Loading…
Loading…
Tender Value
₹15.8 L
EMD Value
₹1.6 L
Closing Date
15 Sept 2026, 12:00 pm
EE PD PWD Bulandshahar
EE PD PWD Bulandshahar
Repair of bridges, culverts, and patri repair on various roads under the Lakhawati and Jahangirabad block in year 2026-27 in District Bulandshahr.
2026_CEMRT_1174271_5
5072/1A Dt. 25.07.2026
Open Tender
Civil Works - Roads
Percentage
120 days
Bulandshahar
Please refer Tender documents.
3 documents required · 3 mandatory
₹944
₹1.6 L
Yes
EE PD PWD Bulandshahar
15 Sept 2026
11 Aug 2026
15 Sept 2026
11 Aug 2026
15 Sept 2026
11 Aug 2026
11 Aug 2026 - 12 Aug 2026
12 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. MORT&H Specification 304 Sr No 3.13. Including cost of, all material, labour, T&P and Labour cess etc. complete but excluding GST. | 90 | Cum | 90 | ₹8,100 |
| 2 | Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. MORT&H Specification 2100 Sr No 12.04 Including cost of, all material, labour, T&P and Labour cess etc. complete but excluding GST. | 140 | Cum | 6,000 | ₹8,40,000 |
| 3 | Brick Masonry Work in Cement Mortar 1:3 in Foundation complete excluding Pointing and Plastering, as per Drawing and Technical Specifications. Including cost of, all material, labour, T&P and Labour cess etc. complete but excluding GST. | 90 | Cum | 6,800 | ₹6,12,000 |
| 4 | Pointing with cement mortar (1:3 ) on brick work in substructure as per Technical Specifications MORT&H Specification 1300 & 2200 Sr No 13.02 Including cost of, all material, labour, T&P and Labour cess etc. complete but excluding GST. | 400 | Sqm | 75 | ₹30,000 |
| 5 | Plastering with cement mortar (1:3 ) on brick work in sub-structure as per Technical Specifications MORT&H Specification 1300 & 2200 Sr No 13.03 Including cost of, all material, labour, T&P and Labour cess etc. complete but excluding GST. | 260 | Sqm | 155 | ₹40,300 |
| 6 | Earth work in embankment with ordinary soil in 20 cm. Layers including ramming and dressing the surface to required levels and slopes and also including 1.50 M. lift with carted earth up to 5.000 km distance. as directed by the Engineer in charge including all labour T&P etc. required for proper completion of the work. Including cost of all material, labour, T&P, all taxes and labour cess complete. But excluding GST. | 200 | Cum | 245 | ₹49,000 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.52 MB
BOQ_2206069.xls
BOQ • 0.90 MB
T1.pdf
Tender Documents • 1.36 MB
5318.pdf
PDF • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].