| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹36.5 LAdmitted-Fee/PreQual/Technical/Finance | -3.50% | ₹36.5 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹37.6 L+₹1.1 L (3.06%)Admitted-Fee/PreQual/Technical/Finance | -0.55% | ₹37.6 L+₹1.1 L (3.06%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹37.8 L+₹1.3 L (3.51%)Admitted-Fee/PreQual/Technical/Finance | -0.11% | ₹37.8 L+₹1.3 L (3.51%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹44.6 L
EMD Value
₹89,200
Closing Date
2 Sept 2026, 4:00 pmClosed
Executive Engineer RnB Division Kulgam
Executive Engineer RnB Division Kulgam
Construction of Road from Razloo Adda to Reedinard at Kund
2026_PWDJK_322624_6
59/2026-27/RnB/Kul/5959-69 Dtd 27-08-2026
Open Tender
Civil Works
Percentage
120 days
Kulgam
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,100
Account No. 0470010200000099
₹89,200
7 Sept 2026
28 Aug 2026
3 Sept 2026
28 Aug 2026
2 Sept 2026
28 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunk and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material. | |||||
| 1.01 | Beyond 30 cm girth upto and including 60 cm girth. | 18 | No | 332.2 | ₹5,979.66 |
| 1.02 | Beyond 60 cm girth upto and including 120 cm girth. | 8 | No | 1,475.42 | ₹11,803.39 |
| 1.03 | Providing & laying of RCC spun pipes including necessary earthwork in excavation and filling cushion over pipes including cost and carriage of all materials complete.450mm dia | 29.28 | Rm | 2,966.1 | ₹86,847.46 |
| 1.04 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by
Engineer-in-Charge. All kinds of soil : | 312 | Cum | 164.2 | ₹51,230.4 |
| 2B/Wall | |||||
| 3 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for
foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts,
wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides
and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and
disposal of surplus excavated earth as directed, within a lead of 50 metres: | 55 | Cum | 225.18 | ₹12,384.79 |
| 4 | Providing and laying stone soling dully hand packed in maintaning level and section including carriages of all materials complete | 5 | Cum | 847.46 | ₹4,237.29 |
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) incld: all carriage | 3.75 | Cum | 4,909.49 | ₹18,410.59 |
| 6 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 40 mm nominal size) incld: all carriage | 61.2 | Cum | 6,129.19 | ₹3,75,106.21 |
stage.html
html • 0.02 MB
finance_1082781.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.50 MB
BOQ_1082781.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .