Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.1 LAccepted-AOC ETAWAH | L1 | Accepted-AOC Complete | |
| 2 | L2₹8.2 L+₹10,296 (1.27%)Rejected-AOC ARYA ASSOCIATESS | NA | NA | 121004 | L2 | Rejected-AOC Complete | |
| 3 | L3₹8.6 L+₹47,623.89 (5.87%)Rejected-AOC | L3 | Rejected-AOC Complete | |
| 4 | L4₹8.6 L+₹52,950.83 (6.53%)Rejected-AOC | L4 | Rejected-AOC Complete |
Tender Value
₹8.6 L
EMD Value
₹17,000
Closing Date
27 Mar 2024, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
Bhognipur Division LGC Etawah
Construction of V.R.B. of Akodhi Dy. at Km. 11.150
2024_UPIDC_919323_3
13/EE/2023-24
Open Tender
Civil Works
Item Rate
30 days
Etawah
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,626
₹17,000
14 Jun 2024
20 Mar 2024
28 Mar 2024
20 Mar 2024
27 Mar 2024
20 Mar 2024
Amount
Earth work in excavation in foundation in all type of soil including all lead & lift with cost of all labour, T&P etc. complete for proper completion of work.
Cement concrete in 1:2:4 (M-15) with cement, coarse sand and stone aggregate of 20-40 mm size in foundation including all labour, T&P etc. complete for proper completion of work.
1st class brick work in 1:4 cement mortar including cost of all material, labour, and T&P etc.
Ordinary centring and shuttering for R.C.C work including all lift, with cost of all labour, T&P etc. complete for proper completion of work.
Cutting, bending, binding and placing in position of steel Reinforcement including cost of bindiong wiers, steel, labour, T&P etc. complete for proper completion of work.
Laying R.C.C.1:1:2 in slab with cement, coarse sand and stone aggregate 10-20 mm size including all lead & lift, with cost of all labour, T&P etc. complete for proper completion of work.
Laying C.C. 1:1:2 with cement coarse sand and stone aggregate (10-20 mm) size including all lift, with cost of all labour, T&P etc. complete for proper completion of work.
Deep struck Pointing 1:2 Cement, Mortar including cost of material, labour and T&P etc.
Finishing walls with water proofing cement paint of approved manufacturers such as Super Snowcem, Durrocem , Robiacem, Guttucem, supermen quality of required shade on uncoated wall surface (one coat) over one coat white cement primer to give even shades after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including curing and cost of all meterials.
Earth work in excavation in Making diversion & Bandha in all type of soil including all lead & lift with cost of all labour, T&P etc. complete for proper completion of work.
Earth work in excavation in Removing diversion & Bandha in all type of soil including all lead & lift with cost of all labour, T&P etc. complete for proper completion of work.
VINOD KUMAR CONTRACTOR
M N RISHI INFRA
Namrta Contruction
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .