Loading…
Loading…
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹2.1 Craccepted-finance | ₹2.1 Cr | accepted-finance |
Tender Value
₹2.0 Cr
EMD Value
₹3.5 L
Closing Date
2 Mar 2026, 9:30 pmClosed
Bengaluru Water Supply And Sewerage Board
sowbhagya
Work of shifting UGD utilities to facilitate the BMRCL construction works along ORR package 1 BMRCL phase-3 JP nagar 4th phase Metro station to Mysore road project
BWSSB/2025-26/WS/WORK_INDENT3290
BWSSB/2025-26/WS/WORK_INDENT3290
Open
Water supply/sewage lines
Two Tender Document System(Two Cover)
BWSSB Chief Engineer Project Bengaluru
₹5,000
₹3.5 L
2 Mar 2026
17 Feb 2026
3 Mar 2026
21 Feb 2026
21 Feb 2026
Work of shifting UGD utilities to facilitate the BMRCL construction works along ORR package 1 BMRCL phase-3 JP nagar 4th phase Metro station to Mysore road project
Dismantling of Flexible pavements and disposal of dismantled materials and stacking serviceable and unserviceable materials separately-By Mechanical Means-Bituminous course
Earth work excavation for pipeline trenches in all kinds of soils by mechanical
means as per drawing and technical specifications, including setting out,
construction of shoring, strutting, barricadin...
Earth work excavation for pipeline trenches in all kinds of soils by mechanical
means as per drawing and technical specifications, including setting out,
construction of shoring, strutting, barricadin...
Earth work excavation for pipeline trenches by mechanical means as per
drawing and technical specification, including setting out, construction of
shoring, strutting, cost of blasting materials, barri...
Earth work excavation for pipeline trenches by mechanical means as per
drawing and technical specification, including setting out, construction of
shoring, strutting, cost of blasting materials, barri...
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever nec...
A toe wall for toe protection can either be in dry rubble masonry in case of dry rubble pitching or pitching with stones in wire crates or it can be in PCC M15 nominal mix if cement concert block have...
Providing and laying Ductile Iron pipes of class conforming to IS 8329:2000 with latest amendments, conveying to work site, rolling and lowering into trenches, laying true to line, level and perfect l...
Providing and fixing DI Resilient seated soft sealing SLUICE VALVE of variouis dia. with body bonnet of Ductile Iron (DI) conforming ti IS-1865 with the latest amendments and of grade GGG 40/50, shaft...
Providing Ductile Iron Push on special confirming to IS 9523:2000-100mm diameter 45degree
Providing Ductile Iron Push on special confirming to IS 9523:2000-100mm diameter 90degree
Providing Ductile Iron Push on special confirming to IS 9523:2000-100mm diameter 11.25degree
Providing S&S RCC SPUN / VIBRATED CAST PIPES (REINFORCED) pipes NP-3 Class conforming to IS:458-1988 with latest amentments using ordinary portland cement, for sanitary works and conveying to work sit...
Providing and constructing "WIRE CUT BRICK MACHINEHOLE CHAMBERS" using Portland/Pozzolana cement, conical in shape at top, with CC 1:3:6 foundation using 40mm and down size graded metal of approved qu...
For every 0.1m additional from 1.5 to 3m depth
Construction of RCC Machinehole chambers of 1:1.5:3 proportion or approved type Cast-insitu / Pre-cast RCC Machinehole chambers, constructed using form vibrators of standard type, with barricading, da...
For every 0.1m additional from 1.5 to 3m depth
Spreading of Stone Dust : Supplying and providing stone dust in the station yard or wherever required including watering, ramming, consolidating and dressing. The rate includes the cost of material, l...
Refilling available earth around trenches/pipelines, cables in layers not exceeding 20 cm in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m , and lift upto 1.5m...
Removal of Unserviceable Soil with Disposal upto a suitable distance as directed by the Engineer incharge of work
Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes...
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement
including cost of all materials, machinery, labour, cleaning, straightening,
cutting, bending, hooking, laping/welding joints, tyin...
For formwork, centering and scaffolding
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Materia...
Providing and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.20 kg/m2 on the prepared bituminous surface cleaned with mechanical broom
Providing and applying primer coat with SS1 grade Bitumen Emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg/m2 using mechanica...
Providing and laying Bituminous Macadam with 100 tph capacity hot mix plant batch type using crushed aggregates of specified grading premixed with bituminous binder VG-30 @ 3.3% by weight of mix, tran...
Providing and laying Bituminous Concrete with 120 TPH capacity hot mix plant batch type using crushed aggregates of specified grading, premixed with bituminous binder VG-30 at 5.2 per cent of mix and ...
PVC pipe - OD 110mm and 6 Kg/sqcm (House service connection0
Excavating of ramming/jacking/driving pit and receiving pit of size 5.00m(length) x 3.00m (breadth), up to 6.00 m depth in all soil strata including shoring and strutting including cutting of Asphalt/...
Installation of product pipe by manual jacking method - Manufacturing, providing, transporting, rolling, lowering, laying & jointing, testing, commissioning of ERW (Electric Resistance Welded), SAW (S...
Connecting the existing lateral connections to the proposed / existing
Sewer Mains, including earth work excavation in all soils, lowering,
laying, barricading, dewatering, jointing RCC-NP3 Class pipe...
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_document_UGD.doc
Tender Document • 1.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .