Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹62.8 LAdmitted-Finance | -1.00% | ₹62.8 L | L1 | Admitted-Finance |
| 2 | L2₹66.6 L+₹3.8 L (6.06%)Admitted-Finance | +5.00% | ₹66.6 L+₹3.8 L (6.06%) | L2 | Admitted-Finance |
Tender Value
₹63.4 L
EMD Value
₹1.3 L
Closing Date
21 May 2026, 3:00 pmClosed
Director
DEEP BHAVAN 44 Bhagat Singh Road Phoenix Bay
Reconstruction of 12 meter RCC Cape Connaught Lighthouse Tower.
2026_DGLL_906632_1
CM-PB-02/1/2025-M
Open Tender
Civil Works
Works
455 days
Nancowry Island
Please refer Tender documents
15 documents required · 15 mandatory
₹0
₹1.3 L
Yes
DEEP BHAVAN 44 Bhagat Singh Road Phoenix Bay S
5 Jun 2026
30 Apr 2026
22 May 2026
30 Apr 2026
21 May 2026
30 Apr 2026
15 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Surfacing dressing of the ground including removing vegetation and inequalities not exceeding 15 cm deep disposal of rubbish, lead up to 50m and lift up to 1.5m in all kinds of soil including cost of all materials supply of skilled labours, transportation charges of all men & materials upto worksite, head loads, overheads, cost of minor tools & Plants, safety arrangements, insurance of workmen and all other charges etc complete. | 78 | Sqm | 91.8 | ₹7,160.4 |
| 2 | Cleaning jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30cm measured at a height of 1m above ground level and removal of rubbish up to a distance of 50m outside the periphery of the area cleared including all tools and plants, labour etc. complete as per direction of engineer in charge including cost of all materials supply of skilled labours, transportation charges of all men & materials upto worksite, head loads, overheads, cost of minor tools & Plants, safety arrangements, insurance of workmen and all other charges etc complete. | 822 | Sqm | 47.3 | ₹38,880.6 |
| 3 | Earth work in excavation in trenches for foundations and for pipes, drains & cables etc. (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5m including getting out and stacking the excavated soil and disposal of surplus excavated soil as directed within a lead of 50m in loose or soft soil including all tools & plants, labour etc. complete as per direction of Engineer-in-Charge including cost of all materials supply of skilled labours, transportation charges of all men & materials upto worksite, head loads, overheads, cost of minor tools & Plants, safety arrangements, insurance of workmen and all other charges etc complete. | 40 | Cum | 477.12 | ₹19,084.8 |
| 4 | Providing and laying in position cement concrete of 1:4:8 (1 Cement : 2 Coarse River Sand : 4 Graded Stone aggregate 20mm nominal size) with mechanical mixing up to plinth level including laying, compacting, curing and centering & shuttering , form Works complete with all materials, tools & plants, labours and all other charges etc. complete as directed by the engineer in charge including cost of all materials supply of skilled labours, transportation charges of all men & materials upto worksite, head loads, overheads, cost of minor tools & Plants, safety arrangements, insurance of workmen and all other charges etc complete. | 5 | Cum | 18,310.66 | ₹91,553.3 |
| 5 | Providing and laying in position cement concrete of 1:2:4 (1 Cement : 2 Coarse River Sand : 4 Graded Stone aggregate 20mm nominal size) with mechanical mixing up to plinth level including laying, compacting, curing and centering & shuttering , form Works complete with all materials, tools & plants, labours and all other charges etc. complete as directed by the engineer in charge including cost of all materials supply of skilled labours, transportation charges of all men & materials upto worksite, head loads, overheads, cost of minor tools & Plants, safety arrangements, insurance of workmen and all other charges etc complete. | 3.1 | Cum | 22,231.51 | ₹68,917.68 |
| 6 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. including the cost of all materials, tools & plants, labours and all other charges etc. complete as directed by the engineer in charge including cost of all materials supply of skilled labours, transportation charges of all men & materials upto worksite, head loads, overheads, cost of minor tools & Plants, safety arrangements, insurance of workmen and all other charges etc complete. | 18.7 | Cum | 526.85 | ₹9,852.1 |
| 7 | Supplying and filling in trenches, plinth, sides, of foundation, floors etc. with morroum/river sand in layers not exceeding 20 cm in depth including watering, ramming, consolidated and drressing etc. complete with supply of all labours, tools, etc. complete as directed by engineer-in-charge including cost of all materials supply of skilled labours, transportation charges of all men & materials upto worksite, head loads, overheads, cost of minor tools & Plants, safety arrangements, insurance of workmen and all other charges etc complete. | 2 | Cum | 5,708.64 | ₹11,417.28 |
| 8 | Hard stone sloing/ pitching laid in course and required profile with hammer dressed stones having no sides less than 20cm, with minimum depth of 20cm including preparing the bedding surface, supply of all materials, labours, tools and plants etc. completed as directed by the engineer-in-charge including cost of all materials supply of skilled labours, transportation charges of all men & materials upto worksite, head loads, overheads, cost of minor tools & Plants, safety arrangements, insurance of workmen and all other charges etc complete. | 1.15 | Cum | 1,771.52 | ₹2,037.25 |
| 9 | Providing and laying cement concrete 1 : 3 : 6 (1 Cement, 3 Coarse river Sand: 6 graded stone aggregate 20 mm normal size) in Foundation and plinth including laying, compacting, curing with materials, tools, labours etc. complete as directed by the engineer in charge including cost of all materials supply of skilled labours, transportation charges of all men & materials upto worksite, head loads, overheads, cost of minor tools & Plants, safety arrangements, insurance of workmen and all other charges etc complete. | 3.03 | Cum | 19,608.16 | ₹59,412.72 |
| 10Providing and laying in position reinforced cement concrete of grade 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) including the cost of centering, shuttering but excluding the cost of reinforcement including cost of all materials supply of skilled labours, transportation charges of all men & materials upto worksite, head loads, overheads, cost of minor tools & Plants, safety arrangements, insurance of workmen and all other charges etc complete. | |||||
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 3.53 MB
BOQ_952952.xls
BOQ • 0.35 MB
Capecannaughttender.pdf
Tender Documents • 33.70 MB
Drawing.pdf
Additional Documents • 2.88 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .