Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.7 LAccepted-AOC | 1 | Accepted-AOC L-1 | |
| 2 | 2₹2.8 L+₹8,806 (3.24%)Rejected-AOC | 2 | Rejected-AOC L-2 | |
| 3 | 3₹2.9 L+₹17,420 (6.40%)Rejected-AOC | 3 | Rejected-AOC L-3 | |
| 4 | 4₹3.3 L+₹55,685 (20.5%)Rejected-AOC 01 KATYANI CONSTRUCTION COMPANY H NO 1 SHOP NO 1 RATAN LAL NAGAR KANPUR NAGAR UTTAR PRADESH 208022 | KANPUR NAGAR | UTTAR PRADESH | 208022 | 4 | Rejected-AOC L-4 | |
| 5 | 5₹3.5 L+₹75,220 (27.7%)Rejected-AOC | 5 | Rejected-AOC L-5 |
Tender Value
₹4.4 L
EMD Value
₹5,000
Closing Date
1 Dec 2020, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE
ETC-II, UPPTCL, PARESHAN BHAWAN, VIBHUTI KHAND, GOMTI NAGAR, LUCKNOW-226010
INSTALLATION, ERECTION AND COMMISSIONING OF 01 NO. 60 MVA TRANSFORMER-III AT 220/33 KV S/S DAHI CHOWKI, UNNAO
2020_UPTCL_528078_1
ETC-II/L/56/2020-21
Open Tender
Electrical Works
Item Rate
60 days
UNNAO
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
SE, ETC-II, UPPTCL, LUCKNOW
₹5,000
19 Jul 2021
5 Nov 2020
2 Dec 2020
5 Nov 2020
1 Dec 2020
5 Nov 2020
120 days
Amount
Following works are to be carried out for the work of Installation, Erection & Commissioning of new 60 MVA 220/33 KV T/F-III at 220 KV S/S Dahi Chowki, Unnao alongwith associated works including all cost of men, misc. consumables, T&P, crane, 6/12 KLPH capacity Centrifuging M/C with operator etc. to complete the job.
Shifting of Main Tank of new 60 MVA T/F-III to Plinth from place of storage up to 20 meter distance including turning of tank if required.
a) Shifting of T/F-III Tank upto 20 Meter distance.
b) Additional Shifting of 05 Mtr.
Complete Erection of new 60 MVA T/F-III including 'A' Frame, Header, Radiators, Conservator Tank. Bushings, Connecting Pipe Lines, Cooling Fans & Pumps, Marshalling Box, OTI WTI, Capillary Pipes etc.
Filling of fresh T/F Oil from T/F Oil drums in suitable capacity oil tank and then centrifuging of the T/F oil by Ultra High Vacuum Oil Filtration Plant after connecting the centrifuging pipes with oil tanker to oil filtration plant including taking the BDV values of oil periodically till the required value is achieved and creating the vacuum inside new 60 MVA T/F-II before filling the oil including Vacuum stand test, with all cost of centrifuging machine, CFM operator, Lubricants etc.
Centrifuging/Dehydration of the complete T/F oil of new 60 MVA T/F-II by Ultra High Vacuum Oil Filtration Plant after connecting the Centrifuging Pipes with T/F Tank to oil filtration plant including taking the BDV values of oil and megger values of the T/F periodically till the required value is achieved including filling & topping up to the above prepared T/F oil under vacuum in main tank. Radiator, Conservator tank etc. and Attending the oil leakages if any, with all cost of centrifuging machine, CFM operator, Lubricants etc.
Earthing main tank marshalling box drive mechanism T/F neutral etc. of new 60 MVA T/F-III with the help of 50X6mm/75X10mm size MS flat to be provided by department, its jointing with already laid earthmat/deltas at 2 place and necessary modification in existing support for earthing of neutral bushing support for its earthing work and painting of earthing strips as per technical specifications/standard practice.
Delta Earthing consisting of fabrication of 03 Nos. 3 Mtr. Long electrodes (40 mm dia), its placing inside ground and connection all 3 electrodes with 75x10mm M.S. flat and connection the same with main earthmat at 2 places as required, excluding the cost of M.S. Bar & Flat.
Jumpering of HV bushings of new 60 MVA T/F-III from 220 KV CT and LA with the help of newly prepared single ACSR zebra conductor.
Jumpering of LV bushing of new 60 MVA T/F-III with 33 KV Jack bus with the help of newly prepared twin ACSR zebra conductor and jumpering of 30 KV LA with single ACSR Zebra Conductor.
Dismantling of 03 Nos. ALP, earthing then after erection of 60 MVA T/F erection of 03 Nos. ALP and 03 Nos. 30 KV LA after erection earthing of structure and 30 KV LA by 50x6mm MS Flat. Painting of earthing strip with one coat of red oxide primer and two coat of green colour paint.
Erection of new 60 MVA T/F-III RTCC Panel including shifting from storage place to control room.
Cable laying from 60 MVA T/F-III marshalling box to RTCC panel and C&R panel after cable laying all the cable dressed in cable trench with the help of GI wire. (GI wire provided by contractor).
Connection of the control & power cables as per new cable schedule of new 60 MVA T/F-III & its OLTC/RTCC panels at both ends and control & relay panel, cooling fans & pumps, marshalling box etc. using existing cable including laying. Dressing & binding of additional control cables, if required as per site requirement and termination alongwith making necessary holes in the glands plates or box wherever required. Fixing of cable glands of appropriate size, providing of ferrules and cable termination as per standard & all other associated works as per technical specification.
TAJ ENTERPRISES
MANAS ELECTRICALS
Katyani Construction Co.
M/s Mayur Oil Filtration
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .