| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹43.5 LAccepted-AOC | L1 | Accepted-AOC LOWEST | |
| 2 | L2₹44.8 L+₹1.3 L (2.97%)Rejected-Finance 34 B A HOUSE NO 253 3 SECTOR C KALERHARI CHURCH ROAD AMBALA CANTT 133001 | AMBALA CANTT | AMBALA | HARYANA | 133001 | L2 | Rejected-Finance NOT LOWEST | |
| 3 | L3₹46.8 L+₹3.3 L (7.49%)Rejected-Finance A 102 GOLDEN SAND APARTMENTS GAZIPUR DHAKOLI ZIRAKPUR PB 160104 | ZIRAKPUR | S A S NAGAR | PUNJAB | 160104 | L3 | Rejected-Finance NOT LOWEST | |
| 4 | L4₹47.4 L+₹3.8 L (8.74%)Rejected-Finance | L4 | Rejected-Finance NOT LOWEST | |
| 5 | L5₹48.5 L+₹4.9 L (11.2%)Rejected-Finance | L5 | Rejected-Finance REJECT |
Tender Value
Refer Docs
EMD Value
₹1 L
Closing Date
12 Jan 2021, 6:00 pmClosed
CWE Patiala
HQ CWE, Bldg No 26, New Lal Bagh, Patiala 147001
REPAIR TO CERTAIN BITUMINOUS ROADS AND ROAD FURNITURE IN TECH AREA AT FAD DAPPAR UNDER GE PROJECT DAPPAR
2020_MES_404321_1
8320/PAT/T-63/E8
Open Tender
Civil Works
Item Rate
120 days
Dappar
As per cover 1
6 documents required · 6 mandatory
₹500
Yes
GE Project Dappar
₹1 L
Yes
6 Mar 2021
17 Dec 2020
14 Jan 2021
17 Dec 2020
12 Jan 2021
31 Dec 2020
17 Dec 2020 - 24 Dec 2020
Amount
M/L preparing existing black top surface by brushing with wire brushed for removing caked mud etc sweeping with brooms and finally fanning to cleaned surface with gunny bags to remove all loose dirt etc from black top surface , Applying evenly a premix /tack coat with bitumen grade VG-10 @ 5.0 Kg per Ten Sqm complete all as specified and as directed.
Providing and laying Premix Bituminous macadam of consolidated thickness n. exc. 75mm, using paving bitumen binder of grade VG-30 @ and binder content of 4% by weight of total mix with mixing of aggregates and VG-30 bitumen in electronic operated 100-120 TPH batch type hot mix plant, transporting the hot mix from HMP to work site by tippers and laying with hydrostatic paver finisher (Paver shall not be compulsory in case of patch work using B.M.) and as per approved mix and rolled & compacted to required camber and gradient with 8 to 12 tonne smooth wheeled, vibratory and tandem roller, complete all as per Clause 504 MoRTH (5th Rev) specification and as specified and directed. NOTES : 1. The contractor shall quote the rate against Item considering 4% VG-30 bitumen content. Job Mix Formula as per CI. No. 505.3.3 of MORTH (5th Rev) for BM shall be worked out from Thapar Insti. of Engg & Tech Patiala/NIT Kurukhshetra /PEC Chandigarh/CTL for obtaining optimum binder content (OBC) by the Contractor without any financial effect to the Dept and same be submitted to the accepting officer for approval. Any variation in binder content on minus side shall be adjusted @ 42/kg of binder and no adjustment shall be made on plus side. 2. The BM shall be covered with top layer/wearing course within in a maximum of 48 hours. If there is to be any delay, by the contractor the course shall be covered by seal coat to the requirement of Clause 512 of MORTH (5th Rev) before opening to the traffic. The seal coat in such cases shall be considered incidental to the work and shall not be paid for separately. 3. Only packed paving bitumen VG-30 shall be used and same shall also be verified by GE on ground before start of execution of work.
Providing and laying Premix Bituminous concrete 30mm consolidated thickness with 5.5% binder (paving bitumen of grade VG-30) content by weight of total mix and crushed aggregates of grading 2 with mixing of agrgregates and VG-30 bitumen in electronic operated 100-120 TPH batch type hot mix plant, transporting the hot mix from HMP to work site by tippers and laying with hyrdostatic paver finisher and as per approved mix and rolled & compacted to required camber and gradient with 8 to 12 tonne smooth wheeled, vibratory and tandem roller, complete all as per Clause 507 MORTH (5th Rev) specification and as specified and directed. NOTES : 1. The contractor shall quotes the rate against Item considering 5.5% VG-30 bitumen content. Job Mix Formula as per CIause. No. 505.3.3 of MORTH (5th Rev) for BC shall be worked out from Thapar Insti. of Engg & Tech. Patiala/ NIT Kurukshetra/ PEC Changigarh/ CTL for obtaining Optimum Binder Content (OBC) by the Contractor without any financial effect to the Dept and same be submitted to the accepting officer for approval. Any variation in binder content on minus side shall be adjusted @ Rs 42/kg of binder and no adjustment shall be made on plus side. 2. Cost of filler i.e. cement (Ordinary portland cement/OPC) is deemed to be included in quoted unit rate. 3. After spreading of mix as per clause 507.4.7 entire surface during the operation shall be rolled with road roller 8-10 tonne (smooth wheeled) followed with vibratory road roller of 8-10 tonne static weight, followed by finished rolling with 6 to 8 tonne smooth wheel tendom roller as per Clause Nos. 507.4.8 and cost of the same is deemed to be included in quoted unit rate.
Repairs to pot holes any depth not exceeding 1.00 Sqm each including sweeping free from dust and mud or water, scouring sunken surfacesin roads, path etc cutting edges at least 25 mm depth and making good by filling in screened and graded road metal watering and well ramming (including supply of road metal) complete all as specified. Note : Pot holes shall be marked by Engineer-in-Charge before commencement of work and same shall be entered in the MB after making good and before laying of bituminous premix carpet.
Repairs to pot holes any depth not exceeding 1.00 Sqm each including sweeping free from dust and mud or water, scouring sunken surfacesin roads, path etc cutting edges at least 25 mm depth and making good by applying tack coat with bitumen @ 5 Kg/X Sqm, putting in premix bituminous macadam using paving bitumen of grade VG-30 well rammed and sealed with binder @ 9.80 kg mixed with 0.09 cum of stone chippings 6.3 mm size per 10 Sqm and again well rammed including supply of premixed macadam, binder and chipings, depth of pot holes exe 30mm thick, complete all as specified and directed. Note : Pot holes shall be marked by Engineer-in-Charge before commencement of work and same shall be entered in the MB after making good and before laying of bituminous premix carpet.
M & L for 2.5mm thick road marking thermo plastic reflective paint to be carried out mechanically with hot application of material (painting material @ 5 Kg /Sqm ) and glass beads @ 250 gm/Sqm confirming to CI No. 803.4 of MoRTH in strips of 100/150 mm width on road surfaces complete all as specified and directed by Engineer-in-Charge.
Supply and fixing in repairs post delineator made of ABS body fitted with 02 nos 100 mm dia highly reflective acrylic/PMMA reflectors and mounted on mild steel pipe of minium 50 mm dia duly powder coated, ant rust and anti theft steel net including necessary fixing arrangmenet, earthwork, concrete block etc complete all as specified and directed.
S&F Road ultra mind convex mirror and road safety of size 400mm fixed with stainless steel pole of size 50mm dia with grouting in PCC 1:2:4 in base of minimum height 1.75m complete all as specified and directed.
S&F road cat eye 90X110x17mm meeting with ASTM and MoR&TH standards with yellow reflector yellow body colour and two side lens all as specified. The studs shall be fixed to the road surface using the adhesive conforming to IS, as per manufacturers recommendation complete all as specified and directed.
NAVREET CONSTRUCTION
AP BUILDERS
Bal Singh and Sons
Swami Enterprises
singh traders
shree balaji builders
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .