| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹26.5 LAdmitted-Finance | ₹26.5 L | L1 | Admitted-Finance |
| 2 | L2₹26.9 LAdmitted-Finance | ₹26.9 L | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Shivanya Constructions L1 | ARJ CONSTRUCTION L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation in ordinary soil, light black cotton sandy loam and dry silt including shoring, strutting, baling or pumping out water wherever necessary and refilling the sides of foundation with excavated earth in layers of 15cm thick and depositing the surplus earth at places as directed by the departmental officers with initial lead and lift | 660 | m3 | 115 ₹75,900 | 117 ₹77,220 |
| 1.10 | Plain cement concrete 1:4:8 mix (One cement four sand and eight aggregate) using 40mm size ISS gauge HBBG metal including mixing, laying, consolidating, curing, cost and conveyance of all materials to site and all labour charges etc., complete as per standard specification | 75 | m3 | 5,620 ₹4.2 L | 5,714 ₹4.3 L |
| 1.20Supplying and errecting centering to sides and soffits including supports and strutting for drainage sides and culvert body wall sides using M.S Sheets of size 90cm x 60cm and B.G 10stifened with welded mild steel angles of size 25mm x 25mm x 3mm for boarding laid over( silver oak joists ) of size 10cm x 6.50cm spread at about 90cm including all labour charges and cost and conveyance of all materials to site etc. complete Complying with Standard Specification | |||||
| 1.30 | Plain surface | 6.5 | m2 | 1,132 ₹7,358 | 1,151 ₹7,481.50 |
| 1.40 | upto 1.0m height | 1,384 | m2 | 548 ₹7.6 L | 558 ₹7.7 L |
| 1.50 | Plain cement concrete 1:2:4 mix (One cement two sand and four aggregate) using 20mm size ISS gauge HBBG metal including mixing, laying, consolidating, curing, cost and conveyance of all materials to site and all labour charges etc., complete as per standard specification | 153 | m3 | 7,008 ₹10.7 L | 7,125 ₹10.9 L |
| 1.60 | Providing and laying in position, standardized concrete mix M-20 Grade in accordance with IS 456-2000,using 20mm and downgraded hard broken granite stone jelly for all RCC items of works with minimum cement concrete of 325kg/M3 and maximum water cement ratio of 0.55, including admixture (plasticizer/super plasticizer) in recommended proportions as per IS :9103 to accelerate ,retard setting of concrete , improve workability without preparing strength and durability with about ( 5 cu.m) 7730 kg of 20mm machine crushed stone jelly and with about (3.30cu.m) 5156 kg of 10-12mm machine crushed stone jelly and with about (4.79cu.m) 7670kg of sand, but excluding cost of reinforcement grill and fabricating charges , centering and shuttering and also including laying , vibrating with mechanical vibrators ,finishing curing etc., and providing fixtures like fan clamps in the RCC floor/roof slabs wherever necessary without claiming etc., complete | 6 | m3 | 8,817 ₹52,902 | 8,965 ₹53,790 |
| 1.70 | Supply and fabrication and placing in position of TMT steel roads to required size and length as directed by the departmental officers including cost of binding wire, cutting, bending and tying with proper position etc., including cost and conveyance of all materials to site and all labour charges etc., complete Complying with Standard Specification | 480 | Kg | 94 ₹45,120 | 95 ₹45,600 |
| 1.80 | Plastering with cement mortar 1:3 mix, 20mm thick including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing etc. complete . complying with std. specifications | 304 | m2 | 623 ₹1.9 L | 633 ₹1.9 L |
| 1.90 | Conveyance of Excavated Excess Earth away from the site to 2km including loading and transportation charges etc., complete as per standard Specification. | 330.5 | m3 | 68 ₹22,474 | 69 ₹22,804.50 |
Tender Value
₹31.6 L
EMD Value
₹31,650
Closing Date
5 Mar 2026, 3:00 pmClosed
THE COMMISSIONER, SALEM CITY MUNICIPAL CORPORATION
Salem City Municipal Corporation, Fort Main Road, Salem.
Storm water Drain with culvert at Mu Su Thottannan street no-1 in Division no 56 Kondalampatty Ward office.
2026_MAWS_662033_1
E8-EST NO 326-D 2025-2026
Open Tender
Civil Works
60 days
Salem City Municipal Corporation
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹31,650
Salem City Municipal Corporation
13 Mar 2026
20 Feb 2026
5 Mar 2026
20 Feb 2026
5 Mar 2026
20 Feb 2026
23 Feb 2026
Earth work excavation for foundation in ordinary soil, light black cotton sandy loam and dry silt including shoring, strutting, baling or pumping out water wherever necessary and refilling the sides of foundation with excavated earth in layers of 15cm thick and depositing the surplus earth at places as directed by the departmental officers with initial lead and lift
Plain cement concrete 1:4:8 mix (One cement four sand and eight aggregate) using 40mm size ISS gauge HBBG metal including mixing, laying, consolidating, curing, cost and conveyance of all materials to site and all labour charges etc., complete as per standard specification
Supplying and errecting centering to sides and soffits including supports and strutting for drainage sides and culvert body wall sides using M.S Sheets of size 90cm x 60cm and B.G 10stifened with welded mild steel angles of size 25mm x 25mm x 3mm for boarding laid over( silver oak joists ) of size 10cm x 6.50cm spread at about 90cm including all labour charges and cost and conveyance of all materials to site etc. complete Complying with Standard Specification
Plain surface
upto 1.0m height
Plain cement concrete 1:2:4 mix (One cement two sand and four aggregate) using 20mm size ISS gauge HBBG metal including mixing, laying, consolidating, curing, cost and conveyance of all materials to site and all labour charges etc., complete as per standard specification
Providing and laying in position, standardized concrete mix M-20 Grade in accordance with IS 456-2000,using 20mm and downgraded hard broken granite stone jelly for all RCC items of works with minimum cement concrete of 325kg/M3 and maximum water cement ratio of 0.55, including admixture (plasticizer/super plasticizer) in recommended proportions as per IS :9103 to accelerate ,retard setting of concrete , improve workability without preparing strength and durability with about ( 5 cu.m) 7730 kg of 20mm machine crushed stone jelly and with about (3.30cu.m) 5156 kg of 10-12mm machine crushed stone jelly and with about (4.79cu.m) 7670kg of sand, but excluding cost of reinforcement grill and fabricating charges , centering and shuttering and also including laying , vibrating with mechanical vibrators ,finishing curing etc., and providing fixtures like fan clamps in the RCC floor/roof slabs wherever necessary without claiming etc., complete
Supply and fabrication and placing in position of TMT steel roads to required size and length as directed by the departmental officers including cost of binding wire, cutting, bending and tying with proper position etc., including cost and conveyance of all materials to site and all labour charges etc., complete Complying with Standard Specification
Plastering with cement mortar 1:3 mix, 20mm thick including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing etc. complete . complying with std. specifications
Conveyance of Excavated Excess Earth away from the site to 2km including loading and transportation charges etc., complete as per standard Specification.
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.54 MB
BOD.pdf
Tender Documents • 0.88 MB
BOQ_794697.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid