Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Infra Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹65.9 LAccepted-AOC | L1 | Accepted-AOC ACCEPTED | |
| 2 | L2₹68.5 L+₹2.5 L (3.76%)Rejected-AOC | L2 | Rejected-AOC REJECTED | |
| 3 | L3₹68.6 L+₹2.6 L (3.97%)Rejected-AOC 00 OPP RASHMI HOSPITAL RAYA ROAD LAXMI NAGAR MATHURA UTTAR PRADESH 281204 | MATHURA | UTTAR PRADESH | 281204 | L3 | Rejected-AOC REJECTED |
Tender Value
₹66 L
EMD Value
₹66,000
Closing Date
29 Jun 2024, 10:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE EDC SPN
KRISHNA NAGAR JAIL ROAD SHAHJAHANPUR
INCREASING CAPACITY OF 100-250 KVA DTF AT VARIOUS PLACES UNDER EDD 2 SHAHJAHANPUR UNDER EDC SHAHJAHANPUR (MVVNL)
2024_MVVNL_932149_1
12(W)/EDCS/2024-25
Open Tender
Miscellaneous Works
Item Rate
30 days
SHAHJAHANPUR
Please refer Tender documents.
3 documents required · 3 mandatory
₹3,540
SE EDC
₹66,000
Yes
7 Nov 2024
24 Jun 2024
29 Jun 2024
24 Jun 2024
29 Jun 2024
24 Jun 2024
Amount
Description (ALL DECENTRALISED MATERIAL (SUCH AS AL. LUGS, GROUTING MATERIAL, FENCING MATERIAL)WILL BE ARRANGED AND PROVIDED BY THE CONTRACTOR.
SAFE CARRIAGE OF 630 KVA TRASNFORMER FROM STORE BYEBAGH TO VARIOUS SITES INCLUDING LOADING AND UNLOADING BOTH SIDES
SAFE CARRIAGE OF 250 KVA TRASNFORMER FROM STORE BYEBAGH TO VARIOUS SITES INCLUDING LOADING AND UNLOADING BOTH SIDES
SAFE CARRIAGE OF 63 KVA TRASNFORMER FROM STORE BYEBAGH TO VARIOUS SITES INCLUDING LOADING AND UNLOADING BOTH SIDES
SAFE CARRIAGE OF 100 KVA TRASNFORMER FROM STORE BYEBAGH TO VARIOUS SITES INCLUDING LOADING AND UNLOADING BOTH SIDES
SAFE CARRIAGE OF THREE PHASE DO FUSE SET FROM STORE BYEBAGH TO VARIOUS SITES INCLUDING LOADING AND UNLOADING BOTH SIDES
SAFE CARRIAGE OF LT CABLE 1X240 MM SQ MM FROM STORE BYEBAGH TO VARIOUS SITES INCLUDING LOADING AND UNLOADING BOTH SIDES
SAFE CARRIAGE OF LT CABLE 1X630 MM SQ MM FROM STORE BYEBAGH TO VARIOUS SITES INCLUDING LOADING AND UNLOADING BOTH SIDES
SAFE CARRIAGE OF LT CABLE 1X400 MM SQ MM FROM STORE BYEBAGH TO VARIOUS SITES INCLUDING LOADING AND UNLOADING BOTH SIDES
SAFE CARRIAGE OF LT CABLE 3.5*70 MM SQ MM FROM STORE BYEBAGH TO VARIOUS SITES INCLUDING LOADING AND UNLOADING BOTH SIDES
SAFE CARRIAGE OF LT CABLE 3.5*150 MM SQ MM FROM STORE BYEBAGH TO VARIOUS SITES INCLUDING LOADING AND UNLOADING BOTH SIDES
CONSTRUCTION OF PLINTH OF SIZE 2.0X2.0X1.5 Mtr. CONSISTING EARTH WORK IN EXCAVATION, C.C. WORK IN RATIO 1:4:8, Ist CLASS BRICK WORKS IN 1:4:6, R.C.C. WORK IN RATIO 1:2:4 AND PLASTER WORK OF 10 MM THICKNESS IN RATIO 1:4.
PIPE EARTHING OF DISTRIBUTION TRANSFORMER OF 400/250 KVA BY EARTHING CHEMICAL BY DIGGING / DRILLING OF PIT APPROX 12 FIT (L.S.3 MTR) DEPTH AND INSERTING G.I. PIPE OF 1.25" DIA OF 'B' GRADE AND THEN FILL UP THE CHEMICAL WITH WATER AND COMPLETE TO THE REQUIREMENT. TWO NO. OF EARTHING OF EACH TRANSFORMER ONE FOR THE TRANSFORMER NEUTRAL AND ANOTHER FOR TRANSFORMER BODY, DOUBLE POLE & EQUIPMENT ETC. TO BE DONE. THE TOP OF THE INSERTED PIPE TO BE CONNECTED TO THE NEUTRAL AND TRANSFORMER BODY THROUGH G.I. STRIP WITH THE HELP OF NUT AND BOLT OR BY WELDING AS PER DIRECTION OF THE AUTHORISED REPRESENTATIVE OF THE DEPARTMENT. IT INCLUDES THE COST OF ALL MATERIALS, LABOUR, T&P PROVIDE BY THE CONTRACTOR FOR PROPER COMPLETION OF WORK.
PROPER WIRE MESH FENCING OF 250 KVA TRANSFORMER ALONGSIDE THE PLINTH. THE HEIGHT OF THE FENCE SHOULD BE 7 FEETS ABOVE FROM GROUND, PROVIDING FABRICATION AND FIXING THE MAIN GATE IN FRONT OF THE PLINTH WITH PROVISION FOR LOCKING SYSTEM. PAINTING OF ENTIRE METAL WORKS/ MAIN GATE WITH WIRE MESH WITH BUS GREEN SUPER ENAMELED PAINT IN TWO COATS ON THE PRIMER COAT OF RED OXIDE. COMPLETE IN ALL RESPECT
REMOVING ALL OLD CONNECTIONS, UNMOUNTING OF OLD 160 KVA TRANSFORMER
REMOVING ALL OLD CONNECTIONS, UNMOUNTING OF OLD 25 KVA TRANSFORMER
REMOVING ALL OLD CONNECTIONS, UNMOUNTING OF OLD 63 KVA TRANSFORMER
REMOVING ALL OLD CONNECTIONS, UNMOUNTING OF OLD 400 KVA TRANSFORMER
REMOVING ALL OLD CONNECTIONS, UNMOUNTING OF OLD 100 KVA TRANSFORMER
REMOVING ALL OLD CONNECTIONS, UNMOUNTING OF OLD 65 KVA TRANSFORMER
MOUNTING OF 250 KVA NEW TRANSFORMER AT OLD CONSTRUCTED PLINTH INCLUDING FIXING ALL REQUIRED ACCESSORIES, MAKING CONNECTION, ENERGISATION, COMPLETE IN ALL RESPECT. (ALL DECENTRALIZED MATERIAL WILL BE PROVIDED ARRANGED BY THE CONTRACTOR)
MOUNTING OF 100 KVA NEW TRANSFORMER AT OLD CONSTRUCTED PLINTH INCLUDING FIXING ALL REQUIRED ACCESSORIES, MAKING CONNECTION, ENERGISATION, COMPLETE IN ALL RESPECT. (ALL DECENTRALIZED MATERIAL WILL BE PROVIDED ARRANGED BY THE CONTRACTOR)
MOUNTING OF 63 KVA NEW TRANSFORMER INCLUDING FIXING ALL REQUIRED ACCESSORIES MAKING CONNECTION, ENERGISATION, COMPLETE IN ALL RESPECT (ALL DECENTRALISED MATERIAL WILL BE PROVIDED BY THE CONTRACTOR)
MOUNTING OF 630 KVA NEW TRANSFORMER AT OLD CONSTRUCTED PLINTH INCLUDING FIXING ALL REQUIRED ACCESSORIES, MAKING CONNECTION, ENERGISATION, COMPLETE IN ALL RESPECT. (ALL DECENTRALIZED MATERIAL WILL BE PROVIDED ARRANGED BY THE CONTRACTOR)
LAYING OF OF LT CABLE 1X240 MM SQ MM
LAYING OF OF LT CABLE 1X630 MM SQ MM
LaAYING OF LT CABLE 3.5*150 MM SQ MM
LaAYING OF LT CABLE 3.5*70 MM SQ MM
LaAYING OF LT CABLE 1*400 MM SQ MM
RECEIVED BACK OF OLD 100/ 160KVA TRANSFORMERS FROM VARIOUS WORK SITES TO CENTRAL STORE CENTER, BAIBAGH, SHAJAHANPUR INCLUDING SAFE LOADING AND UNLOADING BOTH SIDE
RECEIVED BACK OF OLD 400 KVA TRANSFORMERS FROM VARIOUS WORK SITES TO CENTRAL STORE CENTER, BAIBAGH, SHAJAHANPUR INCLUDING SAFE LOADING AND UNLOADING BOTH SIDE
RECEIVED BACK OF OLD 25/63 KVA TRANSFORMERS FROM VARIOUS WORK SITES TO CENTRAL STORE CENTER, BAIBAGH, SHAJAHANPUR INCLUDING SAFE LOADING AND UNLOADING BOTH SIDE
PROVIDING AND FIXING OF LT TAILLESS UNIT 400 AMP., COMPLETE JOB AS PER RESSPO SPECIFICATION. ( TAILLESS UNIT WILL BE ARRANGED AND PROVIDED BY THE CONTRACTOR.)
PROVIDING AND INSTALLATION OF AI LUGS FOR 150SQ MM CABLE
PROVIDING AND INSTALLATION OF AI LUGS FOR 400SQ MM CABLE
PROVIDING AND INSTALLATION OF AI LUGS FOR 630SQ MM CABLE
PROVIDING AND INSTALLATION OF AI LUGS FOR 70 SQ MM CABLE
INSTALLING OF DO FUSE SET
PROVIDING AND INSTALLATION OF AI LUGS FOR 240SQ MM CABLE
M/S HINA ELECTRICALS
M/s Shubham Traders
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .