Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.3 CrAdmitted-Finance | -18.70% | ₹1.3 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.3 Cr+₹2.7 L (2.09%)Admitted-Finance | -17.00% | ₹1.3 Cr+₹2.7 L (2.09%) | L2 | Admitted-Finance |
| 3 | L3₹1.3 Cr+₹4.7 L (3.60%)Admitted-Finance | -15.77% | ₹1.3 Cr+₹4.7 L (3.60%) | L3 | Admitted-Finance |
| 4 | L4₹1.3 Cr+₹4.9 L (3.80%)Admitted-Finance | -15.61% | ₹1.3 Cr+₹4.9 L (3.80%) | L4 | Admitted-Finance |
| 5 | L5₹1.4 Cr+₹5.9 L (4.51%)Admitted-Finance | -15.03% | ₹1.4 Cr+₹5.9 L (4.51%) | L5 | Admitted-Finance |
Tender Value
₹1.9 Cr
EMD Value
₹3.8 L
Closing Date
7 Sept 2026, 6:00 pmClosed
AS PER NIT AND TENDER DOCUMENT
AS PER NIT AND TENDER DOCUMENT
Construction of New SDO Office Building at Uchchain
2026_CEPWD_593954_1
NIT NO 02/2026-27 SE PWD CIRCLE BHARATPUR
Open Tender
Civil Works - Buildings
Percentage
270 days
AS PER NIT AND TENDER DOCUMENT
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,000
AS PER NIT AND TENDER DOCUMENT
₹3.8 L
Yes
18 Sept 2026
2 Sept 2026
8 Sept 2026
2 Sept 2026
7 Sept 2026
2 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1PART "A" : Building Work | |||||
| 1.01 | Surface dressing of the ground including removing vegetation and inequalities not exceeding 15cm deep and disposal of rubbish lead up to 50 Mtr. and lift up to 1.5 Mtr.: All kinds of soil | 222.68 | Sqm | 9 | ₹2,004.12 |
| 1.02 | Earth work in excavation by mechanical means (Hydraulic Excavator)/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including taking out the excavated soil and depositing and refilling of jhiri with watering & ramming and disposal of surplus excavated soil as directed with in a lead of 50 meter.
All kinds of soils | 636.4 | Cum | 178 | ₹1,13,279.2 |
| 1.03 | Providing and laying in position cement concrete including curing compaction etc. of specified grade excluding the cost of centering and shuttering =All up to plinth leve 1:4:8 (1Cement :4 Course Sand :8 Graded stone aggregate 40 mm nominal size | 217.94 | Cum | 3,962 | ₹8,63,478.28 |
| 1.04 | Providing and laying in position specified grade of reinforced cement concrete including curing compaction finishing with rendering in cement sand mortar 1:3 (1-Cement:3-coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. All work up to plinth level :1:1:2 (1-Cement:1-Coarse sand:2-graded stone aggregate 20 mm nominal size). | 9.55 | Cum | 5,921 | ₹56,545.55 |
| 1.05 | Add extra for M-25 | 9.55 | Cum | 76 | ₹725.8 |
| 1.06 | Providing and laying in position specified grade of reinforced cement concrete including curing compaction finishing with rendering in cement sand mortar 1:3 (1-Cement:3-coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. All work up to plinth level :1:1.5:3 (1-Cement:1.5Coarse sand:3-graded stone aggregate 20 mm nominal size). | 115.73 | Cum | 5,921 | ₹6,85,237.33 |
| 1.07 | Random Rubble stone masonary for foundation and plinth in Cement Sand Mortar above 30 Cm. thick wall in :Cement Mortar 1:6 (1-Cement:6-Sand). | 220 | Cum | 3,406 | ₹7,49,320 |
| 1.08 | Centering and Shuttering with plywood or steel sheets including strutting, propping bracing both ways and removal of formwork for foundation , footings, strap beam, raft , bases of columns etc. | 311.34 | Sqm | 173 | ₹53,861.82 |
| 1.09 | Centering & shuttering with plywood or steel sheets including strutting, propping bracing both ways with steel props and removal of formwork for upto floor five level for : | - | - | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.40 MB
NitConditionALLbuildingANDroad_11zon.pdf
Tender Documents • 13.80 MB
BOQ_1054144.xls
BOQ • 0.46 MB
CONDITION.pdf
PDF • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .