Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹2.5 L
EMD Value
₹5,000
Closing Date
2 Jun 2026, 4:00 pmClosed
Executive Engineer
Irrigation Division Shopian
Restoration of Authgami Khul by way of construction of lining wall near RD 950 mtrs
2026_IFC_310506_2
eNIT 02 of 2026-27
Open Tender
Civil Works
Percentage
10 days
Shopian
Please refer Tender documents.
2 documents required · 2 mandatory
₹100
Executive Engineer
₹5,000
3 Jun 2026
21 May 2026
3 Jun 2026
21 May 2026
2 Jun 2026
21 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. | 24.19 | Cum | 592.9 | ₹14,342.25 |
| 2 | Dumping stone excluding cost of stones. in Horizontal on level | 2.48 | Cum | 237.9 | ₹589.99 |
| 3 | Supply of Stone boulder nominal size 225 mm | 2.48 | Cum | 700 | ₹1,736 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 21.98 | Cum | 6,591.25 | ₹1,44,875.68 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form work for: Retaining walls, return walls, walls (any thickness) including attached pilasters
buttresses, plinth and string course fillets, kerbs andsteps etc. | 97.71 | sqm | 628.95 | ₹61,454.7 |
| 6 | Carriage of material by Mechanical Transport .
Sand Avg 33kms from Kakapora | 9.89 | Cum | 553.46 | ₹5,473.72 |
| 6.01 | 20 mm agg. Avg. lead of 12 kms from Narpora | 19.79 | Cum | 305.22 | ₹6,040.3 |
| 6.02 | Cement avg. lead of 3 kms | 7.04 | MT | 147.41 | ₹1,037.77 |
| 6.03 | Stone boulder Nallah Avg. lead of 5kms | 2.48 | Cum | 236.16 | ₹585.68 |
| 7 | Extra carrriage of Materails by Head Load of 250 M
Sand | 9.89 | Cum | 375.43 | ₹3,713 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.71 MB
BOQ_1004392.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .