Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.9 LAccepted-AOC | ₹3.9 L | L1 | Accepted-AOC L1 Accept |
| 2 | L2₹4.0 LRejected-Finance | ₹4.0 L | L2 | Rejected-Finance L2 Reject |
| Sl No | Description | Qty | Unit | RAJARAJARAMACHANDRAN L1 | s SATHIYARAJA L2 |
|---|---|---|---|---|---|
| 1.00Repairs to 100000 Litres OHT at Indhira Nagar Habitation in Mavadukuruchi Panchayat | |||||
| 2.00 | Clean removal of Cement plaster from walls and clearing away from the site including cost and conveyance all materials and labour charges etc., complete | 54.21 | Sq.m | 12 ₹650.52 | 13 ₹704.73 |
| 3.00 | Earth work excavation in hard stiff clay soil and all classess of soil and depositing on bank with initial lead and lift as per SS20B. | 1.91 | Cu.m | 262.5 ₹501.38 | 264.5 ₹505.20 |
| 4.00 | Cement concrete 1 : 4 :8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed for base course below Wearing course to Street | 1.24 | Cu.m | 6,009 ₹7,451.16 | 6,010 ₹7,452.40 |
| 5.00 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire) | 0.6 | MT | 91,982 ₹55,189.20 | 91,983 ₹55,189.80 |
| 6.00 | Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. (Payment for centering shall be given after the concrete is laid) | 22.68 | Sq.m | 1,095 ₹24,834.60 | 1,095 ₹24,834.60 |
| 7.00 | Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers | 7.42 | Cu.m | 9,763 ₹72,441.46 | 9,765 ₹72,456.30 |
| 8.00 | Special ceiling plastering and finishing the exposed surface of all RCC items of work such as slabs, beams, sunshades, facia, canopy slab, staircase waist slab, landing slab etc., with Cement Mortar 1:3 (One Cement and Three P.Sand) 10mm thick including hacking the surfaces, providing cement mortar nosing, beading for sunshades, staircases, steps, landing slabs and curing, etc., in all floors complying with standard specification and as directed by the departmental officers | 14.4 | sqm | 330 ₹4,752 | 335 ₹4,824 |
| 9.00 | Scaffolding Charges for Plastering work | 45.94 | sqm | 890 ₹40,886.60 | 895 ₹41,116.30 |
| 10.00 | Colour washing two coats in all floors using best freshly burnt white shell lime and best quality of approved variety of colouring pigment including cost of lime, colouring pigments, fevicol type gum, brushes, scaffolding charges etc., complete complying with standard specification. Mineral colouring pigments not affected by lime should only be used (stainers and colour solutions should not be used.) | 167.03 | sqm | 57.5 ₹9,604.23 | 65 ₹10,856.95 |
Tender Value
₹4.1 L
EMD Value
₹4,140
Closing Date
29 Dec 2025, 3:00 pmClosed
Block Development Office(BP)Peravurani at Avanam
Block Development Office(BP)Peravurani at Avanam
Repairs to 100000 Litres OHT at Indhira Nagar Habitation in Mavadukuruchi Panchayat
2025_RDTN_635546_1
1148/2025/A2
Open Tender
Civil Works
Block Development Office(BP)Peravurani at Avanam
Please refer Tender documents.
9 documents required · 9 mandatory
₹0
₹4,140
Yes
Block Development Office(BP)Peravurani at Avanam
29 Dec 2025
23 Dec 2025
29 Dec 2025
23 Dec 2025
29 Dec 2025
23 Dec 2025
26 Dec 2025
Amount
Repairs to 100000 Litres OHT at Indhira Nagar Habitation in Mavadukuruchi Panchayat
Clean removal of Cement plaster from walls and clearing away from the site including cost and conveyance all materials and labour charges etc., complete
Earth work excavation in hard stiff clay soil and all classess of soil and depositing on bank with initial lead and lift as per SS20B.
Cement concrete 1 : 4 :8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed for base course below Wearing course to Street
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire)
Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. (Payment for centering shall be given after the concrete is laid)
Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers
Special ceiling plastering and finishing the exposed surface of all RCC items of work such as slabs, beams, sunshades, facia, canopy slab, staircase waist slab, landing slab etc., with Cement Mortar 1:3 (One Cement and Three P.Sand) 10mm thick including hacking the surfaces, providing cement mortar nosing, beading for sunshades, staircases, steps, landing slabs and curing, etc., in all floors complying with standard specification and as directed by the departmental officers
Scaffolding Charges for Plastering work
Colour washing two coats in all floors using best freshly burnt white shell lime and best quality of approved variety of colouring pigment including cost of lime, colouring pigments, fevicol type gum, brushes, scaffolding charges etc., complete complying with standard specification. Mineral colouring pigments not affected by lime should only be used (stainers and colour solutions should not be used.)
Provision for Platform
Sand Filling with good river sand filling with good ive sand including cost nd coveyance etc., complete
Cement concete 1:4:8 mix using 40mm HBG metal including cost and conveyance eyc., complete
Cement concete 1:2:4 mix using 20mm HBG metal including cost and conveyance eyc., complete
Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete
GST Amount for providing Service to Government Contract Works for the above Construction Works. {GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
s SATHIYARAJA (BID ID -1544072)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.88 MB
BOQ_760634.xls
BOQ • 0.31 MB
Techmavaduoht.pdf
Tender Documents • 0.42 MB
Pricemavaduoht.pdf
Tender Documents • 0.33 MB
Download all tender documents and submit your bid