| 1 | L1₹7.1 CrAccepted-AOC NO 5 25A NADUMEDU PILLUR POST PARAMATHI VELUR TALUK NAMAKKAL DISTRICT 637206 | NAMAKKAL | TAMIL NADU | 637206 | ₹7.1 Cr | L1 | Accepted-AOC Lowest bidder |
| 2 | L2₹7.3 CrRejected-AOC | ₹7.3 Cr | L2 | Rejected-AOC Other than lowest bidder |
| 3 | L3₹7.8 CrRejected-AOC NO 5 MOOGAMBIGAI NAGAR MANOJIPATTI ROAD M C POST THANJAVUR 613004 | THANJAVUR | TAMIL NADU | 613004 | ₹7.8 Cr | L3 | Rejected-AOC Highest bidder |
| Sl No | Description | Qty | Unit | SARAVANA ASSOCIATES L3 | sivaparameswari engineering construction and co L1 | PUSHPA GUNASHEKAREN L2 |
|---|---|---|---|---|---|---|
| 1.00Providing two legged scaffolding using 48.30mm dia heavy duty MS pipe over all height of 3.00m the distance between 2 legs being 1.25m and the spacing of the post being 2m in each rows and providing platform with C.W. planks using 40mm thick silver oak and 1.00m wide in complete form with horizontal bracings @ 1.50m c/c vertical direction and with cross bracings using same 48.30mm dia including cutting, threading assembly with red oxide primer, labour charges cost of specials such on large plate, shoe, carcher, coupling, bolt and nut transportation charges. The bottom of vertical post shall rest on 300x300x70mm 1:2:4 concrete base etc complete complying with standard specification and as directed by the departmental officers. | ||||||
| 1.01 | For Initial height of 3m | 1,175 | Rm | 870 ₹12.1 L | 790 ₹11.0 L | 800 ₹11.1 L |
| 1.02 | For every additional 2.5m height | 270 | Rm | 750 ₹2.4 L | 680 ₹2.2 L | 690 ₹2.2 L |
| 2.00 | Dismantling clearing away the damaged Sheet Roofing over Pan Tiles without roof timbers and carefully stacking materials useful for reuse etc,as directed by the departmental officers as per standard specification | 1,533 | Sq.m | 50 ₹90,447 | 45 ₹81,402.30 | 45 ₹81,402.30 |
| 3.00 | Dismantling and clearing away carefully and stacking materials useful for reuse the cracked/ dislodged brick wall of the building and to dispose debris etc complete complying with standard specification and as directed by the departmental officers. | 49 | Cu.m | 380 ₹21,971.60 | 350 ₹20,237 | 355 ₹20,526.10 |
| 4.00 | Dismantling clearing away the DOORS AND WINDOWS including removal of frames,hinges and fastening etc., complete complying as directed by the departmental officers as per standard specification. | 106 | Cu.m | 220 ₹27,517.60 | 200 ₹25,016 | 200 ₹25,016 |
| 5.00 | Dismantling of damaged and undulated flooring and conveying debries from all floors to ground level outside the mahal etc., complete complying with standard specification and as directed by the departmental officers. | 888 | Sq.m | 500 ₹5.2 L | 450 ₹4.7 L | 460 ₹4.8 L |
| 6.00 | Dismantling of brick jelly lime concrete flooring of any thickness and conveying by dolly and stacking the useful stone for reuse etc., | 90 | Cu.m | 390 ₹41,418 | 350 ₹37,170 | 355 ₹37,701 |
| 7.00 | Removal of the existing detoriated lime plastering over the wall, arches, domes and special type of ceiling of Madras terraced type roof carefully without disturbing or damaging the rafters, etc., complete complying with standard specification and as directed by the departmental officers. | 1,968 | Sq.m | 600 ₹13.9 L | 550 ₹12.8 L | 555 ₹12.9 L |
| 8.00 | Laying Brick jelly lime concrete in lime mortar 1:2 ( One lime and two brick jelly ) (no sand to be added) using 20 mm gauge brick jelly for foundation, flooring including dewatering wherever necessary and laid in layers well rammed, consolidated etc., complete complying with standard specification and as directed by the departmental officers. | 90 | Cu.m | 12,800 ₹13.6 L | 11,800 ₹12.5 L | 11,900 ₹12.6 L |
Tender Value
₹7.2 Cr
EMD Value
₹7.2 L
Closing Date
20 Feb 2026, 3:00 pmClosed
Superintending Engineer
Superintending Engineer, PWD, Heritage Buildings Circle, Chennai - 5.
CONSERVATION AND RESTORATION OF RACE COURSE HERITAGE BUILDING AT UDHAGAMANDALAM IN NILGIRIS DISTRICT.
2026_PWD_659796_1
96/HBC/2025-26
Open Tender
Civil Works - Buildings
365 days
Ooty
Please refer Tender documents.
11 documents required · 11 mandatory
₹0
₹7.2 L
8 Mar 2026
18 Feb 2026
20 Feb 2026
18 Feb 2026
20 Feb 2026
18 Feb 2026
Providing two legged scaffolding using 48.30mm dia heavy duty MS pipe over all height of 3.00m the distance between 2 legs being 1.25m and the spacing of the post being 2m in each rows and providing platform with C.W. planks using 40mm thick silver oak and 1.00m wide in complete form with horizontal bracings @ 1.50m c/c vertical direction and with cross bracings using same 48.30mm dia including cutting, threading assembly with red oxide primer, labour charges cost of specials such on large plate, shoe, carcher, coupling, bolt and nut transportation charges. The bottom of vertical post shall rest on 300x300x70mm 1:2:4 concrete base etc complete complying with standard specification and as directed by the departmental officers.
For Initial height of 3m
For every additional 2.5m height
Dismantling clearing away the damaged Sheet Roofing over Pan Tiles without roof timbers and carefully stacking materials useful for reuse etc,as directed by the departmental officers as per standard specification
Dismantling and clearing away carefully and stacking materials useful for reuse the cracked/ dislodged brick wall of the building and to dispose debris etc complete complying with standard specification and as directed by the departmental officers.
Dismantling clearing away the DOORS AND WINDOWS including removal of frames,hinges and fastening etc., complete complying as directed by the departmental officers as per standard specification.
Dismantling of damaged and undulated flooring and conveying debries from all floors to ground level outside the mahal etc., complete complying with standard specification and as directed by the departmental officers.
Dismantling of brick jelly lime concrete flooring of any thickness and conveying by dolly and stacking the useful stone for reuse etc.,
Removal of the existing detoriated lime plastering over the wall, arches, domes and special type of ceiling of Madras terraced type roof carefully without disturbing or damaging the rafters, etc., complete complying with standard specification and as directed by the departmental officers.
Laying Brick jelly lime concrete in lime mortar 1:2 ( One lime and two brick jelly ) (no sand to be added) using 20 mm gauge brick jelly for foundation, flooring including dewatering wherever necessary and laid in layers well rammed, consolidated etc., complete complying with standard specification and as directed by the departmental officers.
Reconstruction of brick masonry wall with similar type of bricks in lime mortar 1:2 (one lime two sand) using wire cut brick of size 9”x4”x3” (Specially manufacturing) and using Pollachi lime in all floors as per traditional preparation and doCu.mented type construction such as arches and lintels, walls, etc., complete complying with standard specification and as directed by the departmental 0fficers.
Teakwood wrought & putup for joist, beam, rafters and purlins,etc., which are in full length new member placed for supporting the Madras Terrace roof/ Mangalore tiles roof or any other area in all floor as directed by the departmental officers by using well seasoned superior quality and approved variety of teakwood for heritage building work including fixing of iron holdfasts incase of doors, windows and ventilators etc.,and excluding cost of holdfasts and making necessary size holes in the masonry to receive the ends of wooden joists, beams, etc., all fixtures and fastenings etc., complete. Item to include all moulding and chamber to be made as per original design indicated by the Engineer In Charge. (The rate includes the cost of teakwood, labour charges for wrought and putup to the existing clue/design, fixing in position to true alignment and gradient wherever necessary. Complying with standard specifications and as directed by the departmental officers (sample of teakwood to be shown to the Executive Engineer concerned for approval before use on work). Application of Solignum on the wooden surface should also be done. In all floors
Racking out the brick joints of walls, arches, etc., to a depth of approximately 5cm for a wall thickness of 45cm and above to remove the dead mortar in between the brick joints and cleaning the surface with coir brush and washed with pure water etc., complete complying with standard specification and as directed by the departmental officers.
Grouting and stiching the wide cracks at roof using lime mortar 1:2 with pot pieces for filling up the cracks and the voids, creivices and gap etc.shall be completely sealed with necessary grouting pump. This pressure pump is to be used after cleaning the cracks, washing etc., and then the cracks are grouted with lime mortar 1:2 and it is allowed to be cured till final setting of lime mortar before taking up further leak proof treatment work.
Pointing,grouting and filleting the brick joint of wall and arches with lime mortar 1:2 (one of lime and two of sand) using Pollachi lime in all floors etc., complete complying with standard specification and as directed by the departmental officers.
Strengthening the existing walls by providing grouting by formation of two holes of size 1” with required intervals - depth of 350mm for an area of 1 sq.m and depending upon the site conditions injecting lime slurry consisting of lime mortar 1:2 (one lime and two of sand) using Pollachi lime in all floors added with grouting admixture by 2% weight of lime, by using required equipment and the rate includes the cost of all materials, labour charges etc., complete complying with standard specification and as directed by the departmental officers.
Replastering ( base plastering) the brick wall, pillars and arches, etc., with lime mortar 1:2 ( one of lime and two of sand) to a thickness of 30 mm laid in two layers of 15mm thick using Pollachi lime in all floors etc., complete complying with standard specification and as directed by the departmental officers.
Replastering the ceiling, etc., with Lime mortar 1:1.5 (one Lime and one and half sand),20mm thick using Pollachi lime in all floors including labour charges, etc., complete complying with standard specifications as directed by the departmental officers.
Applying thin coat of hand grinded lime mortar paste in lime mortar 1:1.5 (one lime and one and half sand) 6mm thick using Pollachi lime in all floors ( mix should be with 5.9 kg of jaggery, 2 kg of glue, 1.1 kg of gallnut, 1.4 kg of oakum, 30 nos eggs, 1 litre curd, 3 kg white marble powder, 0.5 kg vajram, 0.06m3 of surki, (for 10 sq.m area) of mugal plastering ( Theervai) over the newly plastered surface as per the existing clues (including finishing the surface with smoothness) `etc., complete complying with standard specification and as directed by the departmental officers. ( For inner walls)
Renewing and fixing teak wood panelled Door shutters openable type by using well seasoned teak wood of superior quality and approved variety as per the original design and pattern instructed by the Engineer in charge. The door shutter is made with two number of 120mmx 40 mm size vertical styles, top rail, lock rails and bottom rails of size 125mmx40mm,250mm x 40mm, 170mmx40mm respectively. The door shutter panels is covered with teak wood planks of 25mm thick including all necessary fittings brass/ steel hardwares like screws, nails, hinges, hooks, tower bolts, handle, aldrops of same design, size etc complete. item to also include making all the mouldings and design of the panels as in the existing evidence. item to include complete finishing of the shutters as directed by the departmental officer. (The rate inclusive of cost of all teak wood materials, Labour wrought and putup of door frames and shutters, cost of all furniture fittings, labour charges for fixing inposition etc., complete complying with standard specifications. (Two leaves)
Renewing and fixing fully glazed shutters for windows openable type by using well seasoned teakwood of superior quality as per the original design and pattern instructed by the Engineer In Charge. The window shutter is made of vertical styles of size 80mm x 30mm. Both top and bottom rail is of size 80mm x 30mm. The window shutter panels is covered with 4mm thick plain glass which is fixed with teakwood reepers scantling of size 35mm x 30mm on both sides and the glass panel is divided into 6 parts. Item to also include making all the mouldings and design of the panels as in the existing evidence. Item to include complete finishing of the shutters as directed by the departmental officers.(The rate inclusive of cost of all teakwood materials, labour wrought and putup of door shutters, cost of all furniture fittings, cost of 4mm thick plain glass, labour charges for fixing the shutters in position etc., complete complying with standard specifications)
Renewing and fixing of glazed ventilator with new Teak wood glazed ventilator of size 1.20m x 0.60m by using Teak wood scanting thickness of size 0.04m frames fixed with 4mm thick pin headed glass including labour for wrought put up and fixing the ventilator in position with necessary furniture fittings including with neat finishing etc., complete complying with standard specifications and as directed by the departmental officers.
Renewing the damaged teak wood ornamental hand rail in stair case and verandha portion with superior quality of teak wood and kadasal work in all the members, the top member of size 8 x 6 cm with curved surface, in bottom member of size 10 x 8 cm, the internal vertical supports are 6.5 x 6.5 cm, the internal bracing and design members of side with 2.50 x 2.50 cm with complete kadasal works, the rate inclusive of cost teak wood, skilled labour charges, necessary screws, nails, etc., complete complying with standard specification as directed by the departmental officers.
Relaying of new cut stone flooring with stone of Thickness 75mm ( Fully dresseed of size on all faces) over bed of existing brick jelly concrete in lime mortar 1:2 ( one of lime and two of sand) 40mm thick using pollachi lime in all florrs and pointing the stone joints with same lime mortar etc., complete complying with standard specification are directed by the department officers.
Paving the floor with best approved quality Heritage Patterned customized cement based designer tiles of size 200mm x200mm x 20mm including corner & inner border tiles laid over cement mortar bed of 20mm thick in cement mortar 1:3 (one cement and three crushed stone sand) with required Cement Slurry and Mortar Plasticizer in all floors and the top pointed with Water Resistant Tile Epoxy Grout etc., complete complying with standard specification and as directed by the departmental officers. (The make and brand of the tiles should be got approved by Executive Engineer before use on works )
Providing Teak wood planks wooden flooring using with 30mm thick 0.15cm wide Teak wood planks fixed with teak wood beeding by making 0.025m grooves including the cost of making grooves cost of beading and fixing with necesssary screws includding cost of all materials and labours etc complete complying with standard specifications.
Easing Teak wood planks wooden flooring using with 30mm thick 0.15cm wide Teak wood planks fixed with teak wood beeding by making 0.025m grooves including the cost of making grooves cost of beading and fixing with necesssary screws includding cost of all materials and labours etc complete complying with standard specifications.
Renewing and fixing in position of well seasoned superior quality of teakwood planks of size 300mm x20mm to a required length including fixing the planks in the ceiling of Mangalore tiled roofing or wherever necessary with screws, nails, etc., complete complying with standard specification and as directed by the departmental officers.(The rate includes the cost of teakwood planks, wrought and putup of teakwood planks, fixing the teakwood planks in position and cost of all nails, screws, etc.,)
Supplying and stacking new best Heritage Ridge tiles at site of work for premeasurement as directed by the departmental officers, etc., complete.
Supplying and fixing best quality of Bison cement bonded particle Board 10mm thick including labour charges for fixing the board including painting charges etc. complete complying with standard specification.
Reroofing with Heritage mangalore tiles over Galvanised sheet in Teak wood reepers of size (50x12mm) using lime in all floors for Brick masonry band with mangalore tiles, including Teak wood reepers of size (50x12mm) complete complying with standard specification and as directed by the departmental officers.(The rate includes the cost of all materials like Mangalore tiles,Galvanised sheet,and labour charges for laying of Mangalore tiles with Galvanised sheet roof in position).
Supplying and Painting the wall two coats with approved weather proof Exterior Emulsion paint over one primer coat of over wall surface ect., complete complying with standard specification. (The colour and shade of the Emulsion paint shall be got approved by the Executive Engineer before use of work).
Revarnishing with wood work with two coats of best Lac Finish of approved quality and brand including preparation of surface etc.. The rate is inclusive the cost of all material, labour charges and finishing neatly etc., complete compluing with standard specification and as directed by the departmental officers
Labour wrought and put up inposition of frames inclusive of fixing holdfast for doors,windows and ventilators etc etc., complete complying with standard specification and as directed by the departmental officers.
Painting new wood work with two finishing coats of synthetic enamel ready mixed paint of approved quality and colour over one coat priming coat in all floors including the cost of primer etc., complete complying with standard specification. (The make, quality and colour of paint should be got approved by the Executive Engineer before use on works.)
Clean removal of saline action over the stone pillars, brick wall etc., will paper pulp treatment by using floating paper, distilled water, plastic bucket,coir, brush etc., complete complying with standard specification and as directed by the departmental officers.
Labour charges for supplying and fixing of hoisting machine by hire basis for lifting of all materials from ground to terrace and shifting of damaged unused materials from terrace to ground floor with necessary rope, heisting platform, motor, controller as per site requirement days etc., the rate is inclusive of hire charges for operating the machine and daily Bata and conveyance charges and dismantling and removing the same after completion of work etc complete of work etc complete with standard specification and as directed by the departmental officers.
Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. (Payment for centering shall be given after the concrete is laid)
Construction of mortar pit of inner size 0.90mx0.45m with brick partition wall 11.50cm thick in cement mortar 1:3 (one cement and three sand) for 60 cm height with necessary earth work open excavation for size of 1.43m x 0.98m to a depth of 0.91m and sand filling for 15 cm thick, Plain Cement Concrete 1:5:10 (one cement, five sand and ten 40mm HBG stone jelly), 8 cm thick with plastering 1:5 (one cement and sand), 12mm thick on both sides and top etc.. complying with standard specification and as directed by the departmental officers
Providing pest control with antitermite treatement drilling holes at junction of walls with floors at 300mm intervals and injucting chemical emulsion on those with cement etc. making holes along the vertical surface out side the walls at 150mm intervals to the depth of 450mm pointing chemical emulsion into the holes and closing holes with chemical etc. spraying all surface of treatment is to be done as per IS code no:5313/ Part III 1981 with approved chemical.(The chemical is to be used on the work should be got approved by the Executive Engineer before use on work) etc complete complying with standard specification and as directed by the departmental officers.
Renewing the damanged G.I Sheet Rain Water Gutter with new corrrugated G.I sheet of 22 Gauge 0.80mm Thick with necessary U or J Bolts screws, nails and bitumen washers including cost of labour and materials etc., complete complying with standard specification as directed by the departmental.
Supplying and fixing in position best approved of BIS quality PVC rain water down fall pipes having a pressure of 4 kg. / sq.cm including cost of necessry PVC shoe, PVC bend, cast iron gratings of required diameter and special clamps, brass screws, nails, etc., and fixing of cast iron gratings at junction of parapet and the RCC roof slab including finishing neatly etc., complete. The rate shall be inclusive of cast of removable cast iron grating. The PVC pipe shall be fixed in wall with special type of "U" clamp at the centre of the pipe line in addition to those for more than 3.0 metre pipe length, etc., complete complying with standard specification.
Finishing the top of roof with one course of machine pressed tiles of size 230mm x 230mm x 20mm of approved quality set in Cement Mortar 1:3 (One Cement and Three Sand) 12mm thick mixed with water proofing compound conforming to ISS at 2% by weight of cement used and the joints pointed neatly to full depth of tiles with the same cement mortar mixed with red oxide and water proofing compound including curing etc., complete complying with standard specification and as directed by the departmental officers.
Providing water membarane treatement to the leaky terrace using Synthetic Butadine Rubber sheet (SBR) including hacking the surfaces and roughening the old RCC roof surface with wire brushes and tools wherever necessary and the Synthetic Butadine Rubber sheet (SBR) has been laying before weathering course brick jelly concrete and with using necessary SBR adhesive to carefuly laying with proper joints ( the joints over lap to be not more than over lap 15cm to 20cm ) etc, including labour for laying the sheets etc complete including curing and finishing neatly complying with standard specification and as directed by the departmental officers.
Renewing and fixing eaves board of size 25cm x 2cm using teakwood of best quality as per existing style inluding cost of teakwood,labour wrought and putup, labour charges for fixing in position etc. complete complying with standard specification.
"Supplying and fixing of best quality and approved variety of ISMB girder of make TATA or equivalent for the various spans fixing below the madras terrace roof to support the roof in the places wherever necessary as directed by the departmental officers and fixed ISMB- ‘I’ Section over the bed blocks in the wall including cost of dismantling the brick work wherever necessary for fixing the ‘I’ Section and redoing the same and also the cost of ‘I’ Section labour charges hire charges for welding machineries, hoist for lifting and hire charges for hydraulic manuals Jacky and other allied tools etc., complete including the cost of porting of ISMB- ‘I’ section etc and one coat of red oxide primer etc., complete. The I beam has to be supported on brick wall using appropriate blocks so as to support the madras terrace roofing in all the floors etc., complete complying with standard specifications.(The make and brand of the ISMB girder I section should be got approved by the Executive Engineer before use on works).
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.82 MB
PTRacecourseooty.pdf
Tender Documents • 1.52 MB
PQRacecourseooty.pdf
Tender Documents • 0.74 MB
BOQ_792110.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid