 | 1,60,038 ₹1,60,038 |
Tender Value
₹10.6 L
EMD Value
₹10,590
Closing Date
4 Feb 2026, 3:00 pmClosed
Special Officer/BDO(VP), Madukkarai
Block Development Officer (VP), Palakkadu Main Road, Madukkarai -641105
Construction of Drain with Culvert in Royal Avenue from Jaya Maligai Shop to Way to CSC at Myleripalayam H.o.Myleripalayam Panchayat
2026_RDTN_647753_1
Roc.No.38/2026 Date.23.01.2026 Mines and Minerals (PKG-1)
Open Tender
Civil Works
Madukkarai
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹10,590
Yes
9 May 2026
28 Jan 2026
4 Feb 2026
28 Jan 2026
4 Feb 2026
28 Jan 2026
Construction of Drain with Culvert in Royal Avenue from Jaya maligai Shop to way to CSC @ Myleripalayam H/o, Myleripalayam Panchayat.
Earth work excavation and depositing on bank with in initial lead of 10 mt and initial lift of 2mt in Hard Gravelly soil for foundation as per specification SS 20 B
Cement Concrete 1:4:8 mix using 40 mm ISS H.B.G. metal including cost and conveyence of all materials to site and all other albour charges etc., completed.
Supplying & Erecting centering for sides & soffits including necessary supports & strutting for plane surface in all cross bracings etc.,
Cement Concrete 1:3:6 mix using 40 mm ISS H.B.G. metal including cost and conveyence of all materials to site and all other albour charges etc., completed.
Plastering with cement mortar 1:4mix to 20 mm thick includingcost and conveyance of all materials to site and all labour charges etc., completed.
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire)
Cement Concrete 1:1.5:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers
Provision for Name board charges
Provision for Photo charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.70 MB
technicalbid1059000.pdf
Tender Documents • 0.83 MB
pricebid1059000.pdf
Tender Documents • 0.89 MB
BOQ_776555.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid