Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹7.2 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹7.4 L+₹21,476.79 (3.00%)Admitted-Finance TAHAMPUR UTTAR PRADESH | AYODHYA | UTTAR PRADESH | 224001 | L2 | Admitted-Finance |
Tender Value
₹7.5 L
EMD Value
₹76,000
Closing Date
1 Jun 2026, 11:00 amClosed
Executive Engineer Minor Irrigation Division Mzp
Executive Engineer Minor Irrigation Division Tanda Fall Road Tedawa Amoi Mirzapur
Construction of Anicut in Dubara Pahadi
2026_UPMID_1149654_17
133/M.I./JE T/E-Tender/2026-27 Date 08-05-2026
Open Tender
Civil Works
Percentage
90 days
Vill- Dubara pahadi Block-City Mirzapur
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,177
Executive Engineer Minor Irrigation Division
₹76,000
Yes
30 Sept 2026
19 May 2026
1 Jun 2026
19 May 2026
1 Jun 2026
19 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of Anicut | - | - | - | - |
| 2 | E/W excavation in foundation in ordinary soil/sand loam clay or sand including lift upto 1.50 M and lead up to 30 m as directed by Engineer-in-charge | 806.6 | Cum | 94 | ₹75,820.4 |
| 3 | Removal of slush from nala bed before excavation s.soil incl all | 9.12 | Cum | 114 | ₹1,039.68 |
| 4 | Excavation in foundation in ordinary soil/sand loam clay or sand including all as directed by Engineer-in-charge | 90.33 | Cum | 125 | ₹11,291.25 |
| 5 | P.C.C Work in 1:3:6 Cement, Sand & 20-40mm Stone ballast i/c cost of material labour etc as per required | 39.26 | Cum | 5,123 | ₹2,01,128.98 |
| 6 | R.C,R Stone Massonary work in 1:4 Cement,Sand and mortor with stone Khanda i/c cost of material labour etc as per required for proper completion of the work in foundation | 66.22 | Cum | 4,758 | ₹3,15,074.76 |
| 7 | P:C:C work 1:2:4 Cement,sand,12.50-20.00mm stone grit i/c cost of material labour etc as per required | 12.24 | Cum | 7,456 | ₹91,261.44 |
| 8 | Plaster work 1:3 Cement,sand mortar on stone masonary i/c cost of material labour etc required for proper completion of work. | 11.91 | Cum | 218 | ₹2,596.38 |
| 9 | Raised Pointing work 1:2 Cement,sand mortar on stone masonary i/c cost of material labour etc required for proper completion of work. | 35.33 | Cum | 137 | ₹4,840.21 |
| 10 | Laying of Stone boulder (20-60) Kg in Filter | 3.87 | Cum | 1,749 | ₹6,768.63 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.83 MB
BOQ_2152949.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .