Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.2 LAccepted-AOC CENTRAL COALFIELDS LIMITED OFFICE OF THE PROJECT OFFICER E M DEPARTMENT SAUNDA D BARKA SAYAL AREA | BOKARO | JHARKHAND | 825102 | L1 | Accepted-AOC Accepted as L1 as per NIT | |
| 2 | L2₹3.3 L+₹5,585.18 (1.72%)Rejected-Finance MAIN ROAD RAMGARH CANTT 829122 | RAMGARH | RAMGARH | JHARKHAND | 829122 | L2 | Rejected-Finance Rejected as L2 as per NIT | |
| 3 | L3₹3.5 L+₹28,980.80 (8.95%)Rejected-Finance NEAR RELIANCE PETROL PUMP RAMGARH CANTT 829122 DIST RAMGARH JHARKHAND | RAMGARH CANTT | RAMGARH | JHARKHAND | 829122 | L3 | Rejected-Finance Rejected as L3 as per NIT | |
| 4 | L4₹3.6 L+₹40,453.70 (12.5%)Rejected-Finance 521 UBI ROAD SINGRAULI SINGRAULI SINGRAULI MADHYA PRADESH 486889 | SINGRAULI | MADHYA PRADESH | 486889 | L4 | Rejected-Finance Rejected as L4 as per NIT |
| Sl No | Description | Qty | Unit | Rajneesh Electricals L3 | M.k. Traders L2 | Sandeep and Co. L4 | CENTRAL ENGINEERS L1 |
|---|---|---|---|---|---|---|---|
| 1.01 | 315 KVA, 3.3KV, 440 Volt Transformer make GEC Local SI.No 4 Cost of Copper Wire/Strip 8 No | 100.8 | Kg | 1,200 ₹1,20,960 | 1,119 ₹1,12,795.2 Lowest | 1,231 ₹1,24,084.8 | 1,400 ₹1,41,120 |
| 1.02 | Cost of Insulating materials | 1 | LS | 45,360 ₹45,360 | 42,298 ₹42,298 | 46,545 ₹46,545 | 30,000 ₹30,000 Lowest |
| 1.03 | Labour cost | 1 | LS | 45,360 ₹45,360 | 42,298 ₹42,298 | 46,545 ₹46,545 | 30,000 ₹30,000 Lowest |
| 1.04 | Online oil Filteration of Transformer at Site | 580 | Ltr | 18 ₹10,440 | 15 ₹8,700 Lowest | 20 ₹11,600 | 38 ₹22,040 |
| 1.05 | Supply & Fixing of HV Bushing with Studs | 2 | No | 11,200 ₹22,400 | 11,110 ₹22,220 | 12,000 ₹24,000 | 5,000 ₹10,000 Lowest |
| 1.06 | 50 KVA Transformer Cost of copper wire/strip 8 no | 16 | Kg | 1,200 ₹19,200 | 1,119 ₹17,904 Lowest | 1,231 ₹19,696 | 1,400 ₹22,400 |
| 1.07 | Cost of Insulating materials | 1 | LS | 7,200 ₹7,200 | 6,714 ₹6,714 | 7,386 ₹7,386 | 5,000 ₹5,000 Lowest |
| 1.08 | Labour cost | 1 | LS | 7,200 ₹7,200 | 6,714 ₹6,714 | 7,386 ₹7,386 | 5,000 ₹5,000 Lowest |
| 1.09 | Supply & Fixing of HV Bushing with studs | 3 | No | 7,000 ₹21,000 | 6,550 ₹19,650 | 7,200 ₹21,600 | 3,000 ₹9,000 Lowest |
| 2.00 | Total impact of GST for the purpose of CTC | 1 | Nos | 53,841.6 ₹53,841.6 | 50,272.78 ₹50,272.78 | 55,591.7 ₹55,591.7 | 49,420.8 ₹49,420.8 Lowest |
Tender Value
₹3.3 L
EMD Value
₹4,200
Closing Date
13 Mar 2025, 4:00 pmClosed
Colliery Manager (M), Manager(F), P.E(EnM)
Project Engineer (EnM), Kathara Colliery
Complete rewinding/Repairing of 315KVA, 3.3KV, 440 Volt Transformer make GEC Local SI No-4 and 50 KVA Transformer of Kathara Colliery under Kathara Area.
2025_CCL_330730_1
KTC/PE/EnM/24-25/225 Date-28.02.2025
Open Tender
Electrical and Maintenance Works
Item Rate
10 days
P.E. (EnM), Office of the PO, Kathara Colliery
Complete rewinding/Repairing of 315KVA, 3.3KV, 440 Volt Transformer make GEC Local SI No-4 and 50 KVA Transformer of Kathara Colliery under Kathara Area.
6 documents required · 6 mandatory
₹4,200
Yes
18 Oct 2025
1 Mar 2025
14 Mar 2025
3 Mar 2025
13 Mar 2025
3 Mar 2025
3 Mar 2025 - 10 Mar 2025
stage.html
html • 0.05 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .