SE P and W
Sarni
Various electrical works during AOH COH of unit 8 and 9.
2019_MPPGC_8724_2
STPS/WT2607
Open Tender
Electrical Works
Item Wise
20 days
Sarni
As per NIT
5 documents required · 5 mandatory
₹500
Yes
Payable To
₹15,300
Yes
31 Jan 2020
18 Mar 2019
5 Apr 2019
18 Mar 2019
1 Apr 2019
18 Mar 2019
OH work of 415V LT motors of unit 8& 9 PH-III in forth coming overhaul of units.
A/H soot blower, LP dozing, LOP of PA fan, ID fan
ID & PA fan motor brg. LOP,
A/H guide brg., support brg. LOP
SEE system Ty. Panel cooling fan motor
SEE Transformer cooling fan motor
A/C gun cooling, HP dozing pump, DC Gun cooling, VE fan motor, Alum agitators pump and strainer(WT) plant.
Travelling water screen motor
AC scanner, DC scanner, coal feeder motor(dyno-drive), instrument air dryer motor, AC blower, Chilling unit fan,
Slag conveyor, FD fan & BFP motor LOP, condenser tube cleanaing motor, dewatering pump motor
HP/ LP bypass valve motor, AC seal oil pump motor, DG set pump, Uni-filter water supply motor, FD fan LOP motor.
Stator water pump & oil centrifuge pump motor
Hotwell make up pump, AH main drive, A/C blower motor, DC seal oil pump motor, chilled water, H2 plant compressor motor,
AH main drive, LO pump, ignitor air fan, clinker grinder DC LOP motor.
Seal water pump, oil transfer pump, water supply motor at unifilter and surface water pump, clear water pump motor(WT) plant
Raw water pump motor, BCW pump, air washer cooling pump motor,
AC LOP motor, DM water pump motor
HO pump, barring gear motor TABP pump motor
Seal air fan motor, AC cooling water pump motor
Boiler filling pump, air washer fan motor
Wash water pump motor
AC compressor, domestic water
BABP motor, HP pump motor
Drip pump, HP wash pump
Fire water pump motor, LP pump motor
Instrument & plant air compressor motor
Description of Work / Item(s)
Various overhaul works of soot blowers
Complete OH work of soot blower rotary motor travel motors including disconnection, shifting & re-installation.
Repairing & painting of soot blower motor covers by paint of standard quality
Cleaning & tightness of soot blower 415V bus & its motor modules.
Cleaning & replacement of soot blower JB & limit switch including cable termination.
Description of Work / Item(s)
Various electrical work to be carried out in ESP
Cleaning work of shaft insulator with their housing, replacement of defective insulator if any, painting of complete housing inside and outside.
Determination, dismantling, removal & testing of shaft insulator heater
Determination, dismantling, removal & testing of hopper and support heaters. The work includes fabrication of new GI frame for new heater & filling, packing new glass wool.
OH & painting of disconnecting boxes & fixing of gland rope
Cleaning, painting and tightness of Transformer Rectifier sets
Complete OH work of emitting and collecting, rapping motors including disconnection, shifting & reinstallation.
Repairing, painting of rapping motor covers of standard quality.
Repairing/patching of support insulators box
Cleaning of support insulator and painting work of big size support insulator box size 1980x1080x800mm
Cleaning of support insulator and painting works of small support insulator box size 11980x1080x80mm
Description of Work / Item(s)
Cleaning, tightness, checking and overhauling work of various 415V bus
Cleaning, tightness, checking and overhauling work of various 415V bus during AOH/COH period of Unit no. # 8 & 9 and station . a/ USS sw.gear – 4 b/ TG MCC – 4 c/ BMCC – 4 d/ N/E bus – 2 e/ ESP sw.gear – 4 f/ CW MCC – 1 g/ WT MCC – 2 h/ Ash handling MCC – 2 i/ Fuel oil MCC – 2 j/ DC bus. – 3 k/ Station bus 415V - 2 Cleaning, tightness checking and overhaul work of various 415V motor module of various MCC mentioned as above. The OH work covers the module as under: I / Module type up to 30KW motors. Il / Module type up to 30KW to 100KW motors.
Cleaning and bus tightening of 6.6KV sw.gear. Location: 6.6 KV #8 sw.gear station bus DA & DB # 9
CONTRACTO CONSTRUCTION CO
TAPASYA ENGINEERING
SOURABH ENGINEERING
CONTRACTO CONSTRUCTION CO
CONTRACTO CONSTRUCTION CO
SOURABH ENGINEERING
CONTRACTO CONSTRUCTION CO
SOURABH ENGINEERING
Cleaning work of shaft insulator with their housing, replacement of defective insulator if any, painting of complete housing inside and outside.
Cleaning, tightness, checking and overhauling work of various 415V bus during AOH/COH period of Unit no. # 8 & 9 and station . a/ USS sw.gear – 4 b/ TG MCC – 4 c/ BMCC – 4 d/ N/E bus – 2 e/ ESP sw.gear – 4 f/ CW MCC – 1 g/ WT MCC – 2 h/ Ash handling MCC – 2 i/ Fuel oil MCC – 2 j/ DC bus. – 3 k/ Station bus 415V - 2 Cleaning, tightness checking and overhaul work of various 415V motor module of various MCC mentioned as above. The OH work covers the module as under: I / Module type up to 30KW motors. Il / Module type up to 30KW to 100KW motors.
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .