Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance S F NO 472 C3 VINAYAGA GARDEN SUKKALIYUR KARUR 639 003 | KARUR | KARUR | TAMIL NADU | 639003 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
EMD Value
₹11,800
Closing Date
29 Jun 2021, 2:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE/SEDC/Salem
O/o.The Superintending Engineer, TANGEDCO, Kamaraj Nagar Colony, Udayapatty, Salem - 636014
Works Contract for Bifurcation of existing Hasthampatty feeder off from Hasthampatty SS into new Vincent feeder in Hasthampatty Section, Maravaneri Sub-Division, East Division
2021_EB_202053_1
SE/SEDC/WC.007/2021-22 Dt.31.05.2021
Open Tender
Electrical Works
Works
90 days
Hasthampatty
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹11,800
30 Jun 2021
4 Jun 2021
30 Jun 2021
4 Jun 2021
29 Jun 2021
4 Jun 2021
90 days
Amount
Supply of materials
Supply of 22 KV HT Aerial Bunched Cable of size 3x95 Sq.mm (Phase) + 1x95 Sq.mm Bare messenger (Inclusive of 5% Sag)
End Termination Kits
Suspension Clamp Assembly including Pole Clamp
Dead End Clamp / Anchor Clamp Assembly including brackets, Pole Clamp
Labour Charges
Erection of 22 KV HT AB Cable of Size 3 x 95 Sq mm (Phase) + 1 x 95 Sq mm Bare Messenger (Inclusive of 5% Sag)
Erection of END Termination Kits
Erection of 22 KV Polimer Disc Insulators
Erection of Tapping Channel
Loading of Poles upto 9.0 mtrs
Unloading of Poles upto 9.0 mtrs
Transporting of Line Materials
Transporting of 9.0 mtr Psc pole
Transporting of poles from Road side to Pole pit upto 9.0 mtr
Excavation of Pole Pit for 9.0 mtr Psc pole
Erection of 9.0 mtr PSC Pole
Dismantling of RSJ Pole 42 feet
Dismantling of Tapping Channel
Dismantling of Disc
Erection of Suspension Clamp Assembly Including Pole Clamp
Erection of Dead End Clamp/Anchor Clamp Assembly Including Brackets,Pole Clamps
E.S.I. @ 3.25 % should be Entered by the Bidder.
E.P.F. @ 13 % should be Entered by the Bidder.
G.S.T. @ 18% should be Entered by the Bidder.
SENTUR CONSTRUCTIONS
SRI LAKSHMI POWER INFRA
stage.html
html • 0.02 MB
finance_240669.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .