Loading…
Loading…
Tender Value
₹2.2 L
EMD Value
₹4,436
Closing Date
16 Oct 2026, 3:00 pm7d left
EE,CD,APWD,CAR NICOBAR
Office of the Executive Engineer Construction Division APWD Car Nicobar
Construction of Temporary Fencing of BJR Hospital Car Nicobar.
2026_APWD_25109_1
e-tender-DB/CD/CN/2026-27/2453
Open Tender
Civil Works - Buildings
Percentage
30 days
At BJR Hospital Car Nicobar
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹4,436
Yes
8 Oct 2026
8 Oct 2026
16 Oct 2026
8 Oct 2026
16 Oct 2026
9 Oct 2026
9 Oct 2026 - 10 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge. | |||||
| 1.1 | All kinds of soil | 1.9 | cum | 252 | ₹478.8 |
| 2Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : | |||||
| 2.1 | 1:3:6 (1 Cement : 3 coarse sand (zone-Ill) derived from natural sources : 6 graded stone aggregate 40 mm nominal size derived from natural sources) | 0.2 | cum | 20,693.45 | ₹4,138.69 |
| 3Centering and shuttering including strutting, propping etc. and removal of form for | |||||
| 3.1 | Foundations, footings, bases of columns, etc. for mass concrete | 1.95 | sqm | 502.8 | ₹980.46 |
| 4Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. | |||||
| 4.1 | Electric resistance or induction butt welded tubes | 220.35 | kg | 234.15 | ₹51,594.95 |
| 5Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. | |||||
| 5.1 | In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works | 344.05 | kg | 241.85 | ₹83,208.49 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.02 MB
TenderDocumentTFen.pdf
Tender Documents • 1.39 MB
BOQ_26560.xls
BOQ • 0.33 MB
Instructions-to-bidders.pdf
Additional Documents • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .