Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 LAccepted-AOC | L1 | Accepted-AOC Accepted |
Tender Value
Refer Docs
EMD Value
₹2,360
Closing Date
3 Mar 2022, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer Sirsa W/S Division Sirsa
Executive Engineer Sirsa W/S Division Sirsa
Repairing of W/c crossing outlet RD 87200-R Bani Disty. over NKC.
2022_HRY_209741_1
Repairing of W/c crossing O/L RD 87200-R Bani Dy.
Open Tender
Civil Works
Item-rate/Agreement basic
30 days
Near village Naiwala in Distt. Sirsa
Please refer Tender documents.
4 documents required · 4 mandatory
₹500
₹2,360
Yes
11 May 2022
25 Feb 2022
4 Mar 2022
25 Feb 2022
3 Mar 2022
25 Feb 2022
90 days
Amount
Demolishing brick work manually/by mechanical means icluding stacking of serviceable material and disposal of unserviceable material within 50 mtr lead as per direction of EIC in cement mortar. HSR 5.7.4
Brick work with common burnt clay non-modular bricks of class designation 7.5 in Foundation and plinth in 1:3, HSR 7.21
Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect below plinth level, Thermo- Mechanically Treated bars of grade Fe-500D kg or more. HSR 6.33.6
Credit of dismentalled material of brick work in cement sand mortar.
Providing & laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement all work upto plinth level 1:1 5:3 (1 cement : 1:5 coarse sand (zone III): 3 graded stone aggregate 20mm nominal size). HSR 6.14.1
centering & shuttering including strutting, proping etc and removal of form for suspended floors, roofs landings and balconies, HSR 6.30.3
Plastering (12mm thick) with Cement mortar (1:3) on brick work in sub structure as per MoRT&H specification. HSR 11.5.2
Providing & laying in position cement concrete of specified grade excluding the cost of centering & shuttering - All work below plinth level and upto floor IV level in : 1:4:8 (1 cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40mm nominal size). HSR 6.1.6
Earth work excavation by mechnical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5m in width or 10sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50m. HSR item No. 4.14
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .