Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹16.6 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹18.0 L+₹1.4 L (8.37%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹18.5 L+₹1.9 L (11.6%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹19.2 L+₹2.6 L (15.7%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance | ||
| 5 | L5₹19.3 L+₹2.7 L (16.4%)Admitted-Fee/PreQual/Technical/Finance | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹24.7 L
EMD Value
₹49,348
Closing Date
21 Sept 2026, 4:00 pmClosed
EXECUTIVE ENGINEER REW BANDIPORA
EXECUTIVE ENGINEER REW BANDIPORA
DEVELOPMENT OF CRICKET GROUND AT SHILVAT
2026_RDPR_324744_18
NIT92
Open Tender
Civil Works
Percentage
EXECUTIVE ENGINEER REW BANDIPORA
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,200
Rural Development and Panchayati Raj
₹49,348
8 Oct 2026
16 Sept 2026
22 Sept 2026
16 Sept 2026
21 Sept 2026
16 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing and laying in position plain cement concrete 1:3:6 mix ratio M10 using 40 mm nominal size agg excluding cost of shuttering i/c curing( all works upto lintel level) | 16.2 | cum | 5,733 | ₹92,874.6 |
| - | FormWork/ Shuttering i/c propping, centering and removal. Complete job. | 90 | sqm | 286 | ₹25,740 |
| - | Providing and Fixing of MS steel Hollow section Grill with Vertical rectangular Hollow posts , including primer coat. | 12,500 | kgs | 138 | ₹17,25,000 |
| 4 | providing and applying synthetic epoxy paint on steel section. | 450 | sqm | 130 | ₹58,500 |
| 5 | providing and fixing of Cricket practice Net made of Nylon heavy duty | 450 | sqm | 30 | ₹13,500 |
| 7 | B- CRICKET PITCH. Earthwork in excavation by manual means in trenches for foundation drains/pipes including backfilling and disposal of excavated soil. | 36.95 | cum | 479.85 | ₹17,730.46 |
| 8 | Consolidation of pitch base to required gradient and cross-section using PRR of 8–10 t. | 82.14 | sqm | 4.5 | ₹369.63 |
| 9 | providing and laying Stone soling in trenches, hand packed, 100 mm including consolidation by ramming. | 12.33 | cum | 1,204 | ₹14,845.32 |
| 10 | supply and laying Coarse sand layer including sieving and flooding with water, not exceeding in leyars 50mm in depth.. including carriage. | 8.22 | cum | 3,150 | ₹25,893 |
| 11 | supply and laying Sandy loam (fine sand + fine clay) in 1:10 ratio compacted in layers not exceeding 50mm in depth to be consolidated with1/2 Ton RR or plate vibrator. | 12.33 | cum | 2,500 | ₹30,825 |
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.39 MB
BOQ_1095789.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .